MAYPORT, PA ·
OSHA Inspection: D. K. GAS, INC.
Accident-driven inspection · Safety discipline
At a glance
On , OSHA opened an accident-driven safety inspection of D. K. GAS, INC. in RED BANK TOWNSHIP, R.D. #1, MAYPORT, PA 16240 (NAICS 000000). OSHA activity number 102871399.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- D. K. GAS, INC.
- Site address
- RED BANK TOWNSHIP, R.D. #1
- City
- MAYPORT
- State
- PA
- ZIP
- 16240
- Mailing
- R.D. #1, MAYPORT, PA 16240
What kind of inspection was it?
- Inspection type
- Accident-driven (A)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (B)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 1311
- Employees
- 2
- Ownership type
- Private (A)
- Industry flags
- Manufacturing safety.
Citations
2 citations on file for this inspection.
5(a)(1)
- Issued
- Mar 9, 1990
- Abate by
- Apr 11, 1990
- Penalty
- Initial $1,000 · Current $750 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees: a) High pressure explosions from natural gas wells that are constructed using materials not approved or manufactured for the purpose in which they were used and where the failure of such material could cause the ejection of the materials from the well. Among other possible methods of abatement the following is considered the most feasible and reasonable to implement: 1) The use of a pressure tested Tension Wall Packer on natural gas wells when an interior conduit (frac. pipe ) is used. 2) The installation of a short pipe nipple and coupling to facilitate the pipe clamp, providing a pipe coupling below the clamp to hold the pressure of the well in the event the packer fails. 3) The use of permanently attached bolts to the well casing to hold the pipe clamp.
Recent events (2)
- · F (S) $750.00
- · Z (S) $1000.00
1903.2 A01
- Issued
- Mar 9, 1990
- Abate by
- Apr 11, 1990
Recent events (2)
- · F (O)
- · Z (O)
More inspections in this industry (NAICS 000000)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 102871399.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.