Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,193,745Inspections Most recent open 2026-08-06 Last loaded 2026-08-10

OSHA Inspection: WEDGCOR

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of WEDGCOR in 700 13TH AVENUE SE, JAMESTOWN, ND 58401 (NAICS 000000). OSHA activity number 101460418.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Wedgcor for free Get an email when a new federal OSHA severe-injury report for Wedgcor is published. One employer, no account, unsubscribe in one click.
Establishment
WEDGCOR
Site address
700 13TH AVENUE SE
City
JAMESTOWN
State
ND
ZIP
58401
Mailing
P.O. BOX 110, JAMESTOWN, ND 58402
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
000000
SIC code (legacy)
3448
Employees
134
Ownership type
A
Industry flags
Manufacturing safety.

37 citations on file for this inspection.

5(a)(1)

Serious 1 instance 15 exposed
Issued
Feb 1, 1988
Abate by
Feb 8, 1988
Penalty
Initial $420 · Current $252 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The
%%
employer did not furnish employment and a place of employment which were
free from recognized hazards that were causing or likely to cause death
or serious physical harm to employees in that employees were exposed to:
a) The hezard of having parts of their bodies crushed or amputated in
the event that machines should be re-started during maintenance and
set-up operations. In the Modified "U" Plant and Strait Wall
Building, maintenance and tooling personnel are required to work on
punch presses, shears, press brakes, roll formers, bending machines,
forming machines, overhead cranes and other equipment were not aware
of any lock-out procedures or the availability of any locks with
which to effectively lock-out machines and equipment.
One feasible and useful method of abatement, among other methods, would
be to provide the protection of a positive main power lock-out procedure
which would include the following essentials:
1) Open and lock-out main power disconnect for the machine and bleed off
any residual energy prior to performing cleaning.
2) Provide each potentially exposed employees working in the area with
separate lock and key to be placed on the lock-out means.
3) Establish a written lock out policy, including procedures to be
followed and training for all affected employees.
4) Install automatic braking devices which will stop all movement of
machinery immediately upon interruption of power to the machine.
5) Install interlock devices which will prevent any access doors from
being opened the machine has come to a complete stop.
6) Periodically evaluate the program and strictly enforce all of its
provisions.
Recent events (2)
  • · I (S) $252.00
  • · Z (S) $420.00

1910.107 J01

Serious 1 instance 4 exposed
Issued
Feb 1, 1988
Abate by
Feb 18, 1988
Penalty
Initial $240 · Current $144 Reduced
Recent events (2)
  • · I (S) $144.00
  • · Z (S) $240.00

1910.178 M03

Serious 1 instance 1 exposed
Issued
Feb 1, 1988
Abate by
Feb 5, 1988
Penalty
Initial $180 · Current $108 Reduced
Recent events (2)
  • · I (S) $108.00
  • · Z (S) $180.00

1910.212 A01

Serious 1 instance 4 exposed
Issued
Feb 1, 1988
Abate by
Jul 15, 1988
Penalty
Initial $420 · Current $252 Reduced
Recent events (3)
  • · P (S) $252.00
  • · I (S) $252.00
  • · Z (S) $420.00

1910.212 A03 II

Serious 10 instances 20 exposed
Issued
Feb 1, 1988
Abate by
Jul 15, 1988
Recent events (2)
  • · P (S)
  • · Z (S)

1910.212 B

Serious 1 instance 4 exposed
Issued
Feb 1, 1988
Abate by
Apr 4, 1988

1910.217 C01 I

Serious 2 instances 6 exposed
Issued
Feb 1, 1988
Abate by
Jul 15, 1988
Recent events (2)
  • · P (S)
  • · Z (S)

1910.217 C02 IA

Serious 1 instance 4 exposed
Issued
Feb 1, 1988
Abate by
Jul 15, 1988
Recent events (2)
  • · P (S)
  • · Z (S)

