Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: INTERNATIONAL PAPER COMPANY

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of INTERNATIONAL PAPER COMPANY in 6901 GRIERSON STREET, MOSS POINT, MS 39563 (NAICS 000000). OSHA activity number 101390235.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch International Paper Company — free Get an email when a new federal OSHA severe-injury report for International Paper Company is published. One employer, no account, unsubscribe in one click.
Site address
6901 GRIERSON STREET
City
MOSS POINT
State
MS
ZIP
39563
Mailing
P. O. DRAWER P, MOSS POINT, MS 39563
Inspection type
Complaint (B)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
Y
Opened
Closing conference
Case closed
Data loaded
NAICS code
000000
SIC code (legacy)
2621
Employees
1022
Ownership type
A
Industry flags
Manufacturing safety.

92 citations on file for this inspection.

5(a)(1)

Serious Gravity 05 9 instances 15 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $3,500 · Current $2,005 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
%%
employer did not furnish employment and a place of employment which
were free from recognized hazards that were causing or likely to cause
death or serious physical harm to employees in that employees were
exposed to:
(a)  Hazard of cuts from contact with edge(s) of fast moving
sheet(s) of paper while performing routine duties between
components of the following machines:
(i)  #2 Paper Machine
(ii)  #3 Paper Machine
(iii)  O.M.C. Reel Drum
(iv)  Sheet Finishing Building, CRD Lines
Among other methods, one feasible and acceptable abatement method to correc t
this hazard is to erect barrier guards, with interlocks, to stop
machine operations when employee(s) enter danger zone(s).
Recent events (2)
  • — F (S) $2005.00
  • — Z (S) $3500.00

5(a)(1)

Serious Gravity 03 6 instances 16 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $2,500 · Current $1,425 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
%%
employer did not furnish employment and a place of employment which
were free from recognized hazards that were causing or likely to cause
death or serious physical harm to employees in that employees were
exposed to:
(a)  Hazard of Underhung Crane Suspended Load(s) being dropped
at the following locations due to the absence of rated load
markings on:
(i)  Lift Truck Maintenance Shop Crane
(ii)  Sheet Finishing - Three cranes at #4, #5, #7
Cutters
(iii)  Two (2) "Hooterville" Trolleys which operate between
the paper machines and O.M.C.
Among other methods, one feasible and acceptable abatement method
to correct this hazard is to label each side of the crane with the
cranes rated load.
Recent events (2)
  • — F (S) $1425.00
  • — Z (S) $2500.00

5(a)(1)

Serious Gravity 01 2 instances 18 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $1,500 · Current $850 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not furnish employment and a place of employment which
were free from recognized hazards that were causing or likely to cause
death or serious physical harm to employees in that employees were
exposed to being struck by overhead falling objects:
(a)  Digester Building, 3rd floor, outside west wall - Employees were
exposed to the hazard of being struck by loose glass blocks in
transom over northwest corner 3rd floor door.
(b)  #5 Paper Machine, operating floor, southwest corner -
Employees were exposed to being struck by loose bricks in wall
above Winder Power Center door.
Among other methods, one feasible and acceptable method to correct
this hazard is to repair or replace loose bricks/blocks.
Recent events (2)
  • — F (S) $850.00
  • — Z (S) $1500.00

5(a)(1)

Deleted Serious Gravity 10 1 instance 7 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $5,000 · Current $5,000
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not furnish employment and a place of employment which
were free from recognized hazards that were causing or likely to cause
death or serious physical harm to employees in that employees were
exposed to fractures and internal injuries due to potential collapse of
spiral stairway:
(a)  Blow tank Area, Black Liquor Oxidation Tank #0505 -
Employee(s) were exposed to falls of approximately 15-18 feet to
the ground, while climbing spiral stairs which exhibited signs
of excessive corrosion near the top.
Among other methods, one feasible and acceptable abatement method to
correct this hazard is to replace the spiral stairway.
Recent events (2)
  • — F (S) $5000.00
  • — Z (S) $5000.00

5(a)(1)

