MENOKEN, ND —
OSHA Inspection: NORTH DAKOTA CONCRETE PRODUCTS COMPANY
Accident-driven inspection · Safety discipline
At a glance
On , OSHA opened an accident-driven safety inspection of NORTH DAKOTA CONCRETE PRODUCTS COMPANY in 1101 158TH STREET NE, MENOKEN, ND 58558 (NAICS 000000). OSHA activity number 102763059.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- NORTH DAKOTA CONCRETE PRODUCTS COMPANY
- Site address
- 1101 158TH STREET NE
- City
- MENOKEN
- State
- ND
- ZIP
- 58558
- Mailing
- 925 BASIN AVENUE, BISMARCK, ND 58504
What kind of inspection was it?
- Inspection type
- Accident-driven (A)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Y
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 3272
- Employees
- 40
- Ownership type
- A
- Industry flags
- Manufacturing safety.
Citations
1 citation on file for this inspection.
5(a)(1)
- Issued
- Jun 13, 2002
- Abate by
- Jul 15, 2002
- Penalty
- Initial $4,500 · Current $3,375 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to: (a) On or about 04/04/02 for employees engaged in the manufacture of pre-stress concrete bridge supports and exposed to the potential hazard of being struck by 0.60 diameter cable being stressed to approximately 13,400 lb/sq. ft. of upward force. Among other methods, three combined feasible and acceptable abatement methods to correct this hazard would be to: 1. Replace the existing clevis now in use with a clevis engineered and designed to withstand the upward force imposed by the drape strand and potential cold brittle fracture created by cold weather use. 2. Engineer a system for the pre-stress concrete pouring process that would eliminate the need to install a wood shim under the clevises holding the drape strands. The elimination of the wood shim would remove employees from a "line of fire" hazard created by the drape strand cable. 3. Engineer and install a system of restraints that would be applied to the drape strands and all other cables under tension in the pre-stress concrete pouring process to contain those cables under tension in the event of cable or clevis failure. Abatement Note: Abatement certification and documentation are required for this item (see enclosed "Sample Abatement Certification Letter").tion
Recent events (2)
- — I (S) $3375.00
- — Z (S) $4500.00
More inspections at North Dakota Concrete Products Company
View North Dakota Concrete Products Company's full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in ND
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 102763059.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.