On , OSHA opened a planned safety inspection of WORTHINGTON ARMSTRONG VENTURE in 45 MOREHALL RD., MALVERN, PA 19355 (NAICS 000000). OSHA activity number 102936879.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- WORTHINGTON ARMSTRONG VENTURE
- Site address
- 45 MOREHALL RD.
- City
- MALVERN
- State
- PA
- ZIP
- 19355
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Y
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 3316
- Employees
- 321
- Ownership type
- A
- Industry flags
- Manufacturing safety.
Citations
32 citations on file for this inspection.
5(a)(1)
- Issued
- Oct 11, 1995
- Abate by
- Oct 16, 1995
- Penalty
- Initial $2,250 · Current $2,250
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or were likely to cause death or serious physical harm to employees in that employees were exposed to a crushing hazard in the event of a speed loader crane component failure. a) Worthington Steel, Malvern PA - the speed loader crane had a badly worn lower load sheave. This could cause the sheave to fail causing the speed loader to loose its load causing injury to the employee on the ground guiding loads being landed. Observed 05/31/95. ABATEMENT NOTE: One feasible and useful means of abatement would be to perform frequent (monthly) inspections of the speed loader components and repair or replace deficiencies.
Recent events (2)
- — F (S) $2250.00
- — Z (S) $2250.00
1910.22 C
- Issued
- Oct 11, 1995
- Abate by
- Nov 13, 1995
- Penalty
- Initial $1,800 · Current $200 Reduced
Recent events (2)
- — F (O) $200.00
- — Z (S) $1800.00
1910.23 A08
- Issued
- Oct 11, 1995
- Abate by
- Nov 13, 1995
- Penalty
- Initial $1,350 · Current $250 Reduced
Recent events (2)
- — F (O) $250.00
- — Z (S) $1350.00
1910.23 B01
- Issued
- Oct 11, 1995
- Abate by
- Nov 13, 1995
- Penalty
- Initial $2,250 · Current $1,100 Reduced
Recent events (2)
- — F (S) $1100.00
- — Z (S) $2250.00
1910.23 C01
- Issued
- Oct 11, 1995
- Abate by
- Nov 13, 1995
Recent events (2)
- — F (S)
- — Z (S)
1910.23 C03
- Issued
- Oct 11, 1995
- Abate by
- Nov 13, 1995
Recent events (2)
- — F (S)
- — Z (S)
1910.133 A01
- Issued
- Oct 11, 1995
- Abate by
- Nov 13, 1995
- Penalty
- Initial $2,250 · Current $100 Reduced
Recent events (2)
- — F (O) $100.00
- — Z (S) $2250.00
1910.134 B03
- Issued
- Oct 11, 1995
- Abate by
- Nov 13, 1995
- Penalty
- Initial $1,800 · Current $200 Reduced
Recent events (2)
- — F (O) $200.00
- — Z (S) $1800.00
1910.134 B10
- Issued
- Oct 11, 1995
- Abate by
- Nov 13, 1995
Recent events (2)
- — F (O)
- — Z (S)
1910.134 E05 I
- Issued
- Oct 11, 1995
- Abate by
- Nov 13, 1995
Recent events (2)
- — F (O)
- — Z (S)
1910.136 A
- Issued
- Oct 11, 1995
- Abate by
- Nov 13, 1995
- Penalty
- Initial $1,800 · Current $1,800
Recent events (2)
- — F (S) $1800.00
- — Z (S) $1800.00
1910.147 D04 II
- Issued
- Oct 11, 1995
- Abate by
- Nov 13, 1995
- Penalty
- Initial $2,250 · Current $100 Reduced
Recent events (2)
- — F (O) $100.00
- — Z (S) $2250.00