Deleted Serious Gravity 03 1 instance 8 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $2,500 · Current $2,500
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not furnish employment and a place of employment which
were free from recognized hazards that were causing or likely to cause
death or serious physical harm to employees in that employees were
exposed to being struck by falling core chuck(s):
(a)  #5 Paper Machine, south end of operating floor, at Valmet
KL 1000 Slitter/Winder - Employees were exposed to being struck
by falling core chucks while changing out core chuck stands on
east and west sides of the winder.
Among other methods, one feasible and acceptable abatement method
to correct this hazard is to provide a mechanical bracing or locking
device to ensure that core chucks will not fall in the event of a
malfunction of the hydraulic cylinder(s).
Recent events (2)
  • — F (S) $2500.00
  • — Z (S) $2500.00

5(a)(1)

Serious Gravity 03 8 instances 124 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $2,500 · Current $1,425 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
%%
employer did not furnish employment and a place of employment which
were free from recognized hazards that were causing or likely to cause
death or serious physical harm to employees in that employees were
exposed to hazard of crane suspended load(s) being dropped at the following
locations due to absence of rated load marking(s) on:
(a)  Sheet Finishing Building, #4 Cutter spreader bar
(b)  Sheet Finishing Building, #5 Cutter spreader bar
(c)  Sheet Finishing Building, #7 Cutter spreader bar
(d)  #5 Paper Machine, south end of operating floor, at Winder
Monorail Crane, yellow spreader bar.
(e)  Spreader bar(s) at #2 Paper Machine
(f)  Spreader bar(s) at #3 Paper Machine
(g)  Spreader bar(s) at O.M.C. overhead crane
(h)  Spreader bar at Super Calendar overhead crane
Among other methods, one feasible and acceptable abatement method to
correct this hazard is to label each side of spreader bar(s) with
its rated load capacity.
Recent events (2)
  • — F (S) $1425.00
  • — Z (S) $2500.00

5(a)(1)

Serious Gravity 02 2 instances 8 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $2,000 · Current $1,130 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not furnish employment and a place of employment which
were free from recognized hazards that were causing or likely to cause
death or serious physical harm to employees in that employees were
exposed to burns from hot liquids and contact with breaking sight glass
material due to the absence of protective screens over sight glass ports:
(a)  Digester Building, Capping (3rd) Floor -
(1)  Sight glass ports around Turpentine Separator "A";
(2)  Sight glass ports around Turpentine Separator "C"
Among other methods, one feasible and acceptable abatement method
to correct this hazard is to cover sight glass ports with protective
screen(s) of appropriate material.
Recent events (2)
  • — F (S) $1130.00
  • — Z (S) $2000.00

5(a)(1)

Serious Gravity 10 1 instance 1 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $5,000 · Current $2,850 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not furnish employment and a place of employment which
were free from recognized hazards that were causing or likely to cause
death or serious physical harm to employees in that employees were
exposed to falling from building roof:
(a)  #5 Paper Machine Building roof, western edge, at #6 Clay Silo
- Employee was exposed to falling 10 to 30 feet from western edge
of roof, on or about 7/10/91 at 2:58P.M., while directing mobile
equipment operator as fan blades were being lowered into exhaust
duct.
Among other methods, one feasible and acceptable abatement method to
correct this hazard is to provide and ensure the use of personal fall
protection, i.e., safety belt and lanyard.
Recent events (2)
  • — F (S) $2850.00
  • — Z (S) $5000.00

5(a)(1)

Deleted Serious Gravity 02 7 instances 1 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $2,000 · Current $2,000
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not furnish employment and a place of employment which
were free from recognized hazards that were causing or likely to cause
death or serious physical harm to employees in that employees were
exposed to burns from accidental contact with hot quartz light fixtures:
(a) #5 Paper Machine, wet end of operating floor, east side of
Fourdrinier.
Among other methods, one feasible and acceptable abatement method
to correct this hazard is to guard the fixtures from accidental
contact.
Recent events (2)
  • — F (S) $2000.00
  • — Z (S) $2000.00

5(a)(1)

