TEXARKANA, TX ·
OSHA Inspection: DAY & ZIMMERMAN, INC., LONE STAR DIVISION
Complaint inspection · Health discipline
At a glance
On , OSHA opened a complaint health inspection of DAY & ZIMMERMAN, INC., LONE STAR DIVISION in HWY 82 WEST, TEXARKANA, TX 75501 (NAICS 000000). OSHA activity number 102307626.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- DAY & ZIMMERMAN, INC., LONE STAR DIVISION
- Site address
- HWY 82 WEST
- City
- TEXARKANA
- State
- TX
- ZIP
- 75501
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Complete (A)
- Discipline
- Health
- Advance notice
- No
- Union status
- Union (A)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 2892
- Employees
- 1800
- Ownership type
- Private (A)
Citations
5 citations on file for this inspection.
5(a)(1)
- Issued
- Jun 12, 1990
- Abate by
- Dec 13, 1990
- Penalty
- Initial $9,000 · Current $900 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to: a) Employees on B-line, Building 4, involved in the installation of sliderlocks were exposed to undue repetitive motion trauma. This trauma was due to repeated hand and wrist exertions causing, aggravating, or precipitating the Carpal Tunnel Syndrome, tendonitis, tenosynovitis, and ganglionic cysts. Feasible abatement methods include but are not limited to the following: Abatement will normally be multi-step as follows: Step 1 - Submit to the Area Director a written, detailed plan of abatement outlining a schedule for the implementation of engineering or administrative measures to control employee injury due to cumulative trauma disorders. The plan shall include, at a minimum, target dates for the following actions which should be consistent with dates required by this citation: a) Evaluation of the extent and location of the hazard source. b) Evaluation of control measure options c) Selection of optimum control measures d) Determination of control measure design e) Ordering and delivery of equipment and materials f) Installation of control measures g) Training of employees in proper operation and maintenance of newly implemented control measures h) Specialized training of foreman and line-superintendents to assure effective performance of control measures i) Training of line-superintendents, foreman and employees on Cumulative Trauma, disorders and how to reduce the effects. All proposed control measures shall be approved for each particular use by a competent Industrial Hygienist or other technically qualified person. Ninety (90) day progress reports are required during the abatement period (The Ninety (90) Day requirement for submission of progress reports may be shortened or lengthened by the area office depending on the specific circumstances). Step 2 - Administrative controls include but are not limited to: a) Provide pre-employment examinations pertinent to medical nerve distribution and muscular observations, wrist flex test, electromyelogram (conduction time of nerve-routine evaluation during employment). b) Implementation of a training program for Line Superintendents, foreman and employees including, but not limited to, awareness of ergonomic disorders, maintenance of musculosketal health, proper positioning of work station components and conduct task(s), and the importance of reducing biomechanical stress to the body. c) Provide a periodic review (i.e. annual audit of the changes and program by a trained specialist) to ascertain the effectiveness of changes and the overall program. Step 3 - Engineering controls include but are not limited to the following: a) Analysis of job tasks to determine feasibility of work stations and/or operational redesign and the steps needed to reduce exposure. b) Selection of method(s) to reduce exposure utilizing a problem solving approach to redesign of processes and/or work stations. b) Employees on B-Line, Building 4, involved in the pack-out operation, were exposed to improper lifting techniques while lifting trays of grenades from buggie to shipping crates. The incidence rate was 18.2 for 1987, 9.1 for 1988, and 18.2 for 1989. General methods of control include but are not limited to the following: Abatement normally will be multistep as follows: Step 1 - Effective administrative protection, such as employee training physical assesment, and job rotation, shall be provided as an interim protective measure until feasible engineering or administrative controls can be implemented or whenever such controls fail to reduce employee exposure to minimal risk. All proposed control measures shall be approved for each particular use by a competent Industrial Hygienist or other technically qualified person. Ninety (90) day progress reports are required during the abatement period. (The ninety (90) day requirement for the submission of progress reports may be shortened or lengthened by the area office depending of the specific circumstances). Step 2 - Correction shall be completed by the implementation of feasible engineering and/or administrative controls and their effectiveness at achieving compliance verified. Step 3 - Submit to the Area Director a written detailed plan of abatement outlining a schedule for the implementation engineering and/or administrative measures to control employee injury due to manual lifting tasks. Engineering controls to reduce musculoskeletal stresses include but are not limited to job redesign. Reduction of the lifting frequency and provide mechanical lifting aids. This plan shall include at a minimum, target dates for the following actions which should be consistent with the dates required by the citation. 1) Evaluation of the conditions, locations and manul lifting activities that the employees are performing at the onset of musculoskeletal injuries. 2) Evaluation of applicable control measures. 3) Procurement, installation and operation of selected control measures. 4) Medical history and medical screening of employees involved with lifting practices, in order to determine previous or existing predisposition to develop back problems. 5) Monitoring of the program effectiveness and/or of the effective utilization of the control measures.
Recent events (2)
- · I (S) $900.00
- · Z (W) $9000.00
1904.2 A
- Issued
- Jun 12, 1990
- Abate by
- Jul 3, 1990
- Penalty
- Initial $100 · Current $100
Recent events (2)
- · I (O) $100.00
- · Z (O) $100.00
1910.1025 D02
- Issued
- Jun 12, 1990
- Abate by
- Aug 3, 1990
Recent events (2)
- · I (O)
- · Z (O)
1910.1025 L01 I
- Issued
- Jun 12, 1990
- Abate by
- Jun 25, 1990
Recent events (2)
- · I (O)
- · Z (O)
1910.1200 H01
- Issued
- Jun 12, 1990
- Abate by
- Jun 25, 1990
Recent events (2)
- · I (O)
- · Z (O)
More inspections at DAY & Zimmerman, INC., Lone Star Division
View DAY & Zimmerman, INC., Lone Star Division's full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in TX
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 102307626.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.