On , OSHA opened a planned safety inspection of B. P. AMOCO PLC in 4001 CEDAR POINT ROAD, OREGON, OH 43616 (NAICS 000000). OSHA activity number 103062634.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- B. P. AMOCO PLC
- Site address
- 4001 CEDAR POINT ROAD
- City
- OREGON
- State
- OH
- ZIP
- 43616
- Mailing
- P. O. BOX 696, TOLEDO, OH 43694
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Y
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 2911
- Employees
- 450
- Ownership type
- A
- Industry flags
- Manufacturing safety.
Citations
57 citations on file for this inspection.
5(a)(1)
- Issued
- Mar 23, 1992
- Abate by
- Apr 24, 1992
- Penalty
- Initial $5,000 · Current $5,000
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to the hazard of inhalation of toxic substances at B P Toledo Refinery under normal operating conditions or as a result of system upset and/or equipment failure: a) B P did not have a fixed monitoring system for hydrocarbons on the M.O.V. deck of Reformer 1. b) B P did not have an adequate or properly enforced confined space entry permit system. c) B P did not assure that start-up procedures were effective. 1) October 6, 1991, at Reformer 1, a fire occurred due to inadequate start-up procedures in not having introduced flow through the convection section tubes until after the burners had been lit. d) B P did not have an effective and properly implemented hot work permit system for use in flammable and/or potentially hazardous areas. e) B P did not assure that relieving devices were properly sized, installed, maintained, and tested. 1) Pressure relieving devices were not assured to be sized for worst case scenarios, i.e. Sat Gas/Naptha Treater SV #1410, SV #1414, SV #1435, SV #1470, Alky II SV #409, FCC I SV #1272A. 2) Relieving devices were not inspected and tested on a frequent interval as indicated by the B P Safety Relief Valve Computer Program, i.e. Coker I SV #1213, Crude Vac I SV #1126, North Tank Field (NTF) SV# 1993, SV #1998, LPG SV #331. 3) The integrity of pressure relieving devices was not assured by allowing operators to hammer on relieving devices that had relieved and did not reseat, i.e. Reformer I area. 4) The discharge from each pressure reliving device did not vent to a safe location, i.e. SV #1504 Regen Furnace outlet which had a drain pipe that exited less that 6 ft. from the ground which could direct part of the discharge towards an operator. f) B P did not establish an effective program of installation, inspection, and maintenance of piping, valves, and fittings. 1) The piping inspections did not adequately determine the corrosion rate, life expectancy, or the next test date. For on-stream and newly installed piping and fittings, i.e. Reformer I area piping and fittings as noted on the Pipescan report. 2) Anomalous thickness data, such as increasing thickness measurements were not resolved, i.e. Reformer I area piping and fittings as noted in the Pipescan report. 3) Incorrect materials and/or devices were used, i.e. on pipe flanges immediately adjacent of pump PR #5978 in the Alky III unit, a flange connecting a 6 in. diameter pressure line operating at 300 lbs. pressure at 50 degrees F., was connected at the flange by B7 studs and nuts. Six of the studs were 5 in. long as required and the other two studs were too short, thus not allowing the complete mating of the internal and external threads, thereby reducing the strength of the assemblies. At least two of the internal threads on the nut were not seated. 4) Studs found in the material warehouse were not identified as to grade as required. g) B P did not assure that instrumentation, controls, and alarms were installed and used. 1) October 10, 1991, a fire occurred at tank #705 located at the Asphalt Plant Tank Area, this was due to a lack of instrumentation and/or controls to prevent the draining (pumping out of asphalt) of holding tanks to a level that allowed the gas fired heaters to cause ignition of the remaining asphalt. h) B P did not assure protection of employees in occupied work areas. 1) On November 8, 1991, a fire and an uncontrolled release of isobutane occurred caused by contractor employees attempting to reinstall a safety valve on the piping to the Coalescer on #2 Alkylation Unit, B P employees were working in #2 Alkylation Unit approximately 20 feet away. The ventilation system for the #2 Alkylation Unit control room consists of opening windows and running of the air conditioner which could allow a flammable hydrocarbon release (such as an uncontrolled release of isobutane which occurred) in the area. The isobutane could have been drawn into the #2 Alkylation Unit control room where it may reach a possible ignition source and could result in an unconfined vapor cloud explosion. #2 Alkylation Unit Control Room did not have a positive ventilation system, to prevent entrance of toxic vapor and/or gas into the control room. Filtered air shall be monitored to ensure its continued quality. 2) Reformer 1, Satellite Control Room #2 did not have a positive ventilation system, to prevent entrance of toxic vapor and/or gas into the control room. Filtered air shall be monitored to ensure its continued quality. A feasible and useful method of correcting these hazards include but is not limited to the following: a) Install a fixed monitoring system to determine hydrocarbon leakage on the MOV deck of Reformer 1. This system should be installed, calibrated and maintained so as to issue a warning to employees before they enter the deck area. b) Implement and enforce a confined space entry program. This program should include as a minimum the following: 1) A requirement that Gastec Combustible Gas Meters, or other similar testing equipment used to ensure that area was safe for entry be calibrated by a trained, qualified person with a captive test gas of known concentration at intervals not to exceed 30 days or as often as recommended by the equipment manufacturer. 