Serious Gravity 02 1 instance 8 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $2,000 · Current $1,130 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not furnish employment and a place of employment which
were free from recognized hazards that were causing or likely to cause
death or serious physical harm to employees in that employees were
exposed to burns from hot high pressure boiler feed water chemicals:
(a)  Power Plant, 7th floor, under south end #1 Recovery Boiler -
860-900 psi line for boiler feed water chemicals was leaking
within 2-3 feet of where employee(s) cross over #12 I.K.
Among other methods, one feasible and acceptable abatement method
to correct this hazard is to repair the leak, then insulate the
line/pipe.
Recent events (2)
  • — F (S) $1130.00
  • — Z (S) $2000.00

5(a)(1)

Serious Gravity 10 5 instances 8 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $5,000 · Current $2,850 Reduced
The alleged violations below have been  grouped  because  they  involve
%%
similar or related hazards that may increase the potential  for  injury
resulting from an accident.
11a
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not furnish employment and a place of employment which
were free from recognized hazards that were causing or likely to cause
death or serious physical harm to employees in that employees were
exposed to falling approximately 12 to 22 feet from bridge of overhead
crane(s) due to the following:
(a)  #5 P.M., Operating Floor, North Overhead Crane:
(1)  Improper handrail height on footwalk across north side
of bridge
(2)  Absence of a midrail on footwalk across north side
of bridge
(3)  Absence of a toeboard on footwalk across north side
of bridge
(4)  Absence of guarded walkway(s)/platform(s) for
employee(s) who have to travel over top of bridge
during performance of maintenance/inspection duties
(5)  Absence of guarded walkway(s)/platform(s) at east and
west ends of bridge for employee(s) performing bridge
maintenance/inspection duties
(b)  #5 P.M., Operating Floor, south Overhead Crane:
(1)  Improper handrail height on footwalk across south side
of bridge
(2)  Absence of a midrail on footwalk across south side
of bridge
(3)  Absence of a toeboard on footwalk across south side
of bridge
(4)  Absence of guarded walkway(s)/platform(s) for
employee(s) who have to travel over top of bridge
during performance of maintenance/inspection duties
(5)  Absence of guarded walkway(s)/platform(s) at east and
west ends of bridge for employee(s) performing bridge
maintenance/inspection duties.
ABATEMENT NOTE:  Among other methods, one feasible and acceptable
abatement method to correct this hazard is to install standard
guardrails and toeboards.
11b
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:
The employer did not furnish employment and a place of employment
which were free from recognized hazards that were causing or likely
to cause death or serious physical harm to employees in that employees
were exposed to falling approximately 21-1/2 to 37-1/2 feet from the
bridge of overhead crane(s) due to the following:
(a)  Reel Storage Crane
(1)  63 x 25-1/2 inch opening at west end of crane's bridge
(2)  63 x 26 inch opening at east end of crane's bridge
(3)  33 x 27-1/2 inch opening at northwest corner of crane's
bridge
(4)  24 x 63 inch platform for Main Hoist Sheave near east
end of bridge
(5)  Absence of midrail and toeboards on platform used for
access to brake on hoist lift motor on south side of
bridge
ABATEMENT NOTE:  Among other methods, one feasible and acceptable
abatement method to correct this hazard is to install standard
guardrails and toeboards.
11c
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:
The employer did not furnish employment and a place of employment
which were free from recognized hazards that were causing or likely
to cause death or serious physical harm to employees in that employees
were exposed to falling approximately 18-1/2 feet while trying to
access walkway(s) of overhead bridge crane(s) at location(s) other
than the special platform above northeast corner of Wire Room in
#5 Paper Machine building:
(a)  #5 P.M., Above Operating Floor - Employee was observed
climbing onto south girder of North Bridge Crane, and then over
girders, to get onto north footwalk without any fall protection
on or about 6/11/91 at 1:50 p.m.
ABATEMENT NOTE:  Among other methods, one feasible and acceptable
abatement method to correct this hazard is to provide, and ensure
the use of, a vehicle-mounted elevating aerial device which can be
used to access bridge(s) in a safe manner requiring no step over any
gap exceeding 12 inches, and require the use of personal fall
protection.
11d
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:
The employer did not furnish employment and a place of employment
which were free from recognized hazards that were causing or likely
to cause death or serious physical harm to employees in that employees
were exposed to falling approximately 21 feet 8 inches from top of
fixed ladder used for access to Reel Storage Crane due to the 42-inch
step across distance:
(a)  Reel Storage Crane Access Ladder
ABATEMENT NOTE:  Among other methods, one feasbile and acceptable
abatement method to correct this hazard is to extend ladder's
height and extend bridge footwalk to eliminate any gap exceeding
12 inches.
Recent events (2)
  • — F (S) $2850.00
  • — Z (S) $5000.00

