San Marcos, CA —
OSHA Injury Report: Vallecitos Water District
Injury · Days away from work
At a glance
On , an injury at Vallecitos Water District in San Marcos, CA 92069 resulted in days away from work. Employee was electrician in water treatment and distribution.
Where did this happen?
- Establishment
- Vallecitos Water District
- Parent company
- Vallecitos Water District
- Street
- 201 Vallecitos de Oro
- City
- San Marcos
- State
- CA
- ZIP
- 92069
- On-site location
- Meadowlark Reclamation Plant
What was the outcome?
- Outcome
- Days away from work (code 2)
- Type
- Injury (code 1)
- Days away from work
- 42
- Days restricted or transferred
- 186
Before the incident
On the morning of [REDACTED] between [REDACTED] and [REDACTED] Employee and another Electrician were installing a new VFD for pump #2 for the secondary effluent pump system.
What happened
On the morning of [REDACTED] between [REDACTED] [REDACTED] Employee and another Electrician were installing a new VFD for pump #2 for the secondary effluent pump system. After removing the old VFD and installing the new VFD. Employee felt a pinch and warmth in the middle area of his left shoulder.
Injury or illness
Pain to left shoulder
Object or substance involved
Variable Frequency Drive
Summary line
Pain Left Shoulder
Employee and industry
- Job description
- Electrician
- SOC code
- 47-2111 — Electricians
- NAICS code
- 221310 — Water treatment and distribution
- NAICS vintage
- 2022
- Avg employees
- 108
- Total hours worked
- 209348
- Establishment ID
- 1251761
- Employer case #
- 2
When (timing detail)
- Date of incident
- Shift started
- 6:30
- Time of incident
- 15:00
- Filing year
- 2025
- Submitted
- 16JAN26:16:55:00
Source
Data from OSHA ITA Form 300/301 electronic submissions, filing year 2025. ITA Case Detail records are establishment-reported submissions, not OSHA inspections — no per-record IMIS deep link exists.