FRENCHTOWN, MT —
OSHA Inspection: STONE CONTAINER CORPORATION
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of STONE CONTAINER CORPORATION in MULLAN ROAD, FRENCHTOWN, MT 59834 (NAICS 000000). OSHA activity number 100568815.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- STONE CONTAINER CORPORATION
- Site address
- MULLAN ROAD
- City
- FRENCHTOWN
- State
- MT
- ZIP
- 59834
- Mailing
- PO BOX 4707, MISSOULA, MT 59806
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Y
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 2631
- Employees
- 716
- Ownership type
- A
Citations
81 citations on file for this inspection.
5(a)(1)
- Issued
- Mar 8, 1991
- Abate by
- Aug 30, 1992
- Penalty
- Initial $1,000 · Current $1,000
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to: The hazard of burns from accidental contact with steam and hot water pipes and the hazard of chemical/hot water burns from a leaking pipe. a) #5 Recovery Room Basement: The steam pipe for the ID fan to the boiler. b) #4 Recovery Room, 1st Floor: The steam pipe for the ID fan to the boiler. c) #3 Recovery Room, 9th Floor: The hot water line and valve for the bi-color light. d) #3 Recovery Room: The pressure matic valve. e) #3 Recovery Room, 8th Floor: The outlet pipe for the #3 recovery. f) #3 Recovery Room, 8th Floor: The root valves for the cleaners. g) #3 Recovery Room, 7th Floor: The steam line and valves for the internal cleaners. h) #3 Recovery Room, 7th Floor: The pressure sending units for the internal cleaners. i) #3 Recovery Room, 5th Floor: The joint for the 50 pound steam line. j) #3 Recovery Room, 4th Floor: The level control pipes for the#3 deaerator. k) #3 Recovery Room, 4th Floor: The steam condensate valve for the #3 recovery. l) #3 Recovery Room, 4th Floor: The blowdown pipe and valve for the #3 recovery. m) #3 Recovery Room, 4th Floor: The feed water by-pass valve and pipe for the #3 denerator. n) #3 Recovery Room, 4th Floor: The 50 pound steam line for the #3 deaerator. o) #3 Recovery Room, 4th Floor: The #4 deaerator insulation was worn off exposing the deaerator. p) #3 Recovery Room, 4th Floor: The black liquor pipe next to the south corner of the #1 deaerator. q) Recovery Room, 3rd Floor: The down leg pipe for the #3 deaerator. r) #3 Recovery Room, 3rd Floor: The vent line for the #3 deaerator. s) #3 Recovery Room, 3rd Floor: The feed water valves for the #3 recovery. t) #3 Recovery Room, 3rd Floor: The bin feed liquor line to the boiler for the #3 recovery. u) #3 Recovery Room, 2nd Floor: The black liquor mix tank for the #3 recovery. v) #3 Recovery Room, 2nd Floor: The 50 pound steam line for the black liquor mix tank. w) #3 Recovery Room, Basement: The air heater valves and pipes for the #3 recovery boiler east side. x) #1 Concentrator, 2nd Floor: The Two 50 pound steam lines and valves for the #1 concentrator liquor heater west side. y) #1 Concentrator, 2nd Floor: The liquor down leg 2nd effect line east side. z) Hog Fuel Building, 5th Floor: The bi-color lights for the hog fuel boiler line. aa) Hog Fuel Building, 2nd Floor: The 150 pound steam line to the fuel oil building. bb) Fuel Oil Heater Building: The steam line to the #1 fuel oil heater. cc) #3 Turbine Generator Pit: The after condenser line to the #3 generator. dd) #2 Turbine Generator Pit: The 150 pound relief valve. ee) #1 Evaporator: The 6 flash tank lines. ff) Kamyr Building, 4th Floor: The pipes for the high pressure pin feeder. gg) CB Washer: The steam securing valve and line for the #1 CB drum. hh) CB Washer, Operating Floor: The #2 batch digester steamline and valves. ii) CB Washer, Operating Floro: The #3 batch digester steamline and valves. jj) Batch Tripper Area: The #1, #3 and #4 blow lines along the walkway of the batch tripper conveyor belt. kk) Pulp Nill, 3rd Floor: The #3 evaporator 2nd effect along walkway. ll) Pulp Mill, 3rd Floor: The isolation steam valve for the #8 150 pount batch digester. mm) Pulp Mill, 3rd Floord: The 1st effect for the #3 evaporators along the walkway. nn) Pulp Mill, 1st floor: The #8 blow line. oo) Recaust Building, Cold End of The #1 Kiln: The #2 scrubber vent pipe. pp) Recovery Roof Area: The recovery raw green liquor and weak wash switch valves for the #1, #1 and #3 pipes. qq) #3 Mud Filter Building: The duck work for the #3 ID fan. rr) #4 Kiln Building: The #4 hot stock vat dilution pipe leaking and spraying weak wash and hot water out onto floor area. Among other methods, one feasible and acceptable abatement method to correct the hazard is to insulate the pipes and fittings and to repair leaks which will reduce or eliminate the likelihood of burns.