5(a)(1)

Serious Gravity 10 2 instances 8 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $5,000 · Current $2,850 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
%%
employer did not furnish employment and a place of employment which
were free from recognized hazards that were causing or likely to cause
death or serious physical harm to employees in that employees were
exposed to unguarded moving parts of overhead bridge crane(s), in
that rotating bridge drive shaft(s) and bridge-truck wheel gears were
not guarded:
(a)  North #5 P.M. Bridge Crane
(b)  South #5 P.M. Bridge Crane
ABATEMENT NOTE:  Among other methods, one feasible and acceptable
abatement method to correct this hazard is to enclose gears and
drive shafts in approved enclosures.
Recent events (2)
  • — F (S) $2850.00
  • — Z (S) $5000.00

5(a)(1)

Serious Gravity 10 4 instances 10 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $5,000 · Current $2,850 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
%%
employer did not furnish employment and a place of employment which
were free from recognized hazards that were causing or likely to cause
death or serious physical harm to employees in that employees were
exposed to the possibility of overhead bridge crane(s) being
overloaded and dropping load(s) due to absence of rated load marking
on each side of the crane:
(a)  Paper Machine #2 (one side of bridge was labeled "5 Ton"
and the other side "15 Ton")
(b)  Paper Machine #3
(c)  Super Calendar
ABATEMENT NOTE:  Among other methods, one feasible and acceptable
abatement method to correct this hazard is to plainly mark crane's
rated load on each side of bridge.
Recent events (2)
  • — F (S) $2850.00
  • — Z (S) $5000.00

1910.22 B01

Serious Gravity 01 1 instance 2 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $1,500 · Current $850 Reduced
Recent events (2)
  • — F (S) $850.00
  • — Z (S) $1500.00

1910.24 H

Serious Gravity 03 2 instances 5 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $2,500 · Current $1,425 Reduced
Recent events (2)
  • — F (S) $1425.00
  • — Z (S) $2500.00

1910.28 A01

Serious Gravity 10 6 instances 11 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $5,000 · Current $2,850 Reduced
Recent events (2)
  • — F (S) $2850.00
  • — Z (S) $5000.00

1910.106 D02 I

Serious Gravity 01 2 instances 2 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $1,500 · Current $850 Reduced
Recent events (2)
  • — F (S) $850.00
  • — Z (S) $1500.00

1910.144 A01 III

Serious Gravity 10 28 instances 20 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $5,000 · Current $2,850 Reduced
Recent events (2)
  • — F (S) $2850.00
  • — Z (S) $5000.00

1910.178 A04

Serious Gravity 02 1 instance 6 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $2,000 · Current $1,130 Reduced
Recent events (2)
  • — F (S) $1130.00
  • — Z (S) $2000.00

1910.212 A01

Serious Gravity 01 1 instance 16 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $1,500 · Current $850 Reduced
Recent events (2)
  • — F (S) $850.00
  • — Z (S) $1500.00

1910.212 A03 II

Serious Gravity 03 1 instance 6 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $2,500 · Current $1,425 Reduced
Recent events (2)
  • — F (S) $1425.00
  • — Z (S) $2500.00

1910.253 B02 IV

Serious Gravity 02 2 instances 3 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $2,000 · Current $1,130 Reduced
Recent events (2)
  • — F (S) $1130.00
  • — Z (S) $2000.00

