DENVER, CO —
OSHA Inspection: SCOTT'S LIQUID GOLD, INC.
Complaint inspection · Health discipline
At a glance
On , OSHA opened a complaint health inspection of SCOTT'S LIQUID GOLD, INC. in 4880 HAVANA ST., DENVER, CO 80239 (NAICS 000000). OSHA activity number 101220168.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- SCOTT'S LIQUID GOLD, INC.
- Site address
- 4880 HAVANA ST.
- City
- DENVER
- State
- CO
- ZIP
- 80239
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 2842
- Employees
- 105
- Ownership type
- A
Citations
6 citations on file for this inspection.
5(a)(1)
- Issued
- Mar 19, 1991
- Abate by
- May 19, 1992
- Penalty
- Initial $420 · Current $100 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to tasks involving identified ergonomic risk factors indluding, but not limited to, repetitive motions, high force and awkward postures resulting in stressors that had caused, were causing, or were likely to cause cumulative trauma disorders: (a) Scotts liquid gold chemical: Machine operators doing hard opening of display cartons, insertion of scent can- isters and holders and closing of cartons. (b) Scotts liquid gold chemical: Machine operators doing bulking on the TOS line. (c) Scotts liquid gold plastics: Machine operators and lead men doing repetitive lifting of buckets of pigments, boxes of plastic products such as and not limited to AQF filters, Dispenser II, Dispenser III and Saturn caps while loading pallets, Gatlords and pigment dispensers. Among other methods, one feasible and accpetable abatement method to correct this hazard is the implementation of an ergonomics management program consisting of the following four elements: 1. Worksite Aanalysis to recognize and identify existing ergonomic risk factors in the workplace. This analysis should include development and use of an ergonomic checklist and employee questionaire. Periodic surveys of the work- place shall be conducted at least annually to evaluate work practices and engineering controls. Employees participation in the ergonomic program should be encouraged through a mechanism such as a safety committee. 2. Medical Management which includes accurate recordkeeping of cumulative trauma disorders. The program should address early recognition, evaluation, and referral of cumulative trauma disorder cases and should include conservative treatment and conservative return to work. Systematic worksite review by the medical team should also be included in the program. 3. Training and Education for exposed employees, including methods to evaluate the effectiveness for the training. Re training should be done annually or as operations change. Training should address hazards associated with the job, the risks of developing cumulative trauma disorders, symp- toms of exposure, and how to prevent the occurrence of cumulative trauma disorders. A supervisors training program should also be implemented to allow recognition of the signs of cumulative trauma disorders and the reinforce the emplo- yer's ergonomics program. 4. Hazard Prevention and Control which includes engineering, work practice, and administrative controls, and personal protective equipment where relevant. (a) Administrative controls are implemented which reduce the duration, frequency, and severity of exposure to erg- onomic stress. These controls may include job rotation, reduction of repetitions, and preventive maintenance of related equipment. Personal protective equipment shall be evaluated to determine relief of ergonomic stress. (b) Work practice controls are implemented which include proper work techniques, new employee conditioning, and monitoring and modifications as necessary to minimize ergonomic stressors. Examples of work practice controls applicable to this workplace include: (i) Continued use of job rotation with research into other possible variations that might be more effective such as individual variations in the rotation for injury susceptible individuals. (ii) Adjust the line speed during the one hour rota- tion periods to allow recovery periods. For example, a slower speed every 12 minutes, with a three minute recovery period. (c) Engineering controls are designed by a qualified ergonomist and may include workstation redesign, tool and handle redesign, and use of mechanical lifts. The goal of this program should be to make the job fit the person. Examples of engineering controls applicable to this work- place include: (i) Glove to relieve the pressure concentrated on the median nerve near the heel of the hand. (ii) Adjustable stands to allow individual adjustment to the height of workstations along the conveyor system. (iii) A confining device to limit the number of cans moved in the bulking operation. (iv) Installation of a mechanical sbs box opener. (v) Install a mechanical means for filling the pigment hopper. (vi) Fill plastic containing boxes on a lift cart which can be raised to the level of the pallet being loaded so lifting involved with be limited to the minimum amount. STEP 1: Implementation of an ergonomics program for worksite analysis, medical management, and training and education, as detailed in items 1-3 above. STEP 2: Submit to the area director a written, detailed plan of abatement outlining a schedule for the implementation of the administrative, work practice, and engineering controls as detailed in items 4(a) - 4(c). All proposed control measures shall be approved for each particular use by a person trained in the evaluation of workplace conditions which cause cumulative trauma disorders. Sixty (60) day progress reports are required during the abatement period consistent with the dates required by this citation. STEP 3: Abatement shall have been completed by implementation of feasible engineering or administrative controls, as described in items 4(a) - 4(c).
Recent events (2)
- — I (S) $100.00
- — Z (S) $420.00
1910.147 C01
- Issued
- Mar 19, 1991
- Abate by
- Apr 30, 1991
- Penalty
- Initial $420 · Current $300 Reduced
Recent events (2)
- — I (S) $300.00
- — Z (S) $420.00
1910.147 C04 I
- Issued
- Mar 19, 1991
- Abate by
- Apr 30, 1991
Recent events (2)
- — I (S)
- — Z (S)
1910.147 C05 I
- Issued
- Mar 19, 1991
- Abate by
- Mar 22, 1991
Recent events (2)
- — I (S)
- — Z (S)
1910.1200 F05 I
- Issued
- Mar 19, 1991
- Abate by
- Apr 2, 1991
Recent events (2)
- — I (O)
- — Z (O)
1910.1200 F05 II
- Issued
- Mar 19, 1991
- Abate by
- Apr 2, 1991
Recent events (2)
- — I (O)
- — Z (O)
More inspections in this industry (NAICS 000000)
More inspections in CO
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 101220168.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.