OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- HERCO, INCORPORATED, DBA: HERSHEYPARK
- Site address
- 100 W. HERSHEYPARK DRIVE
- City
- HERSHEY
- State
- PA
- ZIP
- 17033
- Mailing
- 300 PARK BOULEVARD, HERSHEY, PA 17033
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 7996
- Employees
- 2400
- Ownership type
- A
Citations
4 citations on file for this inspection.
5(a)(1)
- Issued
- Nov 13, 1991
- Abate by
- May 14, 1992
- Penalty
- Initial $2,275 · Current $1,700 Reduced
8320
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to excessive heat stress when performing work in areas of devated thermal environments: (a) Kitchen, Sarsaparilla Saloon - Hostess(es) and/or Host(s) were exposed to heat stress at Time-Weighted Average (TWA) levels of up to 30.4 census Wet-Bulb/ Globe Temperature (WBGT) during heat stress measurements made on July 13, 1991. These levels represent exposure(s) of up to approximately 107% of the permissible heat exposure Threshold Limit Values (TLV's) published by the American Conference of Governmental Industrial Hygienists (ACGIH). These limits were established to prevent heat-induced illnesses, up to and including heat strokes, on or about July 17, 1991. (b) Trailblazer Funnel Cake Stand - Hostess(es) and/or Host(s) were exposed to heat stress at Time-Weighted Average (TWA) levels of up to 32.6 census Wet-Bulb/ Globe Temperature (WBGT) during heat stress measurements made on July 13, 1991. These levels represent exposure(s) of up to approximately 109% of the permissible heat exposure Threshold Limit Values (TLV's) published by the American Conference of Governmental Industrial Hygienists (ACGIH). These limits were established to prevent heat-induced illnesses, up to and including heat strokes, on or about July 17, 1991. Among others, one feasible and useful means of abatement method to correct this hazards is to provide improved, adequate exhaust ventila- tion of air heated by cooking appliances, and/or spot cooling of employee work position locations with refrigerated air. Abatement Schedule Step 1 - A written detailed plan of abatement shall be submitted to the Area Director outlining a schedule for the implementation of engineering and/or administrative measures to control employee exposures to hazardous substances as referenced in this cita- tion. This plan shall include, at a minimum, target dates for the following actions which must be consistent with the abate- ment dates required by this citation: (1) Evaluation of engineering/administrative control options; (2) Selection of optimum control methods and completion of design; (3) Procurement, installation and operation of selected con- trol measures; (4) Testing and acceptance or modification/redesign of con- trols. All proposed control measures shall be approved for each particular use by a competent industrial hygienist or other technically qualified person. 90-day progress reports are required during the abatement period. Step 2 - Abatement shall have been completed by the implementation of feasible engineering and/or administrative controls upon veri- fication of their effectiveness in achieving compliance.
Recent events (2)
- — I (S) $1700.00
- — Z (S) $2275.00
1904.2 A
- Issued
- Nov 13, 1991
- Abate by
- Dec 14, 1991
- Penalty
- Initial $650 · Current $200 Reduced
Recent events (2)
- — I (O) $200.00
- — Z (O) $650.00
1904.5 C
- Issued
- Nov 13, 1991
- Abate by
- Dec 14, 1991
1910.1200 E01
- Issued
- Nov 13, 1991
- Abate by
- Dec 31, 1991
- Penalty
- Initial $650 · Current $200 Reduced
Recent events (2)
- — I (O) $200.00
- — Z (O) $650.00
More inspections in this industry (NAICS 000000)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 102596525.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.