BOCA RATON, FL ·
OSHA Inspection: WILLARD CONSTRUCTION COMPANY
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of WILLARD CONSTRUCTION COMPANY in BLDG. 5/5/C, 22495 GROUPER COURT, BOCA RATON, FL 33428 (NAICS 000000). OSHA activity number 101259885.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- WILLARD CONSTRUCTION COMPANY
- Site address
- BLDG. 5/5/C, 22495 GROUPER COURT
- City
- BOCA RATON
- State
- FL
- ZIP
- 33428
- Mailing
- 7660 N. SR 7, POMPANO BEACH, FL 33067
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (B)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 1751
- Employees
- 15
- Ownership type
- Private (A)
- Industry flags
- Construction safety.
Citations
6 citations on file for this inspection.
5(a)(1)
- Issued
- Feb 17, 1988
- Abate by
- Feb 20, 1988
- Penalty
- Initial $420 · Current $420
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to: a) The hazard of being struck by falling trusses at building 5/5/C-22495 Grouper Court, Boca Raton, Florida 33428; in that adequate and continuous lateral bracing and proper diagonal bracing was not used to prevent toppling and dominoing of erected trusses. Bracing through chords laterally and cross bracing was not provided to ensure that trusses were secure in a straight and plumb position on or about January 27, 1988. Among other methods one feasible and acceptable abatement method to correct this hazard is to install bracing in accordance with the Truss Plate Institute. BWT-76, Bracing Wood Trusses Commentary and Recommendations.
1926.20 B01
- Issued
- Feb 17, 1988
- Abate by
- Feb 21, 1988
1926.21 B02
- Issued
- Feb 17, 1988
- Abate by
- Feb 23, 1988
1926.100 A
- Issued
- Feb 17, 1988
- Abate by
- Feb 20, 1988
1926.403 B02
- Issued
- Feb 17, 1988
- Abate by
- Feb 20, 1988
1926.404 F06
- Issued
- Feb 17, 1988
- Abate by
- Feb 21, 1988
More inspections at Willard Construction Company
View Willard Construction Company's full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in FL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 101259885.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.