SHARON, PA —
OSHA Inspection: HU-FRIEDY GROUP
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of HU-FRIEDY GROUP in 534 VINE AVENUE, SHARON, PA 16146 (NAICS 339114). OSHA activity number 347870750.
Where did this inspection happen?
- Establishment
- HU-FRIEDY GROUP
- Site address
- 534 VINE AVENUE
- City
- SHARON
- State
- PA
- ZIP
- 16146
- Mailing
- 534 VINE AVENUE, SHARON, PA 16146
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 339114
- Employees
- 75
- Ownership type
- A
Citations
3 citations on file for this inspection.
1910.147 C06 I C
- Issued
- Abate by
- Penalty
- Initial $6029.00 · Current $4220.00 Reduced
General-duty citation text
29 CFR 1910.147(c)(6)(i)(C): Where lockout was used for energy control, the periodic inspection did not include a review, between the inspector and each authorized employee, of that employee's responsibilities under the energy control procedure being inspected: a.) Hu-Friedy Group dba Hu-Friedy Manufacturing Company, LLC - On or about 11/8/24, and at times prior thereto, the annual inspection of the energy control procedures was not reviewed between the inspector and each authorized employee. Employees perform servicing and maintenance on equipment including, but not limited to, the pouch line machinery, the extruder, and the press. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $4220.3
- — Z (S) $6029
1910.147 C06 II
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.147(c)(6)(ii): The periodic inspection certification of energy control procedures did not contain the required documentation on identification of the machine or equipment, inspection date, employees included, and the person performing the inspection: a.) Hu-Friedy Group dba Hu-Friedy Manufacturing Company, LLC - On or about 11/8/24, and at times prior thereto, the annual inspection of the energy control procedures was not documented with the required information. Missing information included, but was not limited to, the employees included in the inspection and the person performing the inspection. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.212 A01
- Issued
- Abate by
- Penalty
- Initial $8038.00 · Current $5627.00 Reduced
General-duty citation text
29 CFR 1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks: a.) Hu-Friedy Group dba Hu-Friedy Manufacturing Company, LLC, Pouch Line - On or about 11/8/24, and at times prior thereto, the cutter on the pouch line machine was not adequately guarded to prevent employees from being able to access the point of operation. The guard was not adequate in that employees could reach around or under it. b.) Hu-Friedy Group dba Hu-Friedy Manufacturing Company, LLC, Pouch Line - On or about 11/8/24, and at times prior thereto, the punch on the pouch line machine was not guarded. The area did not have guarding to prevent employees from reaching into the pinch point. The guard was not adequate in that employees could reach around or under it. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $5626.6
- — Z (S) $8038
More inspections at HU-FRIEDY GROUP
RUSH, NY—2024-12-13
HU-FRIEDY GROUP
SHARON, PA—2024-11-08 00:00:00
HU-FRIEDY GROUP
View HU-FRIEDY GROUP's full OSHA safety record →
More inspections in this industry (NAICS 339114)
LAKE ZURICH, IL—2026-06-04
ASTRON DENTAL CORPORATION
SIMPSONVILLE, SC—2026-05-26
77506 - METROMONT
CUYAHOGA FALLS, OH—2026-05-19
COLTENE WHALEDENT INC
SPOKANE VALLEY, WA—2026-03-11
WA317990245 - FABTECH PRECISION SHEET METAL LLC
SPOKANE VALLEY, WA—2026-01-28
WA317989575 - FABTECH PRECISION SHEET METAL LLC
More inspections in PA
MILTON, PA—2026-07-10
HOMETOWN FOODS CHEF BOYARDEE CO.
SUNBURY, PA—2026-07-10
DEMPSEY UNIFORM & LINEN SUPPLY, INC
LANDISVILLE, PA—2026-07-10
FAIRVIEW DEMOLITION LLC
YORK, PA—2026-07-10
AMERICAN SPECIALTY SYSTEMS INC.
WILLIAMSPORT, PA—2026-07-10
INTERNATIONAL PAINT PROS
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347870750.