1910.151 C
- Issued
- Oct 11, 1995
- Abate by
- Oct 16, 1995
- Penalty
- Initial $2,250 · Current $1,000 Reduced
Recent events (2)
- — F (S) $1000.00
- — Z (S) $2250.00
1910.176 B
- Issued
- Oct 11, 1995
- Abate by
- Nov 13, 1995
- Penalty
- Initial $2,250 · Current $100 Reduced
Recent events (2)
- — F (O) $100.00
- — Z (S) $2250.00
1910.178 A04
- Issued
- Oct 11, 1995
- Abate by
- Nov 13, 1995
- Penalty
- Initial $2,250 · Current $800 Reduced
Recent events (2)
- — F (S) $800.00
- — Z (S) $2250.00
1910.179 N01
- Issued
- Oct 11, 1995
- Abate by
- Nov 13, 1995
- Penalty
- Initial $2,250 · Current $900 Reduced
Recent events (2)
- — F (S) $900.00
- — Z (S) $2250.00
1910.179 N02 II
- Issued
- Oct 11, 1995
- Abate by
- Nov 13, 1995
- Penalty
- Initial $2,250 · Current $500 Reduced
Recent events (2)
- — F (S) $500.00
- — Z (S) $2250.00
1910.212 A01
- Issued
- Oct 11, 1995
- Abate by
- Nov 13, 1995
- Penalty
- Initial $1,800 · Current $900 Reduced
Recent events (2)
- — F (S) $900.00
- — Z (S) $1800.00
1910.212 A03 II
- Issued
- Oct 11, 1995
- Abate by
- Nov 13, 1995
- Penalty
- Initial $2,250 · Current $900 Reduced
Recent events (2)
- — F (S) $900.00
- — Z (S) $2250.00
1910.213 H01
- Issued
- Oct 11, 1995
- Abate by
- Nov 13, 1995
- Penalty
- Initial $2,250 · Current $500 Reduced
Recent events (2)
- — F (S) $500.00
- — Z (S) $2250.00
1910.219 F03
- Issued
- Oct 11, 1995
- Abate by
- Nov 13, 1995
- Penalty
- Initial $1,800 · Current $200 Reduced
Recent events (2)
- — F (O) $200.00
- — Z (S) $1800.00
1910.303 G02 I
- Issued
- Oct 11, 1995
- Abate by
- Oct 16, 1995
- Penalty
- Initial $2,250 · Current $600 Reduced
Recent events (2)
- — F (S) $600.00
- — Z (S) $2250.00
1910.146 C04
- Issued
- Oct 11, 1995
- Abate by
- Nov 13, 1995
- Penalty
- Initial $63,000 · Current $650 Reduced
Recent events (2)
- — F (O) $650.00
- — Z (W) $63000.00
1910.36 B04
- Issued
- Oct 11, 1995
- Abate by
- Nov 13, 1995
Recent events (2)
- — F (O)
- — Z (O)
1910.157 C01
- Issued
- Oct 11, 1995
- Abate by
- Nov 13, 1995
Recent events (2)
- — F (O)
- — Z (O)
1910.179 B05
- Issued
- Oct 11, 1995
- Abate by
- Nov 13, 1995
Recent events (2)
- — F (O)
- — Z (O)
1910.179 J02
- Issued
- Oct 11, 1995
- Abate by
- Nov 13, 1995
Recent events (2)
- — F (O)
- — Z (O)
1910.303 F
- Issued
- Oct 11, 1995
- Abate by
- Nov 13, 1995
Recent events (2)
- — F (O)
- — Z (O)
1910.303 G02 II
- Issued
- Oct 11, 1995
- Abate by
- Nov 13, 1995
Recent events (2)
- — F (O)
- — Z (O)
1910.305 B01
- Issued
- Oct 11, 1995
- Abate by
- Nov 13, 1995
Recent events (2)
- — F (O)
- — Z (O)
1910.305 G01 IIIA
- Issued
- Oct 11, 1995
- Abate by
- Nov 13, 1995
Recent events (2)
- — F (O)
- — Z (O)
1910.1200 F05
- Issued
- Oct 11, 1995
- Abate by
- Nov 13, 1995
Recent events (2)
- — F (O)
- — Z (O)
More inspections at Worthington Armstrong Venture
View Worthington Armstrong Venture's full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 102936879.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.