Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: GENERAL FOAM CORP. DIVISION OF P.M.C.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of GENERAL FOAM CORP. DIVISION OF P.M.C. in 13 MANOR ROAD, EAST RUTHERFORD, NJ 07073 (NAICS 000000). OSHA activity number 101154532.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch General Foam Corp. Division of P.M.C. — free Get an email when a new federal OSHA severe-injury report for General Foam Corp. Division of P.M.C. is published. One employer, no account, unsubscribe in one click.
Site address
13 MANOR ROAD
City
EAST RUTHERFORD
State
NJ
ZIP
07073
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
A
Opened
Closing conference
Case closed
Data loaded
NAICS code
000000
SIC code (legacy)
3086
Employees
200
Ownership type
A
Industry flags
Manufacturing safety.

7 citations on file for this inspection.

5(a)(1)

Serious Gravity 03 1 instance 4 exposed
Issued
Jun 13, 1991
Abate by
Sep 12, 1991
Penalty
Initial $1,375 · Current $1,000 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not furnish employment and a place of employment which
were free from recognized hazards that were causing or likely to cause
death or serious physical harm to employees in that employees were
exposed to the hazards of being struck by flying metal pieces from
rupturing pressure vessels/tanks:
a)  Plant, Compound Area:  The employer altered the binks
pressure vessels by welding shut the plug and gasket.
A piece of metal was welded to the manifold.  These
modifications did not meet the American Society of Mechanical
Engineers (ASME).  Standard ASME certified welder was not
used to make modifications.  Altering the pressure vessel
tanks could cause material stress fatigue in the metal, in
turn would cause an explosion of the tank, on or about March
5, 1991.
Abatement Note:  Among other methods, one feasible and acceptable
method of abatement to correct this hazard is to establish and enforce
those procedures such as; that stipulated by the ASME boiler and
pressure vessel code Section VIII, Div. 2, 1974; Part AF (Fabrication
Requirements) AF 210.5 (Maintenance of Qualification and Production
Records).
Other essential elements for implementation of corrective measure
include:
1)  Before any alterations, a member of management shall be
notified.
2)  Before any alterations on certified tanks are made,
consultation with manufacturer shall be conducted.
3)  Provision for certifying individual welder and employees
should be developed emboding instruction qualification with
Section XI of ASME, Artifical F-2, AF 210.1.
4)  Establishment of records which list a date upon repairs were
made and purpose of repair and modification.
5)  The finished weld-repaired surface shall be prepared and
inspected by either a magnetic particle method in accordance
with Article 9-1 or by a liquid penetrant method in
accordance with Article 9-2.
6)  The area repaired by welding shall be examined by radiography
in accordance with Article I-5.
Recent events (2)
  • — I (S) $1000.00
  • — Z (S) $1375.00

1910.29 A04 II

Serious Gravity 02 1 instance 5 exposed
Issued
Jun 13, 1991
Abate by
Jul 11, 1991
Penalty
Initial $1,100 · Current $750 Reduced
Recent events (2)
  • — I (S) $750.00
  • — Z (S) $1100.00

1910.151 C

Serious Gravity 03 1 instance 4 exposed
Issued
Jun 13, 1991
Abate by
Jun 17, 1991
Penalty
Initial $1,375 · Current $750 Reduced
Recent events (2)
  • — I (S) $750.00
  • — Z (S) $1375.00

1910.219 F03

Other-than-serious Gravity 03 1 instance 2 exposed
Issued
Jun 13, 1991
Abate by
Jun 28, 1991
Penalty
Initial $1,375
Recent events (2)
  • — I (O)
  • — Z (S) $1375.00

1910.255 E

Serious Gravity 02 1 instance 2 exposed
Issued
Jun 13, 1991
Abate by
Jul 11, 1991
Penalty
Initial $1,100 · Current $750 Reduced
Recent events (2)
  • — I (S) $750.00
  • — Z (S) $1100.00

1910.1200 F05 II

Serious Gravity 04 1 instance 4 exposed
Issued
Jun 13, 1991
Abate by
Jun 28, 1991
Penalty
Initial $1,375 · Current $750 Reduced
Recent events (2)
  • — I (S) $750.00
  • — Z (S) $1375.00

1910.1200 H01

Serious Gravity 05 1 instance 6 exposed
Issued
Jun 13, 1991
Abate by
Aug 16, 1991
Penalty
Initial $2,450 · Current $1,500 Reduced
Recent events (2)
  • — I (S) $1500.00
  • — Z (S) $2450.00

View General Foam Corp. Division of P.M.C.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 101154532.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.