Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: HILL PRECISION, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of HILL PRECISION, INC. in 135 E. INDUSTRY CT., DEER PARK, NY 11729 (NAICS 000000). OSHA activity number 102877818.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Hill Precision, INC. — free Get an email when a new federal OSHA severe-injury report for Hill Precision, INC. is published. One employer, no account, unsubscribe in one click.
Site address
135 E. INDUSTRY CT.
City
DEER PARK
State
NY
ZIP
11729
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
Y
Opened
Closing conference
Case closed
Data loaded
NAICS code
000000
SIC code (legacy)
3443
Employees
16
Ownership type
A
Industry flags
Manufacturing safety.

23 citations on file for this inspection.

5(a)(1)

Serious Gravity 02 1 instance 1 exposed
Issued
Oct 18, 1993
Abate by
Nov 22, 1993
Penalty
Initial $600 · Current $300 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of
1970.
The employer did not furnish employment and a place of employment
which were free from recognized hazards that were causing or likely
to cause death or serious physical harm to employees in that
employees were exposed to the hazards of being pulled into and
crushed by the rotating parts of pipe threading machine:
(a)  In the Shop, Near the Iron Worker - An employee
operated a Ridgid 400 pipe threading machine
which was activated by a toggle switch that
would not automatically shut the machine off
if the operator was inadvertently caught up in
its rotating parts; on or bout 6/30/93.
ABATEMENT NOTES:
Among other methods, one feasible method to reduce this hazard is
to establish and enforce adequate safe operating procedures.
Procedures such as those stipulated in American National Standard
for Portable Pipe Threading Machine (ANSI B208.1-1982).  Elements
essential to an acceptable safe operating procedure include at a
minimum:
1.   Installation of a momentary contact device (deadman foot
switch) to control power input to the machine.  This
device would automatically stop the machine and the
rotating pipe if the operator's foot was removed from the
foot switch for any reason.
2.   Provide training and education to the machine operators
concerning all the appropriate procedures for the safe
operation and use of this type of
Recent events (2)
  • — J (S) $300.00
  • — Z (S) $600.00

1910.106 D02 I

Serious Gravity 02 1 instance 1 exposed
Issued
Oct 18, 1993
Abate by
Nov 22, 1993
Penalty
Initial $600 · Current $300 Reduced
Recent events (2)
  • — J (S) $300.00
  • — Z (S) $600.00

1910.132 A

Serious Gravity 02 1 instance 1 exposed
Issued
Oct 18, 1993
Abate by
Nov 22, 1993
Penalty
Initial $600 · Current $300 Reduced
Recent events (2)
  • — J (S) $300.00
  • — Z (S) $600.00

1910.147 C01

Serious Gravity 03 1 instance 12 exposed
Issued
Oct 18, 1993
Abate by
Nov 22, 1993
Penalty
Initial $750 · Current $375 Reduced
Recent events (2)
  • — J (S) $375.00
  • — Z (S) $750.00

1910.147 C07 I

Serious Gravity 03 1 instance 12 exposed
Issued
Oct 18, 1993
Abate by
Nov 22, 1993
Recent events (2)
  • — J (S)
  • — Z (S)

1910.212 A03 II

Serious Gravity 03 3 instances 3 exposed
Issued
Oct 18, 1993
Abate by
Nov 5, 1993
Penalty
Initial $750 · Current $375 Reduced
Recent events (2)
  • — J (S) $375.00
  • — Z (S) $750.00

1910.215 A01

Serious Gravity 01 1 instance 3 exposed
Issued
Oct 18, 1993
Abate by
Nov 22, 1993
Penalty
Initial $450 · Current $225 Reduced
Recent events (2)
  • — J (S) $225.00
  • — Z (S) $450.00

1910.304 F05 V

Serious Gravity 10 1 instance 12 exposed
Issued
Oct 18, 1993
Abate by
Oct 21, 1993
Penalty
Initial $1,500 · Current $750 Reduced
Recent events (2)
  • — J (S) $750.00
  • — Z (S) $1500.00

1910.305 B01

Serious Gravity 10 3 instances 12 exposed
Issued
Oct 18, 1993
Abate by
Nov 1, 1993
Recent events (2)
  • — J (S)
  • — Z (S)

1910.305 B02

Serious Gravity 10 4 instances 12 exposed
Issued
Oct 18, 1993
Abate by
Nov 22, 1993
Recent events (2)
  • — J (S)
  • — Z (S)

1910.305 G02 III

Serious Gravity 10 1 instance 12 exposed
Issued
Oct 18, 1993
Abate by
Nov 22, 1993
Recent events (2)
  • — J (S)
  • — Z (S)

1910.334 A01

Serious Gravity 10 1 instance 12 exposed
Issued
Oct 18, 1993
Abate by
Nov 22, 1993
Recent events (2)
  • — J (S)
  • — Z (S)

1910.334 A04

Serious Gravity 10 1 instance 12 exposed
Issued
Oct 18, 1993
Abate by
Oct 21, 1993
Recent events (2)
  • — J (S)
  • — Z (S)

1910.22 A01

Other-than-serious Gravity 01 1 instance
Issued
Oct 18, 1993
Abate by
Oct 21, 1993
Recent events (2)
  • — J (O)
  • — Z (O)

1910.36 B04

Other-than-serious Gravity 01 1 instance 2 exposed
Issued
Oct 18, 1993
Abate by
Oct 22, 1993
Recent events (2)
  • — J (O)
  • — Z (O)

1910.37 K02

Other-than-serious Gravity 01 1 instance 2 exposed
Issued
Oct 18, 1993
Abate by
Nov 1, 1993
Recent events (2)
  • — J (O)
  • — Z (O)

1910.157 G02

Other-than-serious Gravity 01 4 instances 2 exposed
Issued
Oct 18, 1993
Abate by
Nov 22, 1993
Recent events (2)
  • — J (O)
  • — Z (O)

1910.252 B02 III

Other-than-serious Gravity 03 1 instance 12 exposed
Issued
Oct 18, 1993
Abate by
Oct 21, 1993
Penalty
Initial $300 · Current $150 Reduced
Recent events (2)
  • — J (O) $150.00
  • — Z (O) $300.00

1910.303 G01 I

Other-than-serious Gravity 01 1 instance 12 exposed
Issued
Oct 18, 1993
Abate by
Nov 22, 1993
Recent events (2)
  • — J (O)
  • — Z (O)

1910.1200 F05 I

Other-than-serious Gravity 01 1 instance 12 exposed
Issued
Oct 18, 1993
Abate by
Nov 22, 1993
Recent events (2)
  • — J (O)
  • — Z (O)

1910.1200 F05 II

Other-than-serious Gravity 01 1 instance 2 exposed
Issued
Oct 18, 1993
Abate by
Nov 22, 1993
Recent events (2)
  • — J (O)
  • — Z (O)

1910.1200 G01

Other-than-serious Gravity 01 1 instance 12 exposed
Issued
Oct 18, 1993
Abate by
Nov 22, 1993
Recent events (2)
  • — J (O)
  • — Z (O)

1910.1200 H

Other-than-serious Gravity 01 1 instance 12 exposed
Issued
Oct 18, 1993
Abate by
Nov 22, 1993
Recent events (2)
  • — J (O)
  • — Z (O)

View Hill Precision, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 102877818.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.