2. Establish an entry permit which records all information related to the work including materials tested for; any sampling results; any isolation measures taken such as lockout, tagout, equipment, and procedures used for purging, inerting, ventilation or flushing; rescue equipment available; communication procedures, personal protective equipment used and a complete evaluation of all hazards to ensure a safe entry. 3. Institute a procedure for the determination of contaminants to be tested for in each confined space entry by a competent person. 4. Establish a periodic schedule for the reevaluation of hazards to ensure that conditions have not changed. 5. Evaluation of the confined space entry program to ensure conformance to American National Standards Institute (ANSI) Z117.1 1989. c) Provide a written start-up procedure for units, assure that employees are trained in these procedures and confirm that super- visors and operators follow these procedures. d) Revise the currently used hot work permit procedure and to update the permit form. The new procedure and permit should include as a minimum the following: 1. Listing of the work and the extent and location of the work area. 2. Listing of an exact description of the equipment involved and the task to be performed. 3. Identify any sampling equipment used to determine that work may proceed in the area and the results obtained from such testing. 4. Require the signature of all employees involved in the approval of the permit. 5. Assure that all employees are thoroughly trained in the procedure. 6. Arrange for a periodic review of the procedure and update it as necessary. 7. Assure that the procedure is fully implemented and enforced. e) Institute an effective program to assure that relieving devices are properly sized, installed, and maintained. 1. Properly size relieving devices in accordance with ASME Boiler & Pressure Vessel Code and API 520 Sizing, Selection, and Installation of Pressure-Relieving Devices in Refineries and API 521 Guide for Pressure-Relieving and De-pressuring systems. 2. Follow the established criteria for inspection and testing of safety relief valves which has been established by the company. 3. Assure integrity of pressure relieving devices by prohibiting operators from hammering on them when they believed that they had failed to reseat and were leaking. 4. Inspect pressure relieving devices to make sure that they discharge to an area which could not be occupied by employees. f) Institute an effective program for the installation, inspection and maintenance of piping, valves and fittings. 1. Ensure that corrosion rates and determination of retirement thickness of piping is performed and [periodic piping inspections are done in accordance with ANSI B31.1 Power Piping, ANSI B31.3 Petroleum Refinery Piping, and API 574 Inspection of Piping, Tubing Valves, and Fittings. 2. Determine the resolution of anomalous data which shows information such as increasing wall thicknesses. 3. Assure that only properly marked studs are obtained. Studs meeting the B7 requirements must be so marked so as to assure that they are not confused with studs that do not meet these requirements. 4. Establish an effective program of quality control to ensure that the proper materials are ordered, received, stored, and installed. 5. Closely inspect all piping systems after work is done and prior to use and accept and place into service only those systems found to be properly installed and assembled. Training of inspectors should assure that they are qualified to make these assessments. g) Evaluate that all necessary instrumentation, controls and alarms are installed and are properly used or provide alternative means to perform the function that the alarms would perform. 1. Install high temperature alarms and fail-safe controls to prevent asphalt from being heated above 350 - 375 degrees Farenheit in the Asphalt Holding Tank #705. 2. Install low level alarms and fail-safe controls on the Asphalt Storage and Holding Tanks to assure that the level of the tanks do not fall to a level so as to allow the gas fired heaters to cause ignition of the remaining asphalt. 3. Record levels of products that are moved into and out of tanks to assure that operators are aware as to the amount that the tanks contain. 4. Prior to transferring product calculate the safe remaining capacity and record this capacity. 5. Assure that all operators are trained in the established operating procedures to control liquid Asphalt levels and temperatures and to assure that operational limits of tank capacity and temperatures are maintained. h) Protect employees in occupied work areas. 1. Design and construct a ventilation system for critical occupancy buildings, so that the air intake would not draw flammable vapors from near by process area should a vapor release occur (such as a positive pressure ventilation system). 2. Install flammable gas detectors immediately downstream of the air intake for critical occupancy buildings which when activated would initiate the shutdown of the air intake system.