1910.219 C02 I

Serious 1 instance 4 exposed
Issued
Feb 1, 1988
Abate by
May 3, 1988

1910.219 C03

Serious 1 instance 4 exposed
Issued
Feb 1, 1988
Abate by
Apr 4, 1988

1910.219 D01

Serious 1 instance 4 exposed
Issued
Feb 1, 1988
Abate by
Jul 15, 1988
Recent events (2)
  • · P (S)
  • · Z (S)

1910.219 E03 I

Serious 1 instance 4 exposed
Issued
Feb 1, 1988
Abate by
Jul 15, 1988
Recent events (2)
  • · P (S)
  • · Z (S)

1910.219 F01

Serious 1 instance 4 exposed
Issued
Feb 1, 1988
Abate by
Jul 15, 1988
Recent events (2)
  • · P (S)
  • · Z (S)

1910.219 F03

Serious 3 instances 10 exposed
Issued
Feb 1, 1988
Abate by
May 3, 1988

1904.2 A

Other-than-serious 1 instance 134 exposed
Issued
Feb 1, 1988
Abate by
Feb 5, 1988

1910.22 A01

Other-than-serious 1 instance 4 exposed
Issued
Feb 1, 1988
Abate by
Feb 4, 1988

1910.23 C01

Other-than-serious 2 instances 2 exposed
Issued
Feb 1, 1988
Abate by
Feb 18, 1988

1910.157 C04

Other-than-serious 3 instances 7 exposed
Issued
Feb 1, 1988
Abate by
Mar 3, 1988

1910.176 B

Other-than-serious 1 instance 2 exposed
Issued
Feb 1, 1988
Abate by
Feb 4, 1988

1910.178 A02

Other-than-serious 1 instance 2 exposed
Issued
Feb 1, 1988
Abate by
Mar 3, 1988

1910.178 A06

Other-than-serious 3 instances 7 exposed
Issued
Feb 1, 1988
Abate by
Mar 3, 1988

1910.178 M12 I

Other-than-serious 1 instance 2 exposed
Issued
Feb 1, 1988
Abate by
Feb 8, 1988

1910.178 E01 I

Other-than-serious 1 instance 4 exposed
Issued
Feb 1, 1988
Abate by
Feb 16, 1988

1910.179 G01 V

Other-than-serious 1 instance 4 exposed
Issued
Feb 1, 1988
Abate by
Feb 16, 1988

1910.184 E09 I

Other-than-serious 1 instance 5 exposed
Issued
Feb 1, 1988
Abate by
Feb 5, 1988

1910.184 G09 I

Other-than-serious 1 instance 4 exposed
Issued
Feb 1, 1988
Abate by
Feb 5, 1988

1910.184 I09 IV

Other-than-serious 1 instance 5 exposed
Issued
Feb 1, 1988
Abate by
Feb 5, 1988

1910.215 B09

Other-than-serious 2 instances 3 exposed
Issued
Feb 1, 1988
Abate by
Feb 18, 1988

1910.215 D01

Other-than-serious 2 instances 3 exposed
Issued
Feb 1, 1988
Abate by
Feb 18, 1988

1910.242 A

Other-than-serious 3 instances 1 exposed
Issued
Feb 1, 1988
Abate by
Feb 8, 1988

1910.252 A02 IIB

Other-than-serious 1 instance 4 exposed
Issued
Feb 1, 1988
Abate by
Feb 8, 1988

1910.252 A02 VB

Other-than-serious 1 instance 2 exposed
Issued
Feb 1, 1988
Abate by
Feb 4, 1988

1910.252 B02 IVD

Other-than-serious 1 instance 2 exposed
Issued
Feb 1, 1988
Abate by
Feb 8, 1988

1910.303 B02

Other-than-serious 1 instance 10 exposed
Issued
Feb 1, 1988
Abate by
Feb 18, 1988

1910.303 E

Other-than-serious 1 instance 4 exposed
Issued
Feb 1, 1988
Abate by
Feb 18, 1988

1910.305 B01

Other-than-serious 2 instances 3 exposed
Issued
Feb 1, 1988
Abate by
Feb 18, 1988

1910.305 G02 III

Other-than-serious 1 instance 6 exposed
Issued
Feb 1, 1988
Abate by
Feb 18, 1988

View Wedgcor's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 101460418.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.