COLUMBUS, OH —
OSHA Inspection: ACCURATE SIGNS, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of ACCURATE SIGNS, INC. in 1511 ALUM CREEK DRIVE, COLUMBUS, OH 43209 (NAICS 000000). OSHA activity number 101723120.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- ACCURATE SIGNS, INC.
- Site address
- 1511 ALUM CREEK DRIVE
- City
- COLUMBUS
- State
- OH
- ZIP
- 43209
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- A
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 3993
- Employees
- 53
- Ownership type
- A
- Industry flags
- Manufacturing safety.
Citations
29 citations on file for this inspection.
1910.106 E06 II
- Issued
- Aug 18, 1986
- Abate by
- Sep 18, 1986
- Penalty
- Initial $240 · Current $125 Reduced
Recent events (2)
- — I (S) $125.00
- — Z (S) $240.00
1910.106 D04 I
- Issued
- Aug 18, 1986
- Abate by
- Sep 18, 1986
1910.106 D04 I
- Issued
- Aug 18, 1986
- Abate by
- Sep 18, 1986
1910.132 A
- Issued
- Aug 18, 1986
- Abate by
- Sep 18, 1986
- Penalty
- Initial $320 · Current $165 Reduced
Recent events (2)
- — I (S) $165.00
- — Z (S) $320.00
1910.133 A01
- Issued
- Aug 18, 1986
- Abate by
- Aug 27, 1986
- Penalty
- Initial $240 · Current $240
Recent events (2)
- — I (S) $240.00
- — Z (S) $240.00
1910.212 A01
- Issued
- Aug 18, 1986
- Abate by
- Sep 18, 1986
- Penalty
- Initial $320 · Current $165 Reduced
Recent events (2)
- — I (S) $165.00
- — Z (S) $320.00
1910.213 C01
- Issued
- Aug 18, 1986
- Abate by
- Sep 18, 1986
- Penalty
- Initial $320 · Current $165 Reduced
Recent events (2)
- — I (S) $165.00
- — Z (S) $320.00
1910.213 C02
- Issued
- Aug 18, 1986
- Abate by
- Sep 18, 1986
1910.213 C03
- Issued
- Aug 18, 1986
- Abate by
- Sep 18, 1986
1910.213 H01
- Issued
- Aug 18, 1986
- Abate by
- Oct 3, 1986
- Penalty
- Initial $400 · Current $205 Reduced
Recent events (2)
- — I (S) $205.00
- — Z (S) $400.00
1910.213 H04
- Issued
- Aug 18, 1986
- Abate by
- Oct 3, 1986
Recent events (2)
- — I (S)
- — Z (S)
1910.213 H05
- Issued
- Aug 18, 1986
- Abate by
- Oct 3, 1986
Recent events (2)
- — I (S)
- — Z (S)
1910.219 E03 I
- Issued
- Aug 18, 1986
- Abate by
- Sep 18, 1986
- Penalty
- Initial $240 · Current $125 Reduced
Recent events (2)
- — I (S) $125.00
- — Z (S) $240.00
1910.252 E03 I
- Issued
- Aug 18, 1986
- Abate by
- Sep 18, 1986
- Penalty
- Initial $240 · Current $240
Recent events (2)
- — I (S) $240.00
- — Z (S) $240.00
1910.1200 H
- Issued
- Aug 18, 1986
- Abate by
- Sep 18, 1986
- Penalty
- Initial $160 · Current $85 Reduced
Recent events (2)
- — I (S) $85.00
- — Z (S) $160.00
1910.1200 E01
- Issued
- Aug 18, 1986
- Abate by
- Sep 18, 1986
1910.133 A01
- Issued
- Aug 18, 1986
- Abate by
- Aug 27, 1986
- Penalty
- Current $240
Recent events (3)
- — Q $240.00
- — I (S) $240.00
- — Z (S) $240.00
1910.252 E01
- Issued
- Aug 18, 1986
- Abate by
- Sep 18, 1986
Recent events (2)
- — I (S)
- — Z (S)
1910.22 A01
- Issued
- Aug 18, 1986
- Abate by
- Sep 18, 1986
- Penalty
- Initial $320 · Current $165 Reduced
Recent events (2)
- — I (R) $165.00
- — Z (R) $320.00
1910.219 E01 I
- Issued
- Aug 18, 1986
- Abate by
- Sep 18, 1986
- Penalty
- Initial $320 · Current $165 Reduced
Recent events (2)
- — I (R) $165.00
- — Z (R) $320.00
1904.2 A
- Issued
- Aug 18, 1986
- Abate by
- Aug 27, 1986
- Penalty
- Initial $80 · Current $45 Reduced
Recent events (2)
- — I (O) $45.00
- — Z (O) $80.00
1904.4
- Issued
- Aug 18, 1986
- Abate by
- Aug 27, 1986
- Penalty
- Initial $80 · Current $45 Reduced
Recent events (2)
- — I (O) $45.00
- — Z (O) $80.00
1910.22 D01
- Issued
- Aug 18, 1986
- Abate by
- Sep 18, 1986
1910.107 G03
- Issued
- Aug 18, 1986
- Abate by
- Aug 27, 1986
1910.252 A02 IVC
- Issued
- Aug 18, 1986
- Abate by
- Aug 20, 1986
1910.252 D02 VII
- Issued
- Aug 18, 1986
- Abate by
- Sep 18, 1986
1910.252 E02 III
- Issued
- Aug 18, 1986
- Abate by
- Sep 18, 1986
1910.303 F
- Issued
- Aug 18, 1986
- Abate by
- Aug 27, 1986
1910.303 G01 II
- Issued
- Aug 18, 1986
- Abate by
- Sep 18, 1986
More inspections at Accurate Signs, INC.
View Accurate Signs, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in OH
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 101723120.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.