Recent events (2)
- — F (S) $5000.00
- — Z (S) $5000.00
5(a)(1)
- Issued
- Mar 23, 1992
- Abate by
- Apr 24, 1992
- Penalty
- Initial $5,000 · Current $5,000
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The %% employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to the hazards of fires and explosions at BP Toledo Refinery under normal operating conditions or as a result of system upset and/or equipment failure. a) BP did not have a fixed monitoring system for hydrocarbons on the M.O.V. deck of Reformer 1. b) BP did not assure that start-up procedures were effective. 1. October 6, 1991, at Reformer 1 a fire occurred due to inadequate start-up procedures in not have introduced flow through the convection section tubes until after the burners had been lit. c) BP did not have an effective and properly implemented hot work permit system for use in flammable and/or potentially hazardous areas. d) BP did not assure that relieving devices were properly sized, installed, maintained and tested. 1) Pressure relieving devices were not assured to be sized for worst case scenarios, i.e. Sat Gas/Naphtha Treater SV #1410, SV #1414, SV #1435, SV #1470, Alky II SV #409, FCC I SV #1272A. 2) Relieving devices were not inspected and tested on a frequent interval as indicated by the BP Safety Relife ValVe Computer Program, i.e. Coker I SV #1213, Crude Vac I SV #1126, North Tank Field (NTF) SV #1993, SV #1998, LPG SV #331. 3) The integrity of pressure relieving devices was not assured by allowing operators to hammer on relieving devices that had relieved and not reseat, i.e. Reformer I area.
Recent events (2)
- — F (S) $5000.00
- — Z (S) $5000.00
5(a)(1)
- Issued
- Mar 23, 1992
- Abate by
- Sep 29, 1992
- Penalty
- Initial $2,500 · Current $2,500
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that Emergency Medical Technician employees have a possibility of being infected by hepatitis B virus and/or HIV through contact with body fluids or blood in emergency situations and were not offered the HBV vaccination: Among other methods, one feasible and acceptable abatement method to correct this hazard is: 1. Inform employees about HBV vacination and make it available to them. 2. Provide employees with medical surveillance programs to include examinations and tests for HIV, HBV, and other infectious diseases. 3. Provide employees with information and training regarding HIV, HBV, and infectious control. 4. Develop written procedures for the prevention of blood borne disease in agreement with the recommendation of the Centers for Disease Control for post exposure follow-up and written procedures on the use of the recapping device when used.
