WASHINGTON, DC —
OSHA Inspection: PR CONSTRUCTION, LLC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of PR CONSTRUCTION, LLC. in 1419 SPRING ROAD, WASHINGTON, DC 20010 (NAICS 238130). OSHA activity number 345964142.
Where did this inspection happen?
- Establishment
- PR CONSTRUCTION, LLC.
- Site address
- 1419 SPRING ROAD
- City
- WASHINGTON
- State
- DC
- ZIP
- 20010
- Mailing
- 19226 WARRIOR BROOK DRIVE, GERMANTOWN, MD 20874
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238130
- Employees
- 6
- Ownership type
- A
Citations
5 citations on file for this inspection.
1926.102 A01
- Issued
- Penalty
- Initial $2735.00 · Current $2735.00
General-duty citation text
29 CFR 1926.102(a)(1): The employer did not ensure that each affected employee used appropriate eye or face protection when exposed to eye or face hazards from flying objects: a) Second Floor - Employee was using a Paselode pneumatic nail gun to attach 2 by 6 inch wood framing members and not wearing eye protection, on or about 05/17/2022. b) Second Floor - Employee was using a Makita portable electric circular saw, model number 5007F, serial number 226583K, to cut wood framing members and not wearing eye protection, on or about 05/17/2022. NO ABATEMENT DOCUMENTATION REQUIRED
Recent events (1)
- — Z (S) $2735
1926.501 B13
- Issued
- Abate by
- Penalty
- Initial $5470.00 · Current $5470.00
General-duty citation text
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b): a) Second Floor - Employees working on an open deck while preparing the exterior wall panels were not wearing fall protection and were exposed to an approximate fall hazard of 9 feet 9 inches, on or about 05/17/2022. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet).
Recent events (1)
- — Z (S) $5470
1926.1053 B01
- Issued
- Penalty
- Initial $3646.00 · Current $3646.00
General-duty citation text
29 CFR 1926.1053(b)(1): Where (a) portable ladder(s) was/were used for access to an upper level landing surface and the ladder's length did not allow the ladder side rails to extend at least 3 feet (0.9 m) above the upper landing surface being accessed, the ladder was not secured at its top to a rigid support that will not deflect, and/or a grasping device was not provided to assist employees in mounting and dismounting the ladder: a) Between First and Second Floors - Employees were using a 6 foot portable step ladder to gain access to an upper floor and the ladder was 3 foot, 9 inches short of the landing surface, on or about 05/17/2022. NO ABATEMENT DOCUMENTATION REQUIRED
Recent events (1)
- — Z (S) $3646
1926.1053 B04
- Issued
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.1053(b)(4): Ladder(s) were used for purposes other than the purpose for which they were designed: a) First Floor - Employees were using a 6 foot portable step ladder that was over 3 foot short of the landing surface and was not designed for that type of use, on or about 05/17/2022. NO ABATMENT DOCUMENTATION REQUIRED
Recent events (1)
- — Z (S) $0
1926.1053 B13
- Issued
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.1053(b)(13): The top or top step of a stepladder was used as a step: a) First Floor - Employees were standing on the top step of a 6 foot portable step ladder to gain access to the upper landing, on or about 05/17/2022. NO ABATEMENT DOCUMENTATION REQUIRED
Recent events (1)
- — Z (S) $0
More inspections at PR CONSTRUCTION, LLC.
WASHINGTON, DC—2023-01-11 00:00:00
PR CONSTRUCTION LLC.
WASHINGTON, DC—2022-03-29 00:00:00
PR CONSTRUCTION LLC.
BEL AIR, MD—2019-02-15 00:00:00
PR CONSTRUCTION LLC
ELDERSBURG, MD—2018-12-18 00:00:00
PR CONSTRUCTION LLC
FINKSBURG, MD—2018-10-03 00:00:00
PR CONSTRUCTION LLC
View PR CONSTRUCTION, LLC.'s full OSHA safety record →
More inspections in this industry (NAICS 238130)
FAIRHOPE, AL—2026-07-16
FRANCISCO ARES
WOODHAVEN, MI—2026-07-16
G.J. PERELLI CO., L.L.C.
PHILADELPHIA, PA—2026-07-16
URUS CONSTRUCTION CORPORATION
BERLIN, NJ—2026-07-16
URUS CONSTRUCTION CORPORATION
MERIDIAN, ID—2026-07-15
TRIPLE R CONSTRUCTION LLC
More inspections in DC
WASHINGTON, DC—2026-06-30
U.S. DEPARTMENT OF AGRICULTURE
WASHINGTON, DC—2026-06-16
MACY'S
WASHINGTON, DC—2026-06-02
RIGO MULTISERVICES
WASHINGTON, DC—2026-06-02
DDC CPL LLC
WASHINGTON, DC—2026-06-02
DDC CPL LLC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 345964142.