Recent events (2)
- — F (S) $1000.00
- — Z (S) $1000.00
1910.22 D01
- Issued
- Mar 8, 1991
- Abate by
- Mar 22, 1991
- Penalty
- Initial $700 · Current $700
1910.24 E
- Issued
- Mar 8, 1991
- Abate by
- Jun 11, 1991
- Penalty
- Initial $700 · Current $700
1910.36 B08
- Issued
- Mar 8, 1991
- Abate by
- Mar 27, 1991
- Penalty
- Initial $500 · Current $500
1910.37 Q01
- Issued
- Mar 8, 1991
- Abate by
- Mar 18, 1991
- Penalty
- Initial $1,000 · Current $1,000
1910.68 E01
- Issued
- Mar 8, 1991
- Abate by
- Mar 13, 1991
- Penalty
- Initial $1,000 · Current $1,000
1910.147 C05 IIB
- Issued
- Mar 8, 1991
- Abate by
- Aug 30, 1992
- Penalty
- Initial $800 · Current $800
Recent events (2)
- — F (S) $800.00
- — Z (S) $800.00
1910.147 C05 IID
- Issued
- Mar 8, 1991
- Abate by
- Aug 30, 1992
Recent events (2)
- — F (S)
- — Z (S)
1910.261 B04
- Issued
- Mar 8, 1991
- Abate by
- Mar 27, 1991
1910.151 C
- Issued
- Mar 8, 1991
- Abate by
- Aug 30, 1992
- Penalty
- Initial $1,000 · Current $1,000
Recent events (2)
- — F (S) $1000.00
- — Z (S) $1000.00
1910.165 D01
- Issued
- Mar 8, 1991
- Abate by
- Mar 18, 1991
- Penalty
- Initial $1,000 · Current $1,000
1910.184 I09 III
- Issued
- Mar 8, 1991
- Abate by
- Mar 13, 1991
- Penalty
- Initial $500 · Current $500
1910.212 A01
- Issued
- Mar 8, 1991
- Abate by
- Aug 30, 1992
- Penalty
- Initial $1,000 · Current $500 Reduced
Recent events (2)
- — F (S) $500.00
- — Z (S) $1000.00
1910.212 A02
- Issued
- Mar 8, 1991
- Abate by
- Apr 11, 1991
- Penalty
- Initial $1,000 · Current $1,000
1910.212 A05
- Issued
- Mar 8, 1991
- Abate by
- Mar 18, 1991
- Penalty
- Initial $600 · Current $600
1910.212 B
- Issued
- Mar 8, 1991
- Abate by
- Mar 22, 1991
- Penalty
- Initial $700 · Current $700
1910.215 B09
- Issued
- Mar 8, 1991
- Abate by
- Mar 18, 1991
- Penalty
- Initial $700 · Current $700
1910.242 B
- Issued
- Mar 8, 1991
- Abate by
- Mar 22, 1991
- Penalty
- Initial $600 · Current $600
1910.253 B02 II
- Issued
- Mar 8, 1991
- Abate by
- Mar 13, 1991
- Penalty
- Initial $700 · Current $700
1910.254 B04 IV
- Issued
- Mar 8, 1991
- Abate by
- Aug 30, 1992
- Penalty
- Initial $700 · Current $700
Recent events (2)
- — F (S) $700.00
- — Z (S) $700.00
1910.261 A03 II
- Issued
- Mar 8, 1991
- Abate by
- Aug 30, 1992
- Penalty
- Initial $700 · Current $700
Recent events (2)
- — F (S) $700.00
- — Z (S) $700.00
1910.261 A03 VI
- Issued
- Mar 8, 1991
- Abate by
- Mar 18, 1991
