COOPER CITY, FL ·
OSHA Inspection: NALES BUILDING CORPORATION
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of NALES BUILDING CORPORATION in 2555 SAND WAY, COOPER CITY, FL 33026 (NAICS 000000). OSHA activity number 101715902.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- NALES BUILDING CORPORATION
- Site address
- 2555 SAND WAY
- City
- COOPER CITY
- State
- FL
- ZIP
- 33026
- Mailing
- 5325 SW 119TH AVE., COOPER CITY, FL 33330
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (B)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 1521
- Employees
- 5
- Ownership type
- Private (A)
- Industry flags
- Construction safety.
Citations
1 citation on file for this inspection.
5(a)(1)
- Issued
- Mar 21, 1986
- Abate by
- Mar 25, 1986
- Penalty
- Initial $640 · Current $640
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to: a) On or about January 24, 1986, employees were exposed to the hazard of being struck by falling trusses at a building located at 2555 Sand Way, Cooper City, Florida 33026; in that adequate and continuous lateral bracing and proper diagonal bracing erection. Bracing through chords laterally and cross bracing was not provided to ensure that trusses were secure in a straight and plumb position. Among other methods one feasible and acceptable abatement method to correct this hazard would be to ensure that the truss manufacturers blue print notes the Truss Plate Institute, BWT-76, Bracing Wood Trusses Commentary and Recommendations are carried out according to procedures as the job progresses. Insure that the T.P.I., Commentary and Recommendations for truss erection is in possession of the site foreman or manager.
More inspections in this industry (NAICS 000000)
More inspections in FL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 101715902.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.