1910.254 C01

Serious Gravity 01 1 instance 12 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $1,500 · Current $850 Reduced
Recent events (2)
  • — F (S) $850.00
  • — Z (S) $1500.00

1910.254 D09 III

Serious Gravity 02 3 instances 23 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $2,000 · Current $1,130 Reduced
Recent events (2)
  • — F (S) $1130.00
  • — Z (S) $2000.00

1910.261 A03 VI

Serious Gravity 03 1 instance 2 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $2,500 · Current $1,425 Reduced
Recent events (2)
  • — F (S) $1425.00
  • — Z (S) $2500.00

1910.261 A03 VI

Serious Gravity 03 1 instance 1 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $2,500 · Current $1,425 Reduced
Recent events (2)
  • — F (S) $1425.00
  • — Z (S) $2500.00

1910.261 A03 VI

Serious Gravity 03 2 instances 20 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $2,500 · Current $1,425 Reduced
Recent events (2)
  • — F (S) $1425.00
  • — Z (S) $2500.00

1910.261 A03 VI

Serious Gravity 03 1 instance 18 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $2,500 · Current $1,425 Reduced
Recent events (2)
  • — F (S) $1425.00
  • — Z (S) $2500.00

1910.261 A03 VI

Serious Gravity 01 1 instance 12 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $1,500 · Current $850 Reduced
Recent events (2)
  • — F (S) $850.00
  • — Z (S) $1500.00

1910.261 A03 XVII

Serious Gravity 01 1 instance 25 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $1,500 · Current $850 Reduced
Recent events (2)
  • — F (S) $850.00
  • — Z (S) $1500.00

1910.261 A03 XVII

Serious Gravity 01 1 instance 3 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $1,500 · Current $850 Reduced
Recent events (2)
  • — F (S) $850.00
  • — Z (S) $1500.00

1910.261 A03 XVII

Serious 1 instance 25 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Recent events (2)
  • — F (S)
  • — Z (S)

1910.261 B01

Serious Gravity 02 4 instances 4 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $2,000 · Current $1,130 Reduced
Recent events (2)
  • — F (S) $1130.00
  • — Z (S) $2000.00

1910.261 B03

Serious Gravity 03 2 instances 17 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $2,500 · Current $1,425 Reduced
Recent events (2)
  • — F (S) $1425.00
  • — Z (S) $2500.00

1910.261 B03

Serious Gravity 02 1 instance 4 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $2,000 · Current $1,130 Reduced
Recent events (2)
  • — F (S) $1130.00
  • — Z (S) $2000.00

1910.261 K01

Deleted Serious Gravity 10 3 instances 14 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $5,000 · Current $5,000
Recent events (2)
  • — F (S) $5000.00
  • — Z (S) $5000.00

1910.261 K02 I

Serious Gravity 10 54 instances 9 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $5,000 · Current $2,850 Reduced
Recent events (2)
  • — F (S) $2850.00
  • — Z (S) $5000.00

1910.261 K02 VI

Deleted Serious Gravity 10 12 instances 6 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $5,000 · Current $5,000
Recent events (2)
  • — F (S) $5000.00
  • — Z (S) $5000.00

1910.261 K24 III

Serious Gravity 10 3 instances 14 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $5,000 · Current $2,850 Reduced
Recent events (2)
  • — F (S) $2850.00
  • — Z (S) $5000.00

1910.304 A03

Serious Gravity 03 1 instance 6 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $2,500 · Current $1,425 Reduced
Recent events (2)
  • — F (S) $1425.00
  • — Z (S) $2500.00

1910.305 A02 IIIG

Serious Gravity 02 1 instance 3 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $2,000 · Current $1,130 Reduced
Recent events (2)
  • — F (S) $1130.00
  • — Z (S) $2000.00

1910.306 D01

Serious Gravity 03 5 instances 18 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $2,500 · Current $1,425 Reduced
Recent events (2)
  • — F (S) $1425.00
  • — Z (S) $2500.00