- Penalty
- Initial $400 · Current $400
1910.261 A03 X
- Issued
- Mar 8, 1991
- Abate by
- Aug 30, 1992
- Penalty
- Initial $1,000 · Current $1,000
Recent events (2)
- — F (S) $1000.00
- — Z (S) $1000.00
1910.261 A03 X
- Issued
- Mar 8, 1991
- Abate by
- Mar 13, 1991
- Penalty
- Initial $800 · Current $800
1910.261 A03 XII
- Issued
- Mar 8, 1991
- Abate by
- Apr 11, 1991
- Penalty
- Initial $400 · Current $400
1910.261 A03 XII
- Issued
- Mar 8, 1991
- Abate by
- Aug 30, 1992
- Penalty
- Initial $400 · Current $400
Recent events (2)
- — F (S) $400.00
- — Z (S) $400.00
1910.261 A03 XII
- Issued
- Mar 8, 1991
- Abate by
- Mar 18, 1991
- Penalty
- Initial $400 · Current $400
1910.261 A03 XII
- Issued
- Mar 8, 1991
- Abate by
- Aug 30, 1992
- Penalty
- Initial $1,000 · Current $1,000
Recent events (2)
- — F (S) $1000.00
- — Z (S) $1000.00
1910.261 A03 XII
- Issued
- Mar 8, 1991
- Abate by
- Mar 18, 1991
- Penalty
- Initial $700 · Current $700
1910.261 A03 XII
- Issued
- Mar 8, 1991
- Abate by
- Mar 13, 1991
- Penalty
- Initial $400 · Current $400
1910.261 A03XVIII
- Issued
- Mar 8, 1991
- Abate by
- Aug 30, 1992
- Penalty
- Initial $800 · Current $800
Recent events (2)
- — F (S) $800.00
- — Z (S) $800.00
1910.261 A03XVIII
- Issued
- Mar 8, 1991
- Abate by
- Aug 30, 1992
- Penalty
- Initial $800 · Current $800
Recent events (2)
- — F (S) $800.00
- — Z (S) $800.00
1910.261 B01
- Issued
- Mar 8, 1991
- Abate by
- May 13, 1991
- Penalty
- Initial $1,000 · Current $1,000
1910.261 B01
- Issued
- Mar 8, 1991
- Abate by
- May 13, 1991
- Penalty
- Initial $1,000 · Current $1,000
1910.261 B01
- Issued
- Mar 8, 1991
- Abate by
- Mar 27, 1991
- Penalty
- Initial $700 · Current $700
1910.261 B01
- Issued
- Mar 8, 1991
- Abate by
- Apr 11, 1991
- Penalty
- Initial $1,000 · Current $1,000
1910.261 B01
- Issued
- Mar 8, 1991
- Abate by
- May 13, 1991
- Penalty
- Initial $1,000 · Current $1,000
1910.261 B01
- Issued
- Mar 8, 1991
- Abate by
- Apr 11, 1991
- Penalty
- Initial $800 · Current $800
1910.261 B01
- Issued
- Mar 8, 1991
- Abate by
- Aug 30, 1992
- Penalty
- Initial $1,000 · Current $1,000
Recent events (2)
- — F (S) $1000.00
- — Z (S) $1000.00
1910.261 B01
- Issued
- Mar 8, 1991
- Abate by
- Aug 30, 1992
- Penalty
- Initial $700 · Current $700
Recent events (3)
- — F (S) $700.00
- — P (S) $700.00
- — Z (S) $700.00
1910.261 B03
- Issued
- Mar 8, 1991
- Abate by
- Mar 18, 1991
- Penalty
- Initial $500 · Current $500