Recent events (2)
- — F (S) $2500.00
- — Z (S) $2500.00
1910.22 A01
- Issued
- Mar 23, 1992
- Abate by
- Apr 7, 1992
- Penalty
- Initial $2,500 · Current $2,000 Reduced
Recent events (2)
- — F (S) $2000.00
- — Z (S) $2500.00
1910.23 C01
- Issued
- Mar 23, 1992
- Abate by
- Apr 24, 1992
- Penalty
- Initial $5,000 · Current $5,000
Recent events (2)
- — F (S) $5000.00
- — Z (S) $5000.00
1910.24 B
- Issued
- Mar 23, 1992
- Abate by
- Apr 24, 1992
- Penalty
- Initial $1,500 · Current $2,000
Recent events (2)
- — F (O) $2000.00
- — Z (S) $1500.00
1910.106 C05
- Issued
- Mar 23, 1992
- Abate by
- Apr 24, 1992
- Penalty
- Initial $2,000 · Current $2,000
Recent events (2)
- — F (S) $2000.00
- — Z (S) $2000.00
1910.120 P08 IVA
- Issued
- Mar 23, 1992
- Abate by
- Apr 24, 1992
- Penalty
- Initial $5,000 · Current $4,000 Reduced
Recent events (2)
- — F (S) $4000.00
- — Z (S) $5000.00
1910.120 Q01
- Issued
- Mar 23, 1992
- Abate by
- Apr 24, 1992
- Penalty
- Initial $5,000 · Current $5,000
Recent events (2)
- — F (S) $5000.00
- — Z (S) $5000.00
1910.120 Q02 II
- Issued
- Mar 23, 1992
- Abate by
- Apr 24, 1992
- Penalty
- Initial $5,000 · Current $5,000
Recent events (2)
- — F (S) $5000.00
- — Z (S) $5000.00
1910.120 Q02 III
- Issued
- Mar 23, 1992
- Abate by
- Apr 24, 1992
- Penalty
- Initial $2,500 · Current $2,500
Recent events (2)
- — F (S) $2500.00
- — Z (S) $2500.00
1910.120 Q02 V
- Issued
- Mar 23, 1992
- Abate by
- Apr 24, 1992
- Penalty
- Initial $5,000 · Current $5,000
Recent events (2)
- — F (S) $5000.00
- — Z (S) $5000.00
1910.120 Q02 VI
- Issued
- Mar 23, 1992
- Abate by
- Apr 24, 1992
- Penalty
- Initial $5,000 · Current $5,000
Recent events (2)
- — F (S) $5000.00
- — Z (S) $5000.00
1910.120 Q02 VII
- Issued
- Mar 23, 1992
- Abate by
- Apr 24, 1992
- Penalty
- Initial $5,000 · Current $5,000
Recent events (2)
- — F (S) $5000.00
- — Z (S) $5000.00
1910.120 Q02 XI
- Issued
- Mar 23, 1992
- Abate by
- Apr 24, 1992
- Penalty
- Initial $2,500 · Current $2,500
1910.132 A
- Issued
- Mar 23, 1992
- Abate by
- Apr 24, 1992
- Penalty
- Initial $5,000 · Current $4,000 Reduced
Recent events (2)
- — F (S) $4000.00
- — Z (S) $5000.00
1910.133 A01
- Issued
- Mar 23, 1992
- Abate by
- Mar 25, 1992
- Penalty
- Initial $1,500 · Current $1,500
Recent events (2)
- — F (S) $1500.00
- — Z (S) $1500.00
1910.133 A02 I
- Issued
- Mar 23, 1992
- Abate by
- Mar 27, 1992
- Penalty
- Initial $2,500 · Current $2,500
Recent events (2)
- — F (S) $2500.00
- — Z (S) $2500.00
1910.134 A02
- Issued
- Mar 23, 1992
- Abate by
- Apr 24, 1992
- Penalty
- Initial $5,000 · Current $4,000 Reduced
Recent events (2)
- — F (S) $4000.00
- — Z (S) $5000.00
1910.134 E03 I
- Issued
- Mar 23, 1992
- Abate by
- Mar 27, 1992
- Penalty
- Initial $5,000 · Current $4,000 Reduced
Recent events (2)
- — F (S) $4000.00
- — Z (S) $5000.00
1910.134 E04
- Issued
- Mar 23, 1992
- Abate by
- Mar 27, 1992
- Penalty
- Initial $5,000 · Current $4,000 Reduced
Recent events (2)
- — F (S) $4000.00
- — Z (S) $5000.00
1910.134 F02 II
- Issued
- Mar 23, 1992
- Abate by
- Mar 27, 1992
Recent events (2)
- — F (S)