5(a)(1)

Repeat Gravity 02 17 instances 23 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $10,000 · Current $5,040 Reduced
This is a Repeat of Citation 1, Item 4, Inspection No. 18065839
issued 7/27/88
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not furnish employment and a place of employment which
were free from recognized hazards that were causing or likely to cause
death or serious physical harm to employees in that employees were
exposed to burns from contact with steam, steam and condensate pipes,
and/or hot water:
(a)  Power Plant, 6th Floor, #3 Recovery Boiler - At #14 I.K.,
steam and hot water were leaking around packing which had
deteriorated.
(b)  Power Plant, 6th Floor, #3 Recovery Boiler - At #16 I.K.,
steam and hot water were leaking around packing which had
deteriorated.
(c)  Power Plant, 6th Floor, #1 R.B. - Insulation was missing
from hot piping at south ends of #10 I.K., #2 I.K., #4 I.K.,
at Popit Valve(s).
(d)  Power Plant, 6th Floor, #2 R.B. - Insulation was missing
from hot piping at south end(s) of #2 I.K., #4 I.K., #10 I.K.,
#12 I.K., at Popit Valve(s).
(e)  Power Plant, 6th Floor, #2 R.B. - Insulation was missing
from hot piping at north end(s) of #1 I.K., #3 I.K., #9 I.K.,
#11 I.K., at Popit Valve(s).
(f)  Power Plant, 5th Floor, #2 R.B. - Insulation was missing
from hot piping on north end of #19 I.K. at Popit Valve.
(g)  Power Plant, 5th Floor, #1 R.b. - Insulation was missing
from hot piping on north end of #15 I.K. at Popit Valve.
(h)  Power Plant, Southeast Corner of Roof over #1 and #2 R.B. -
Insulation was missing from approximately 24 inches of flanges
and valve(s) and 26 inches of 1-3/4 inch diameter piping at the
Old Steam Whistle(s).
(i)  Digester Building, Bottom Floor - Employee(s) were exposed
to contact with hot uninsulated piping at the 10-inch christmas
tree at bottom of the eleven digesters.
ABATEMENT NOTE:  Among other methods, one feasible and acceptable
abatement method to correct this hazard is to repair leaks and
insulate the pipes/fittings, or close openings.
Recent events (2)
  • — F (R) $5040.00
  • — Z (R) $10000.00

1910.22 C

Repeat Gravity 03 15 instances 56 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $25,000 · Current $12,600 Reduced
Recent events (2)
  • — F (R) $12600.00
  • — Z (R) $25000.00

1910.22 C

Repeat Gravity 03 1 instance 16 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Recent events (2)
  • — F (R)
  • — Z (R)

1910.22 C

Repeat Gravity 03 1 instance 12 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Recent events (2)
  • — F (R)
  • — Z (R)

1910.22 C

Repeat Gravity 03 1 instance 8 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Recent events (2)
  • — F (R)
  • — Z (R)

1910.22 D01

Repeat Gravity 02 6 instances 32 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $10,000 · Current $5,040 Reduced
Recent events (2)
  • — F (R) $5040.00
  • — Z (R) $10000.00

1910.23 C01

Repeat Gravity 03 2 instances 2 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $12,500 · Current $6,300 Reduced
Recent events (2)
  • — F (R) $6300.00
  • — Z (R) $12500.00

1910.24 B

Repeat Gravity 02 2 instances 27 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $10,000 · Current $5,040 Reduced
Recent events (2)
  • — F (R) $5040.00
  • — Z (R) $10000.00

1910.147 D03

Deleted Repeat Gravity 03 4 instances 12 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $12,500 · Current $12,500
Recent events (2)
  • — F (R) $12500.00
  • — Z (R) $12500.00

1910.151 C

Repeat Gravity 10 6 instances 29 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $25,000 · Current $12,600 Reduced
Recent events (2)
  • — F (R) $12600.00
  • — Z (R) $25000.00