1910.261 B03
- Issued
- Mar 8, 1991
- Abate by
- Mar 27, 1991
- Penalty
- Initial $600 · Current $600
1910.261 B03
- Issued
- Mar 8, 1991
- Abate by
- Aug 30, 1992
- Penalty
- Initial $1,000 · Current $1,000
Recent events (3)
- — F (S) $1000.00
- — P (S) $1000.00
- — Z (S) $1000.00
1910.261 B07
- Issued
- Mar 8, 1991
- Abate by
- Apr 11, 1991
- Penalty
- Initial $1,000 · Current $1,000
1910.261 C07
- Issued
- Mar 8, 1991
- Abate by
- Aug 30, 1992
- Penalty
- Initial $800 · Current $800
Recent events (2)
- — F (S) $800.00
- — Z (S) $800.00
1910.261 C15 III
- Issued
- Mar 8, 1991
- Abate by
- Aug 30, 1992
- Penalty
- Initial $1,000 · Current $1,000
Recent events (2)
- — F (S) $1000.00
- — Z (S) $1000.00
1910.261 G18 II
- Issued
- Mar 8, 1991
- Abate by
- Aug 30, 1992
- Penalty
- Initial $500 · Current $500
Recent events (2)
- — F (S) $500.00
- — Z (S) $500.00
1910.261 K02 I
- Issued
- Mar 8, 1991
- Abate by
- Aug 30, 1992
- Penalty
- Initial $1,000 · Current $1,000
Recent events (3)
- — F (S) $1000.00
- — P (S) $1000.00
- — Z (S) $1000.00
1910.261 K02 V
- Issued
- Mar 8, 1991
- Abate by
- Oct 15, 1991
- Penalty
- Initial $700 · Current $700
Recent events (3)
- — F (S) $700.00
- — P (S) $700.00
- — Z (S) $700.00
1910.261 K11
- Issued
- Mar 8, 1991
- Abate by
- Aug 30, 1992
- Penalty
- Initial $1,000 · Current $1,000
Recent events (3)
- — F (S) $1000.00
- — P (S) $1000.00
- — Z (S) $1000.00
1910.261 K13 I
- Issued
- Mar 8, 1991
- Abate by
- Mar 27, 1991
- Penalty
- Initial $900 · Current $900
1910.261 K18
- Issued
- Mar 8, 1991
- Abate by
- Aug 30, 1992
- Penalty
- Initial $1,000 · Current $500 Reduced
Recent events (2)
- — F (S) $500.00
- — Z (S) $1000.00
1910.261 L06 I
- Issued
- Mar 8, 1991
- Abate by
- Apr 11, 1991
- Penalty
- Initial $600 · Current $600
1910.303 B01
- Issued
- Mar 8, 1991
- Abate by
- Aug 30, 1992
- Penalty
- Initial $1,000 · Current $1,000
Recent events (2)
- — F (S) $1000.00
- — Z (S) $1000.00
1910.303 F
- Issued
- Mar 8, 1991
- Abate by
- Mar 13, 1991
- Penalty
- Initial $300 · Current $300
1910.303 G02 I
- Issued
- Mar 8, 1991
- Abate by
- Mar 18, 1991
- Penalty
- Initial $800 · Current $800
1910.305 B01
- Issued
- Mar 8, 1991
- Abate by
- Mar 18, 1991
- Penalty
- Initial $1,000 · Current $1,000
Recent events (2)
- — F (S) $1000.00
- — Z (S) $1000.00
1910.305 B02
- Issued
- Mar 8, 1991
- Abate by
- May 13, 1991
- Penalty
- Initial $1,000 · Current $1,000
