Safety Incidents OSHA Severe Injury Reports · 2015–2025
2,004,209Inspections Most recent open 2026-07-13 Last loaded 2026-07-17

OSHA Inspection: HU-FRIEDY GROUP

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of HU-FRIEDY GROUP in 534 VINE AVENUE, SHARON, PA 16146 (NAICS 339114). OSHA activity number 347870750.

Watch Hu-Friedy Group — free Get an email when a new federal OSHA severe-injury report for Hu-Friedy Group is published. One employer, no account, unsubscribe in one click.
Establishment
HU-FRIEDY GROUP
Site address
534 VINE AVENUE
City
SHARON
State
PA
ZIP
16146
Mailing
534 VINE AVENUE, SHARON, PA 16146
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
339114
Employees
75
Ownership type
A

3 citations on file for this inspection.

1910.147 C06 I C

Serious Gravity 1 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $6029.00 · Current $4220.00 Reduced
29 CFR  1910.147(c)(6)(i)(C): Where lockout was used for energy control, the periodic inspection did not include a review, between the inspector and each authorized employee, of that employee's responsibilities under the energy control procedure being inspected:  a.)  Hu-Friedy Group dba Hu-Friedy Manufacturing Company, LLC -   On or about 11/8/24, and at times prior thereto, the annual inspection of the energy control procedures was not reviewed between the inspector and each authorized employee.   Employees perform servicing and maintenance on equipment including, but not limited to, the pouch line machinery, the extruder, and the press.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $4220.3
  • — Z (S) $6029

1910.147 C06 II

Serious Gravity 1 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR  1910.147(c)(6)(ii): The periodic inspection certification of energy control procedures did not contain the required documentation on identification of the machine or equipment, inspection date, employees included, and the person performing the inspection:  a.)  Hu-Friedy Group dba Hu-Friedy Manufacturing Company, LLC -   On or about 11/8/24, and at times prior thereto, the annual inspection of the energy control procedures was not documented with the required information.  Missing information included, but was not limited to,  the employees included in the inspection and the person performing the inspection.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.212 A01

Serious Gravity 5 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $8038.00 · Current $5627.00 Reduced
29 CFR  1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks:    a.)  Hu-Friedy Group dba Hu-Friedy Manufacturing Company, LLC, Pouch Line -   On or about 11/8/24, and at times prior thereto, the cutter on the pouch line machine was not adequately guarded to prevent employees from being able to access the point of operation.  The guard was not adequate in that employees could reach around or under it.  b.)  Hu-Friedy Group dba Hu-Friedy Manufacturing Company, LLC, Pouch Line - On or about 11/8/24, and at times prior thereto, the  punch on the pouch line machine was not guarded.  The area did not have guarding to prevent employees from reaching into the pinch point.  The guard was not adequate in that employees could reach around or under it.    ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $5626.6
  • — Z (S) $8038

View HU-FRIEDY GROUP's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347870750.