1910.184 I09 III

Repeat Gravity 02 1 instance 3 exposed
Issued
Oct 28, 1991
Abate by
Oct 30, 1991
Penalty
Initial $10,000 · Current $5,040 Reduced
Recent events (2)
  • — F (R) $5040.00
  • — Z (R) $10000.00

1910.212 A01

Repeat Gravity 10 37 instances 28 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $25,000 · Current $12,600 Reduced
Recent events (2)
  • — F (R) $12600.00
  • — Z (R) $25000.00

1910.212 A01

Repeat Gravity 10 255 instances 90 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $25,000 · Current $12,600 Reduced
Recent events (2)
  • — F (R) $12600.00
  • — Z (R) $25000.00

1910.212 A05

Repeat Gravity 02 4 instances 28 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $10,000 · Current $5,040 Reduced
Recent events (2)
  • — F (R) $5040.00
  • — Z (R) $10000.00

1910.242 B

Repeat Gravity 02 7 instances 6 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $10,000 · Current $5,040 Reduced
Recent events (2)
  • — F (R) $5040.00
  • — Z (R) $10000.00

1910.261 A03 VI

Repeat Gravity 03 2 instances 22 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $12,500 · Current $6,300 Reduced
Recent events (2)
  • — F (R) $6300.00
  • — Z (R) $12500.00

1910.261 A03 VI

Repeat Gravity 03 1 instance 18 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $12,500 · Current $6,300 Reduced
Recent events (2)
  • — F (R) $6300.00
  • — Z (R) $12500.00

1910.261 A03 VI

Repeat Gravity 10 7 instances 34 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $25,000 · Current $12,600 Reduced
Recent events (2)
  • — F (R) $12600.00
  • — Z (R) $25000.00

1910.261 A03 XII

Repeat Gravity 10 2 instances 4 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $17,500 · Current $8,825 Reduced
Recent events (2)
  • — F (R) $8825.00
  • — Z (R) $17500.00

1910.261 A03 XXIV

Repeat Gravity 01 9 instances 35 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $200 · Current $100 Reduced
Recent events (2)
  • — F (R) $100.00
  • — Z (R) $200.00

1910.261 A03 XXVI

Repeat Gravity 01 16 instances 51 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $12,500 · Current $6,300 Reduced
Recent events (2)
  • — F (R) $6300.00
  • — Z (R) $12500.00

1910.261 B01

Repeat Gravity 10 40 instances 69 exposed
Issued
Oct 28, 1991
Abate by
Sep 21, 1994
Penalty
Initial $25,000 · Current $12,600 Reduced
Recent events (2)
  • — F (R) $12600.00
  • — Z (R) $25000.00

1910.261 B01

Deleted Repeat Gravity 03 1 instance 2 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $12,500 · Current $12,500
Recent events (2)
  • — F (R) $12500.00
  • — Z (R) $12500.00

1910.261 B01

Repeat Gravity 03 10 instances 19 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $25,000 · Current $12,600 Reduced
Recent events (2)
  • — F (R) $12600.00
  • — Z (R) $25000.00

1910.261 B01

Repeat Gravity 10 27 instances 52 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $25,000 · Current $12,600 Reduced
Recent events (2)
  • — F (R) $12600.00
  • — Z (R) $25000.00

1910.261 B01

Repeat Gravity 10 49 instances 41 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $50,000 · Current $25,200 Reduced
Recent events (2)
  • — F (R) $25200.00
  • — Z (R) $50000.00

1910.261 B03

Repeat Gravity 03 5 instances 12 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $17,500 · Current $8,825 Reduced
Recent events (2)
  • — F (R) $8825.00
  • — Z (R) $17500.00

1910.261 B03

Repeat Gravity 05 19 instances 42 exposed
Issued
Oct 28, 1991
Abate by
Oct 31, 1991
Penalty
Initial $25,000 · Current $12,600 Reduced
Recent events (2)
  • — F (R) $12600.00
  • — Z (R) $25000.00

1910.261 B03

Repeat Gravity 03 2 instances 12 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $50,000 · Current $25,200 Reduced
Recent events (2)
  • — F (R) $25200.00
  • — Z (R) $50000.00

