Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,214Inspections Most recent open 2026-07-16 Last loaded 2026-07-20

OSHA Inspection: COLORADO POWERLINE INC.

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of COLORADO POWERLINE INC. in 10470 S. PROGRESS WAY, PARKER, CO 80134 (NAICS 221122). OSHA activity number 346118326.

Watch Colorado Powerline INC. — free Get an email when a new federal OSHA severe-injury report for Colorado Powerline INC. is published. One employer, no account, unsubscribe in one click.
Site address
10470 S. PROGRESS WAY
City
PARKER
State
CO
ZIP
80134
Mailing
P O BOX 937, SEDALIA, CO 80135
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
221122
Employees
130
Ownership type
A

2 citations on file for this inspection.

1926.651 J02

Other-than-serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $7458.00 · Current $5220.00 Reduced
29 CFR  1926.651(j)(2): Protection was not provided by placing and keeping excavated or other materials or equipment at least 2 feet (.61m) from the edge of excavations, or by the use of retaining devices that were sufficient to prevent materials or equipment from falling or rolling into excavations, or by a combination of both if necessary:  a) On or before August 2, 2022, and at times prior, the soil excavated from the trench was placed directly at the edge of the opening of the trench. Two employees working in the trench were exposed from the excavated soil located above.  The spoil piles were not placed and kept at least 2 feet away from the edge of the trench.
Recent events (2)
  • — I (O) $5220
  • — Z (S) $7458

1926.651 K01

Deleted Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $7458.00 · Current $0.00 Reduced
29 CFR  1926.651(k)(1): An inspection of the excavations, the adjacent areas, and protective systems was not conducted by the competent person prior to the start of work and as needed throughout the shift:  a) On or before August 2, 2022, and at times prior, the employer failed to ensure that a competent person inspected a excavation prior to two employees working in the trench.  Spoil piles were located directly on the trench opening.
Recent events (2)
  • — I (S) $0
  • — Z (S) $7458

View COLORADO POWERLINE INC.'s full OSHA safety record →