GERMANTOWN, WI —
OSHA Inspection: KRENZ & COMPANY, INC.
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of KRENZ & COMPANY, INC. in W132N10940 EISENHOWER DRIVE, GERMANTOWN, WI 53022 (NAICS 333413). OSHA activity number 347773095.
Where did this inspection happen?
- Establishment
- KRENZ & COMPANY, INC.
- Site address
- W132N10940 EISENHOWER DRIVE
- City
- GERMANTOWN
- State
- WI
- ZIP
- 53022
- Mailing
- W132N10940 EISENHOWER DRIVE, GERMANTOWN, WI 53022
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 333413
- Employees
- 60
- Ownership type
- A
Citations
6 citations on file for this inspection.
1910.147 C04 I
- Issued
- Abate by
- Penalty
- Initial $6857.00 · Current $4800.00 Reduced
General-duty citation text
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: (a) On or about September 24, 2024, the employer did not develop, document and implement energy control procedures for equipment/machinery with multiple energy sources. This exposed employees to caught in, crushing and amputation hazards from the inadvertent energization of the equipment.
Recent events (2)
- — I (S) $4799.9
- — Z (S) $6857
1910.147 C06 I
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: (a) On or about September 24, 2024, employees which conduct lock-out/tag-out on equipment were not evaluated, at least annually, to ensure proper implementation of energy control procedures.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.147 C06 II
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.147(c)(6)(ii): The employer did not certify that the periodic inspections have been performed: (a) On or about September 24, 2024, the employer did not certify that periodic inspections were conducted, to ensure energy control procedures were correct and implemented properly.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.212 A01
- Issued
- Penalty
- Initial $11292.00 · Current $7904.00 Reduced
General-duty citation text
29 CFR 1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks: (a) On or about September 24, 2024, the 'China' Spiral Welding Machines' camshafts were not guarded to prevent employees from the moving parts, exposing employees to entanglement hazards. (b) On or about September 24, 2024, the 'China' Spiral Welding Machine's (#3) rotating work station was not guarded to prevent employee exposure to struck-by hazards. (c) On or about September 24, 2024, the guard on the Schenck fan balancing machine was not interlocked to prevent employees from accessing the moving blade during operation, exposing employees to an amputation hazard.
Recent events (2)
- — I (S) $7904.4
- — Z (S) $11292
1910.176 B
- Issued
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.176(b): Storage of material created a hazard: (a) On or about September 24, 2024, racking in the facility was not completely anchored to the floor to prevent displacement and/or collapse.
Recent events (2)
- — I (O) $0
- — Z (O) $0
1910.303 G01 I A
- Issued
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.303(g)(1)(i)(A): For electric equipment operating at 600 volts, nominal, or less to ground, and likely to require examination, adjustment, servicing, or maintenance while energized, the depth of the working space in the direction of access to live parts (as measured from the live parts where they were exposed or from the enclosure front or opening where they were enclosed) was less than indicated in Table S-1 of Subpart S of Part 1910: (a) On or about September 24, 2024, space directly in front of the electrical panel adjacent to the fan cover welding machine (China Welder) was used to store extra parts and materials, which was within the working space of the equipment.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections in this industry (NAICS 333413)
MESA, AZ—2026-06-19 00:00:00
CPX2026XBM831X0026 - CHILLER CITY CORPORATION
ATLANTA, GA—2026-06-04 00:00:00
OSPREY CORPORATION
MIAMI, FL—2026-05-28 00:00:00
FILTER KING, LLC
JACKSONVILLE, FL—2026-05-27 00:00:00
THE SY-KLONE COMPANY, LLC
FARMINGTON, CT—2026-05-27 00:00:00
EBM-PAPST INC.
More inspections in WI
GREEN BAY, WI—2026-07-17 00:00:00
PTS CONTRACTORS, INC.
WAUSAU, WI—2026-07-16 00:00:00
MIRON CONSTRUCTION CO. INC.
ELROY, WI—2026-07-15 00:00:00
WABASH NATIONAL SERVICES, L.P.
SUSSEX, WI—2026-07-15 00:00:00
KINGS SUPERIOR CONSTRUCTION LLC
DELAVAN, WI—2026-07-15 00:00:00
TERONOMY BUILDERS, INC.
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347773095.