Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: LUIS ROLDAN

Federal Agency inspection · Health discipline

On , OSHA opened a federal Agency health inspection of LUIS ROLDAN in 1405 WHITE OAK STREET, JONESBORO, AR 72401 (NAICS 238190). OSHA activity number 346852296.

Watch Luis Roldan — free Get an email when a new federal OSHA severe-injury report for Luis Roldan is published. One employer, no account, unsubscribe in one click.
Establishment
LUIS ROLDAN
Site address
1405 WHITE OAK STREET
City
JONESBORO
State
AR
ZIP
72401
Mailing
2721 KRISTAL DRIVE, JONESBORO, AR 72401
Inspection type
Federal Agency (M)
Scope
Complete (A)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238190
Employees
3
Ownership type
A

5 citations on file for this inspection.

1910.134 A01

Serious Gravity 10 1 instance 2 exposed
Issued
Penalty
Initial $4839.00 · Current $4839.00

Hazardous substances 2460

29 CFR 1910.134(a)(1): Atmospheric contamination was not prevented through the use of engineering controls, such as, but not limited to enclosure or confinement of the operation, general and local ventilation, or substitution of less toxic materials:   On or about July 20, 2023, employees using Mel-Prime water proofing adhesive that contained 45 to 50 percent toluene in an excavation were exposed to hazardous vapors. An employee was exposed to levels that were above the IDLH level of 500ppm and was fatally injured.
Recent events (1)
  • — Z (S) $4839

1910.1200 E01

Serious Gravity 10 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $4839.00 · Current $4839.00

Hazardous substances 2460

29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met: (Construction Reference: 1926.59):  On or about July 20, 2023, employees performed construction activities such as waterproofing using chemical products including, but not limited to, Mel-Prime water proofing adhesive that contained 45 to 50 percent toluene.  A written hazard communication program was not developed to promote the safe handling and use of the hazardous chemical products.
Recent events (1)
  • — Z (S) $4839

1910.1200 G01

Serious Gravity 10 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00

Hazardous substances 2460

29 CFR 1910.1200(g)(1):  Employers did not have a safety data sheet in the workplace for each hazardous chemical which they use:  On or about July 20, 2023, employees performed construction activities such as waterproofing using chemical products including, but not limited to, Mel-Prime water proofing adhesive that contained 45 to 50 percent toluene.  Safety data sheets were not available.
Recent events (1)
  • — Z (S) $0

1926.651 G01 I

Serious Gravity 10 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $4839.00 · Current $4839.00

Hazardous substances 2460

29 CFR 1926.651(g)(1)(i): Where oxygen deficiency (atmosphere containing less than 19.5 percent oxygen) or a hazardous atmosphere existed or could reasonably be expected to exist, such as in excavations in landfill areas or excavations in areas where hazardous substances are stored nearby, the atmospheres in the excavation were not tested before employees entered excavations greater than 4 feet (1.22 m) in depth:  On or about July 20, 2023, at the construction site, a competent person did not identify the excavation used to access the basement where Mel Prime waterproofing adhesive was being applied as a permit required confined space.
Recent events (1)
  • — Z (S) $4839

1926.651 G01 II

Serious Gravity 10 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00

Hazardous substances 2460

29 CFR 1926.651(g)(1)(ii): Adequate precautions were not taken to prevent employee exposure to atmospheres containing less than 19.5 percent oxygen and other hazardous atmospheres:  On or about July 20, 2023, at the construction site, adequate precautions were not taken when accessing the basement where Mel Prime waterproofing adhesive that contained 45 to 50 percent toluene was being applied.  An employee was exposed to levels that were above the IDLH level of 500ppm and was fatally injured.
Recent events (1)
  • — Z (S) $0

View LUIS ROLDAN's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346852296.