FALMOUTH, MA —
OSHA Inspection: LAWRENCE READY MIX CONCRETE
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of LAWRENCE READY MIX CONCRETE in 396 GIFFORD STREET, REAR, FALMOUTH, MA 02541 (NAICS 000000). OSHA activity number 102922507.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- LAWRENCE READY MIX CONCRETE
- Site address
- 396 GIFFORD STREET, REAR
- City
- FALMOUTH
- State
- MA
- ZIP
- 02541
- Mailing
- P.O. BOX 323, ALLSTON, MA 02134
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Y
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 3273
- Employees
- 15
- Ownership type
- A
- Industry flags
- Manufacturing safety.
Citations
12 citations on file for this inspection.
1910.23 C01
- Issued
- Sep 19, 1988
- Abate by
- Oct 19, 1988
- Penalty
- Initial $640 · Current $300 Reduced
Recent events (2)
- — I (S) $300.00
- — Z (S) $640.00
1910.23 D01 IV
- Issued
- Sep 19, 1988
- Abate by
- Oct 19, 1988
- Penalty
- Initial $400 · Current $200 Reduced
Recent events (2)
- — I (S) $200.00
- — Z (S) $400.00
1910.27 D03
- Issued
- Sep 19, 1988
- Abate by
- Oct 19, 1988
- Penalty
- Initial $400 · Current $200 Reduced
Recent events (2)
- — I (S) $200.00
- — Z (S) $400.00
1910.212 A01
- Issued
- Sep 19, 1988
- Abate by
- Oct 19, 1988
- Penalty
- Initial $480 · Current $250 Reduced
Recent events (2)
- — I (S) $250.00
- — Z (S) $480.00
1910.215 A04
- Issued
- Sep 19, 1988
- Abate by
- Oct 19, 1988
- Penalty
- Initial $400 · Current $200 Reduced
Recent events (2)
- — I (S) $200.00
- — Z (S) $400.00
1910.219 E01 I
- Issued
- Sep 19, 1988
- Abate by
- Oct 19, 1988
- Penalty
- Initial $400 · Current $200 Reduced
Recent events (2)
- — I (S) $200.00
- — Z (S) $400.00
1910.303 G02 II
- Issued
- Sep 19, 1988
- Abate by
- Oct 19, 1988
- Penalty
- Initial $240 · Current $150 Reduced
Recent events (2)
- — I (S) $150.00
- — Z (S) $240.00
1910.303 F
- Issued
- Sep 19, 1988
- Abate by
- Sep 22, 1988
1910.1200 E01 I
- Issued
- Sep 19, 1988
- Abate by
- Oct 19, 1988
1910.1200 F04 I
- Issued
- Sep 19, 1988
- Abate by
- Oct 19, 1988
1910.1200 G01
- Issued
- Sep 19, 1988
- Abate by
- Oct 19, 1988
1910.1200 H
- Issued
- Sep 19, 1988
- Abate by
- Nov 14, 1988
Recent events (2)
- — I (O)
- — Z (O)
More inspections at Lawrence Ready MIX Concrete
View Lawrence Ready MIX Concrete's full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in MA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 102922507.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.