Safety Incidents OSHA Severe Injury Reports · 2015–2025
2,276,768Injury reports 135,424Establishments Most recent incident 2025-12-31

OSHA Injury Report: StageRight Corporation / Rogers Group

Injury · Days away from work

On , an injury at StageRight Corporation / Rogers Group in 495 Pioneer Pkwy, Clare, MI, MI 48617 resulted in days away from work. Employee was programmable Operator in sheet metal work (except stampings) manufacturing.

Watch StageRight Corporation / Rogers Group for free Get an email when a new federal OSHA severe-injury report for StageRight Corporation / Rogers Group is published. One employer, no account, unsubscribe in one click.
Parent company
StageRight Corporation
Street
495 Pioneer Pkwy
City
Clare, MI
State
MI
ZIP
48617
On-site location
Fabrication-
Outcome
Days away from work (code 2)
Type
Injury (code 1)
Days away from work
22
Days restricted or transferred
57

Lifting a 45lb part for a lev sled

While lifting the 45lb part- employee strained lower back

Strained lower back

45lb part from a lev sled

Low back strain

Job description
Programmable Operator
SOC code
51-4199: Metal Workers and Plastic Workers, All Other
NAICS code
332322: Sheet metal work (except stampings) manufacturing
NAICS vintage
2012
Employees at this establishment (2024 average)
257
Hours worked at this establishment (2024 total)
518,962
EIN
382513133
Establishment ID
959368
Employer case #
24-06
Date of incident
Time of incident
Not known — the employer filed this case without a time of day.
Filing year
2024
Submitted to OSHA
2025-02-14

View StageRight Corporation / Rogers Group's full OSHA safety record →

Data from OSHA ITA Form 300/301 electronic submissions, filing year 2024. ITA Case Detail records are establishment-reported submissions, not OSHA inspections, so no per-record IMIS deep link exists.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.