MIAMI, FL ·
OSHA Inspection: P.J. CONSTRUCTORS INC.
Unprogrammed Related inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Related safety inspection of P.J. CONSTRUCTORS INC. in I-95 & 71ST ST, MIAMI, FL 33150 (NAICS 000000). OSHA activity number 102825734.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- P.J. CONSTRUCTORS INC.
- Site address
- I-95 & 71ST ST
- City
- MIAMI
- State
- FL
- ZIP
- 33150
- Mailing
- 4100 SW 70TH COURT, MIAMI, FL 33155
What kind of inspection was it?
- Inspection type
- Unprogrammed Related (G)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 8711
- Employees
- 5
- Ownership type
- A
- Industry flags
- Construction safety.
Citations
3 citations on file for this inspection.
5(a)(1)
- Issued
- Jul 10, 1989
- Abate by
- Jul 14, 1989
- Penalty
- Initial $720 · Current $400 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The %% employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to: On June 8, 1989 at the NW 25th Street-Miami project, employee(s) were exposed to the hazards of broken bones and death from vehicular traffic, while surveying, in the center and at the road edges. Particular concerns include the following hazards: a) Employee(s) were not wearing traffic warning garments (safety vests) when entering and working adjacent to highly congested traffic areas. Among other methods a feasible and acceptable method to abate these hazards is to train employee(s) in the recognition of hazards associated with working in traffic: 1) Require employee(s) to wear traffic vest at all times, including when working in and next to traffic. 2) Set up frequent and regular site inspections with a disciplinary program for employee(s) who violate the company safety rules.
Recent events (2)
- · I (S) $400.00
- · Z (S) $720.00
1926.20 B01
- Issued
- Jul 10, 1989
- Abate by
- Jul 14, 1989
1926.20 B02
- Issued
- Jul 10, 1989
- Abate by
- Jul 14, 1989
More inspections at P.J. Constructors INC.
View P.J. Constructors INC.'s full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in FL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 102825734.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.