Safety Incidents OSHA Severe Injury Reports · 2015–2025
2,004,209Inspections Most recent open 2026-07-13 Last loaded 2026-07-17

OSHA Inspection: DOVER PUMPS & PROCESS SOLUTIONS SEGMENT, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of DOVER PUMPS & PROCESS SOLUTIONS SEGMENT, INC. in 11951 NORTH SPECTRUM BLVD, HOUSTON, TX 77047 (NAICS 339991). OSHA activity number 347233512.

Watch Dover Pumps & Process Solutions Segment, INC. — free Get an email when a new federal OSHA severe-injury report for Dover Pumps & Process Solutions Segment, INC. is published. One employer, no account, unsubscribe in one click.
Site address
11951 NORTH SPECTRUM BLVD
City
HOUSTON
State
TX
ZIP
77047
Mailing
11951 NORTH SPECTRUM BLVD, HOUSTON, TX 77047
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
339991
Employees
125
Ownership type
A

2 citations on file for this inspection.

1910.147 C04 I

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $9795.00 · Current $5877.00 Reduced
29 CFR  1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section:  a) On or about January 25, 2024, in the plastic mold injection area, procedures had not been developed and documented for the control of potentially hazardous energy when employees changed mold die inserts on the following machines:  1.	Van Dorn Injection Mold Machine, Model 300-RS-30F, SN: 2362. 2.	Van Dorn Injection Mold Machine, Model 120HT6, SN: 0739 3.	Van Dorn Injection Mold Machine, Model 170HT, SN: 0804 4.	Van Dorn Injection Mold Machine, Model 230HT500, SN: 1329 5.	Milacron Injection Mold Machine, Model MTS-55, SN: TB201DB010052
Recent events (2)
  • — I (S) $5877
  • — Z (S) $9795

1910.147 D03

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $9795.00 · Current $5877.00 Reduced
29 CFR  1910.147(d)(3): All energy isolating devices that were needed to control the energy to the machine or equipment were not physically located and operated in such a manner as to isolate the machine or equipment from the energy source(s):  a) On or about January 25, 2024, in the plastic mold injection area, employees changed mold die inserts on the following machines whose circuit breakers were not turned off:   1.	Van Dorn Injection Mold Machine, Model 300-RS-30F, SN: 2362. 2.	Van Dorn Injection Mold Machine, Model 120HT6, SN: 0739 3.	Van Dorn Injection Mold Machine, Model 170HT, SN: 0804 4.	Van Dorn Injection Mold Machine, Model 230HT500, SN: 1329 5.	Milacron Injection Mold Machine, Model MTS-55, SN: TB201DB010052
Recent events (2)
  • — I (S) $5877
  • — Z (S) $9795

View DOVER PUMPS & PROCESS SOLUTIONS SEGMENT, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347233512.