Safety Incidents OSHA Severe Injury Reports · 2015–2025
105,991Records 70,589Employers 85,836Hospitalizations 27,959Amputations 2015-01-01 2025-11-30

3 Phase Line Construction

Overexertion in pushing, pulling, or turning, unspecified · Fractures

Federal OSHA recorded a severe workplace injury at 3 Phase Line Construction, 94 Princeton Street, N CHELMSFORD, MASSACHUSETTS 01863 on , Fractures, affecting the chest, except internal location of diseases or disorders.

Watch 3 Phase Line Construction for free Get an email when a new federal OSHA severe-injury report for 3 Phase Line Construction is published. One employer, no account, unsubscribe in one click.

An employee was hospitalized with broken ribs while pulling de-energized conductor wiring.

Hospitalized Chest, except internal location of diseases or disorders Wire, cables-nonelectrical

View 3 Phase Line Construction's full OSHA safety record →