1910.305 G01 III
- Issued
- Mar 8, 1991
- Abate by
- Mar 13, 1991
- Penalty
- Initial $400 · Current $400
1910.305 G02 III
- Issued
- Mar 8, 1991
- Abate by
- Mar 13, 1991
- Penalty
- Initial $500 · Current $500
1910.1200 F05 I
- Issued
- Mar 8, 1991
- Abate by
- Aug 30, 1992
- Penalty
- Initial $700 · Current $700
Recent events (2)
- — F (S) $700.00
- — Z (S) $700.00
1910.1200 F05 II
- Issued
- Mar 8, 1991
- Abate by
- Aug 30, 1992
Recent events (2)
- — F (S)
- — Z (S)
1910.156 B01
- Issued
- Mar 8, 1991
- Abate by
- May 7, 1992
- Penalty
- Initial $9,000 · Current $6,750 Reduced
Recent events (2)
- — F (U) $6750.00
- — Z (W) $9000.00
1910.156 C01
- Issued
- Mar 8, 1991
- Abate by
- May 7, 1992
Recent events (2)
- — F (U)
- — Z (W)
1910.156 E01 I
- Issued
- Mar 8, 1991
- Abate by
- May 7, 1992
- Penalty
- Initial $9,000 · Current $6,750 Reduced
Recent events (2)
- — F (U) $6750.00
- — Z (W) $9000.00
1910.156 F01 II
- Issued
- Mar 8, 1991
- Abate by
- May 7, 1992
Recent events (2)
- — F (U)
- — Z (W)
1910.261 B03
- Issued
- Mar 8, 1991
- Abate by
- Apr 11, 1991
- Penalty
- Initial $2,000 · Current $2,000
Recent events (2)
- — F (R) $2000.00
- — Z (R) $2000.00
1910.24 B
- Issued
- Mar 8, 1991
- Abate by
- Mar 27, 1991
Recent events (2)
- — F (O)
- — Z (O)
1910.24 D
- Issued
- Mar 8, 1991
- Abate by
- Mar 27, 1991
Recent events (2)
- — F (O)
- — Z (O)
1910.106 D02 I
- Issued
- Mar 8, 1991
- Abate by
- Mar 13, 1991
Recent events (2)
- — F (O)
- — Z (O)
1910.157 C04
- Issued
- Mar 8, 1991
- Abate by
- Mar 18, 1991
1910.215 A02
- Issued
- Mar 8, 1991
- Abate by
- Mar 18, 1991
1910.215 A04
- Issued
- Mar 8, 1991
- Abate by
- Mar 18, 1991
1910.261 A03 II
- Issued
- Mar 8, 1991
- Abate by
- Mar 13, 1991
1910.261 A03 II
- Issued
- Mar 8, 1991
- Abate by
- Mar 13, 1991
1910.261 A03 V
- Issued
- Mar 8, 1991
- Abate by
- Mar 13, 1991
1910.261 A03 VI
- Issued
- Mar 8, 1991
- Abate by
- Mar 18, 1991
1910.261 C08 III
- Issued
- Mar 8, 1991
- Abate by
- Mar 27, 1991
1910.261 G11 I
- Issued
- Mar 8, 1991
- Abate by
- Mar 27, 1991
1910.303 G02 III
- Issued
- Mar 8, 1991
- Abate by
- Mar 13, 1991
1910.305 A01 I
- Issued
- Mar 8, 1991
- Abate by
- Mar 13, 1991
More inspections at Stone Container Corporation
View Stone Container Corporation's full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in MT
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 100568815.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.