Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,645Inspections Most recent open 2026-07-16 Last loaded 2026-07-20

OSHA Inspection: KW DEVELOPMENT CONTRACTING INC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of KW DEVELOPMENT CONTRACTING INC in 8800 BAY PARKWAY, BROOKLYN, NY 11214 (NAICS 236116). OSHA activity number 347147324.

Watch KW Development Contracting INC — free Get an email when a new federal OSHA severe-injury report for KW Development Contracting INC is published. One employer, no account, unsubscribe in one click.
Site address
8800 BAY PARKWAY
City
BROOKLYN
State
NY
ZIP
11214
Mailing
1323 64TH STREET, BROOKLYN, NY 11219
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236116
Employees
14
Ownership type
A

3 citations on file for this inspection.

1926.451 B02

Serious Gravity 5 1 instance 1 exposed
Issued
Penalty
Initial $3918.00 · Current $2547.00 Reduced
29 CFR  1926.451(b)(2): Except as provided in paragraphs (b)(2)(i) and (b)(2)(ii) of this section, each scaffold platform and/or walkway was not at least 18 inches (46 cm) wide:  Location:  a) Left inside staircase on the 1st Floor of the building.  On or about December 6th, 2023, an employee was priming and sanding the wall in the staircase. The scaffold platforms that an employee was on while priming and sanding the wall were not at least 18 inches wide.
Recent events (2)
  • — I (S) $2546.7
  • — Z (S) $3918

1926.451 C02 II

Serious Gravity 5 1 instance 1 exposed
Issued
Penalty
Initial $3918.00 · Current $2547.00 Reduced
29 CFR  1926.451(c)(2)(ii): Unstable objects shall not be used to support scaffolds or platform units.  Location:  a) Left inside staircase on the 1st Floor of the building.  On or about December 6th, 2023, an employee was priming and sanding the wall in the staircase. Plastic buckets and cylinder blocks on the tread of the staircase were used to support the scaffold platform. Unstable objects were used to support the scaffold and its working platform.
Recent events (2)
  • — I (S) $2546.7
  • — Z (S) $3918

1926.451 F07

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $4610.00 · Current $2997.00 Reduced
29 CFR  1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration. Such activities were not performed only by experienced and trained employees selected for such work by the competent person.  Location:  a) Left inside staircase on the 1st Floor of the building.  On or about December 6th, 2023, employees erected a 1-frame high scaffolding system with plastic buckets and cylinder blocks on the tread of the staircase, which was used to prime and sand walls. The scaffold was not erected by experienced and trained employees under the supervision and direction of a competent person.
Recent events (2)
  • — I (S) $2996.5
  • — Z (S) $4610

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347147324.