LEOMINSTER, MA —
OSHA Inspection: LARRY HATCH
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of LARRY HATCH in 330 BROOKS POND RD, LEOMINSTER, MA 01453 (NAICS 238140). OSHA activity number 346951395.
Where did this inspection happen?
- Establishment
- LARRY HATCH
- Site address
- 330 BROOKS POND RD
- City
- LEOMINSTER
- State
- MA
- ZIP
- 01453
- Mailing
- 1194 ELM ST, LEOMINSTER, MA 01453
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 3
- Ownership type
- A
Citations
5 citations on file for this inspection.
1903.19 C01
- Issued
- Abate by
- Penalty
- Initial $388.00 · Current $388.00
General-duty citation text
29 CFR 1903.19(c)(1): Within 10 calendar days after the abatement date, the employer did not certify to OSHA (the Agency) that each cited violation has been abated, except as provided in paragraph (c)(2) of this section: As of February 27, 2024, the employer had not provided abatement certification for Inspection number 1695139, which was issued on October 4, 2023, and required abatement certification for Citation 1, Item 1, Item 2, and Item 3, which were due on October 31, 2023, with respect to a work location at 330 Brooks Pond Rd., Leominster, MA.
Recent events (1)
- — Z (O) $388
1903.19 D01
- Issued
- Abate by
- Penalty
- Initial $388.00 · Current $388.00
General-duty citation text
29 CFR 1903.19(d)(1): The employer did not submit to the Agency, along with the information on abatement certification required by paragraph (c)(1) of this section, documents demonstrating that abatement is complete for each willful or repeat violation and for any serious violation for which the Agency indicates in the citation that such abatement documentation is required: As of February 27, 2024, the employer had not provided abatement documentation for Inspection number 1695139, which was issued on October 4, 2023, and required abatement documentation for Citation 1, Item 1, Item 2, and Item 3, which were due on October 31, 2023, with respect to a work location at 330 Brooks Pond Rd., Leominster, MA.
Recent events (1)
- — Z (O) $388
1926.451 B01 I
- Issued
- Abate by
- Penalty
- Initial $3349.00 · Current $3349.00
General-duty citation text
29 CFR 1926.451(b)(1)(i): Each platform unit (e.g., scaffold plank, fabricated plank, fabricated deck, or fabricated platform) was not installed so that the space between adjacent units and the space between the platform and the uprights was not more than 1 inch (2.5 cm) wide, except where the employer can demonstrate that a wider space is necessary (for example, to fit around uprights when side brackets are used to extend the width of the platform): 330 Brooks Pond Rd., Leominster, MA: On or about August 17, 2023, an employee was observed working on a prefabricated scaffold platform where the working level of the scaffold was not fully planked. There were gaps of over 6 inches on both of the short ends of the working level.
Recent events (1)
- — Z (S) $3349
1926.1052 C01
- Issued
- Abate by
- Penalty
- Initial $3349.00 · Current $3349.00
General-duty citation text
29 CFR 1926.1052(c)(1):Stairways having four or more risers or rising more than 30 inches (76 cm), whichever is less, were not equipped with at least one handrail: 330 Brooks Pond Rd., Leominster, MA: On or about August 17, 2023, a stairway that did not have a handrail and had at least ten risers, was used to get from the first floor to the second floor to access the work location.
Recent events (1)
- — Z (S) $3349
1926.1053 B04
- Issued
- Abate by
- Penalty
- Initial $3349.00 · Current $3349.00
General-duty citation text
29 CFR 1926.1053(b)(4):Ladders were note used only for the purpose for which they were designed: 330 Brooks Pond Rd., Leominster, MA: On or about August 17, 2023, an employee was using an unopened fiberglass A-frame ladder to reach his work area on top of a tubular steel prefabricated scaffold system.
Recent events (1)
- — Z (S) $3349
More inspections in this industry (NAICS 238140)
RENO, NV—2026-07-16 00:00:00
DC MASONRY
WINNETKA, IL—2026-07-15 00:00:00
CHICAGO STUCCO CO.
LODI, NJ—2026-07-15 00:00:00
J & O MASONRY CONTRACTORS
DORAVILLE, GA—2026-07-14 00:00:00
SUDLOW CONCRETE, INC.
FLAGLER BEACH, FL—2026-07-14 00:00:00
PLANET DESIGN SERVICES, INC.
More inspections in MA
BELLINGHAM, MA—2026-07-16 00:00:00
BELLINGHAM DEPARTMENT OF PUBLIC WORKS
PLYMOUTH, MA—2026-07-15 00:00:00
TECH-ETCH, INC.
WESTFIELD, MA—2026-07-15 00:00:00
BOISE CASCADE BUILDING MATERIALS DISTRIBUTION, L.L.C.
QUINCY, MA—2026-07-15 00:00:00
UNITEDWOR VM CONTRACTOR CORP
FALL RIVER, MA—2026-07-15 00:00:00
CRESCO LABS, INC.
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346951395.