OSHA Inspection: DAY & ZIMMERMAN, INC., LONE STAR DIVISION

Complaint inspection · Health discipline

On , OSHA opened a complaint health inspection of DAY & ZIMMERMAN, INC., LONE STAR DIVISION in HWY 82 WEST, TEXARKANA, TX 75501 (NAICS 000000). OSHA activity number 102307626.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch DAY & Zimmerman, INC., Lone Star Division for free Get an email when a new federal OSHA severe-injury report for DAY & Zimmerman, INC., Lone Star Division is published. One employer, no account, unsubscribe in one click.
Site address
HWY 82 WEST
City
TEXARKANA
State
TX
ZIP
75501
Inspection type
Complaint (B)
Scope
Complete (A)
Discipline
Health
Advance notice
No
Union status
Union (A)
Opened
Closing conference
Case closed
Data loaded
NAICS code
000000
SIC code (legacy)
2892
Employees
1800
Ownership type
Private (A)

5 citations on file for this inspection.

5(a)(1)

Serious Gravity 09 2 instances 50 exposed
Issued
Jun 12, 1990
Abate by
Dec 13, 1990
Penalty
Initial $9,000 · Current $900 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not furnish employment and a place of employment which were
free from recognized hazards that were causing or likely to cause death
or serious physical harm to employees in that employees were exposed to:
a) Employees on B-line, Building 4, involved in the installation of
sliderlocks were exposed to undue repetitive motion trauma. This
trauma was due to repeated hand and wrist exertions causing,
aggravating, or precipitating the Carpal Tunnel Syndrome, tendonitis,
tenosynovitis, and ganglionic cysts.
Feasible abatement methods include but are not limited to the following:
Abatement will normally be multi-step as follows:
Step 1 - Submit to the Area Director a written, detailed plan of
abatement outlining a schedule for the implementation of engineering or
administrative measures to control employee injury due to cumulative
trauma disorders.  The plan shall include, at a minimum, target dates
for the following actions which should be consistent with dates required
by this citation:
a) Evaluation of the extent and location of the hazard source.
b) Evaluation of control measure options
c) Selection of optimum control measures
d) Determination of control measure design
e) Ordering and delivery of equipment and materials
f) Installation of control measures
g) Training of employees in proper operation and maintenance of newly
implemented control measures
h) Specialized training of foreman and line-superintendents to assure
effective performance of control measures
i) Training of line-superintendents, foreman and employees on Cumulative
Trauma, disorders and how to reduce the effects.
All proposed control measures shall be approved for each particular use
by a competent Industrial Hygienist or other technically qualified
person. Ninety (90) day progress reports are required during the
abatement period (The Ninety (90) Day requirement for submission of
progress reports may be shortened or lengthened by the area office
depending on the specific circumstances).
Step 2 - Administrative controls include but are not limited to:
a) Provide pre-employment examinations pertinent to medical nerve
distribution and muscular observations, wrist flex test,
electromyelogram (conduction time of nerve-routine evaluation during
employment).
b) Implementation of a training program for Line Superintendents,
foreman and employees including, but not limited to, awareness of
ergonomic disorders, maintenance of musculosketal health, proper
positioning of work station components and conduct task(s), and the
importance of reducing biomechanical stress to the body.
c) Provide a periodic review (i.e. annual audit of the changes and
program by a trained specialist) to ascertain the effectiveness of
changes and the overall program.
Step 3 - Engineering controls include but are not limited to the
following:
a) Analysis of job tasks to determine feasibility of work stations
and/or operational redesign and the steps needed to reduce exposure.
b) Selection of method(s) to reduce exposure utilizing a problem solving
approach to redesign of processes and/or work stations.
b) Employees on B-Line, Building 4, involved in the pack-out operation,
were exposed to improper lifting techniques while lifting trays of
grenades from buggie to shipping crates. The incidence rate was 18.2
for 1987, 9.1 for 1988, and 18.2 for 1989.
General methods of control include but are not limited to the following:
Abatement normally will be multistep as follows:
Step 1 - Effective administrative protection, such as employee training
physical assesment, and job rotation, shall be provided as an interim
protective measure until feasible engineering or administrative controls
can be implemented or whenever such controls fail to reduce employee
exposure to minimal risk.
All proposed control measures shall be approved for each particular use
by a competent Industrial Hygienist or other technically qualified
person.  Ninety (90) day progress reports are required during the
abatement period.  (The ninety (90) day requirement for the submission
of progress reports may be shortened or lengthened by the area office
depending of the specific circumstances).
Step 2 - Correction shall be completed by the implementation of
feasible engineering and/or administrative controls and their
effectiveness at achieving compliance verified.
Step 3 - Submit to the Area Director a written detailed plan of
abatement outlining a schedule for the implementation engineering and/or
administrative measures to control employee injury due to manual lifting
tasks.  Engineering controls to reduce musculoskeletal stresses include
but are not limited to job redesign.  Reduction of the lifting frequency
and provide mechanical lifting aids.
This plan shall include at a minimum, target dates for the following
actions which should be consistent with the dates required by the
citation.
1) Evaluation of the conditions, locations and manul lifting activities
that the employees are performing at the onset of musculoskeletal
injuries.
2) Evaluation of applicable control measures.
3) Procurement, installation and operation of selected control
measures.
4) Medical history and medical screening of employees involved with
lifting practices, in order to determine previous or existing
predisposition to develop back problems.
5) Monitoring of the program effectiveness and/or of the effective
utilization of the control measures.
Recent events (2)
  • · I (S) $900.00
  • · Z (W) $9000.00

1904.2 A

Deleted Other-than-serious Gravity 01 3 instances 999 exposed
Issued
Jun 12, 1990
Abate by
Jul 3, 1990
Penalty
Initial $100 · Current $100
Recent events (2)
  • · I (O) $100.00
  • · Z (O) $100.00

1910.1025 D02

Deleted Other-than-serious Gravity 01 1 instance 1 exposed
Issued
Jun 12, 1990
Abate by
Aug 3, 1990
Recent events (2)
  • · I (O)
  • · Z (O)

1910.1025 L01 I

Deleted Other-than-serious Gravity 01 1 instance 1 exposed
Issued
Jun 12, 1990
Abate by
Jun 25, 1990
Recent events (2)
  • · I (O)
  • · Z (O)

1910.1200 H01

Deleted Other-than-serious Gravity 01 1 instance 1 exposed
Issued
Jun 12, 1990
Abate by
Jun 25, 1990
Recent events (2)
  • · I (O)
  • · Z (O)

View DAY & Zimmerman, INC., Lone Star Division's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 102307626.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.