1910.261 B03

Repeat Gravity 10 34 instances 137 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Recent events (2)
  • — F (R)
  • — Z (R)

1910.261 B03

Repeat Gravity 10 9 instances 13 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $25,000 · Current $12,600 Reduced
Recent events (2)
  • — F (R) $12600.00
  • — Z (R) $25000.00

1910.261 B03

Repeat Gravity 03 3 instances 11 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $200 · Current $100 Reduced
Recent events (2)
  • — F (R) $100.00
  • — Z (R) $200.00

1910.261 C08 VI

Repeat Gravity 01 1 instance 10 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $12,500 · Current $6,300 Reduced
Recent events (2)
  • — F (R) $6300.00
  • — Z (R) $12500.00

1910.261 E12 II

Repeat Gravity 03 24 instances 13 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $20,000 · Current $10,000 Reduced
Recent events (2)
  • — F (R) $10000.00
  • — Z (R) $20000.00

1910.303 F

Repeat Gravity 02 6 instances 38 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $25,000 · Current $12,600 Reduced
Recent events (2)
  • — F (R) $12600.00
  • — Z (R) $25000.00

1910.303 G02 IB

Repeat Gravity 10 39 instances 96 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $10,000 · Current $5,040 Reduced
Recent events (2)
  • — F (R) $5040.00
  • — Z (R) $10000.00

1910.303 G02 II

Repeat Gravity 02 5 instances 12 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $200 · Current $100 Reduced
Recent events (2)
  • — F (R) $100.00
  • — Z (R) $200.00

1910.304 E01 IV

Repeat Gravity 01 8 instances 28 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $200 · Current $100 Reduced
Recent events (2)
  • — F (R) $100.00
  • — Z (R) $200.00

1910.304 F04

Repeat Gravity 01 6 instances 22 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $12,500 · Current $6,300 Reduced
Recent events (2)
  • — F (R) $6300.00
  • — Z (R) $12500.00

1910.304 F05 VC

Repeat Gravity 03 3 instances 10 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $25,000 · Current $12,600 Reduced
Recent events (2)
  • — F (R) $12600.00
  • — Z (R) $25000.00

1910.305 B01

Repeat Gravity 10 15 instances 100 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $200 · Current $100 Reduced
Recent events (2)
  • — F (R) $100.00
  • — Z (R) $200.00

1910.305 E01

Deleted Repeat Gravity 01 1 instance 2 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $12,500 · Current $12,500
Recent events (2)
  • — F (R) $12500.00
  • — Z (R) $12500.00

1910.305 G01 III

Repeat Gravity 03 1 instance 16 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $25,000 · Current $12,600 Reduced
Recent events (2)
  • — F (R) $12600.00
  • — Z (R) $25000.00

1910.305 G02 III

Repeat Gravity 03 14 instances 44 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Penalty
Initial $500 · Current $250 Reduced
Recent events (2)
  • — F (R) $250.00
  • — Z (R) $500.00

1910.253 B04 III

Other-than-serious Gravity 03 7 instances 15 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Recent events (2)
  • — F (O)
  • — Z (O)

1910.254 D08

Other-than-serious Gravity 01 5 instances 20 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Recent events (2)
  • — F (O)
  • — Z (O)

1910.261 A03 IV

Other-than-serious Gravity 01 1 instance 2 exposed
Issued
Oct 28, 1991
Abate by
Oct 31, 1991
Recent events (2)
  • — F (O)
  • — Z (O)

1910.261 A03 XV

Other-than-serious Gravity 01 1 instance 1 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Recent events (2)
  • — F (O)
  • — Z (O)

1910.261 K02 III

Other-than-serious Gravity 01 2 instances 6 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Recent events (2)
  • — F (O)
  • — Z (O)

1910.304 F05 I

Other-than-serious Gravity 01 1 instance 4 exposed
Issued
Oct 28, 1991
Abate by
Dec 3, 1991
Recent events (2)
  • — F (O)
  • — Z (O)

View International Paper Company's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 101390235.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.