- — Z (S)
1910.134 F05 I
- Issued
- Mar 23, 1992
- Abate by
- Mar 27, 1992
Recent events (2)
- — F (S)
- — Z (S)
1910.141 B02 III
- Issued
- Mar 23, 1992
- Abate by
- May 28, 1992
- Penalty
- Initial $2,500 · Current $2,500
Recent events (2)
- — F (O) $2500.00
- — Z (S) $2500.00
1910.151 C
- Issued
- Mar 23, 1992
- Abate by
- Apr 24, 1992
- Penalty
- Initial $5,000 · Current $4,000 Reduced
Recent events (2)
- — F (S) $4000.00
- — Z (S) $5000.00
1910.156 C02
- Issued
- Mar 23, 1992
- Abate by
- May 26, 1992
- Penalty
- Initial $5,000 · Current $4,000 Reduced
Recent events (2)
- — F (S) $4000.00
- — Z (S) $5000.00
1910.160 B02
- Issued
- Mar 23, 1992
- Abate by
- Mar 25, 1992
- Penalty
- Initial $5,000 · Current $4,000 Reduced
Recent events (2)
- — F (S) $4000.00
- — Z (S) $5000.00
1910.253 B02 II
- Issued
- Mar 23, 1992
- Abate by
- Mar 27, 1992
- Penalty
- Initial $2,500 · Current $2,500
Recent events (2)
- — F (O) $2500.00
- — Z (S) $2500.00
1910.303 G02 I
- Issued
- Mar 23, 1992
- Abate by
- Mar 31, 1992
- Penalty
- Initial $5,000 · Current $4,000 Reduced
Recent events (2)
- — F (S) $4000.00
- — Z (S) $5000.00
1910.303 H02 I
- Issued
- Mar 23, 1992
- Abate by
- Mar 27, 1992
- Penalty
- Initial $5,000 · Current $4,000 Reduced
Recent events (2)
- — F (S) $4000.00
- — Z (S) $5000.00
1910.307 B
- Issued
- Mar 23, 1992
- Abate by
- Mar 31, 1992
- Penalty
- Initial $5,000 · Current $4,000 Reduced
Recent events (2)
- — F (S) $4000.00
- — Z (S) $5000.00
1910.307 C
- Issued
- Mar 23, 1992
- Abate by
- Mar 31, 1992
- Penalty
- Initial $2,500 · Current $2,500
Recent events (2)
- — F (S) $2500.00
- — Z (S) $2500.00
1910.333 C02
- Issued
- Mar 23, 1992
- Abate by
- Mar 27, 1992
- Penalty
- Initial $5,000 · Current $2,000 Reduced
Recent events (2)
- — F (S) $2000.00
- — Z (S) $5000.00
1910.1028 E07 I
- Issued
- Mar 23, 1992
- Abate by
- Mar 24, 1992
- Penalty
- Initial $2,000 · Current $2,000
Recent events (2)
- — F (S) $2000.00
- — Z (S) $2000.00
1910.1200 F05 I
- Issued
- Mar 23, 1992
- Abate by
- Apr 24, 1992
- Penalty
- Initial $1,500 · Current $1,500
Recent events (2)
- — F (O) $1500.00
- — Z (S) $1500.00
1910.1200 F05 II
- Issued
- Mar 23, 1992
- Abate by
- Apr 24, 1992
Recent events (2)
- — F (O)
- — Z (S)
1910.1200 F09
- Issued
- Mar 23, 1992
- Abate by
- Mar 27, 1992
- Penalty
- Initial $1,500 · Current $1,000 Reduced
Recent events (2)
- — F (S) $1000.00
- — Z (S) $1500.00
1910.1200 F05 I
- Issued
- Mar 23, 1992
- Abate by
- Apr 24, 1992
- Penalty
- Initial $1,500 · Current $2,500
Recent events (2)
- — F (S) $2500.00
- — Z (S) $1500.00
1910.1200 F05 II
- Issued
- Mar 23, 1992
- Abate by
- Apr 24, 1992
Recent events (2)
- — F (S)
- — Z (S)
1910.120 Q01
- Issued
- Mar 23, 1992
- Abate by
- Mar 26, 1992
- Penalty
- Initial $4,000 · Current $4,000
Recent events (2)
- — F (S) $4000.00
- — Z (S) $4000.00
1910.120 Q02 II
- Issued
- Mar 23, 1992
- Abate by
- Mar 26, 1992
Recent events (2)
- — F (S)
- — Z (S)
1910.120 Q02 V
- Issued
- Mar 23, 1992
- Abate by
- Mar 26, 1992
Recent events (2)
- — F (S)
- — Z (S)
1910.120 Q02 VI
- Issued
- Mar 23, 1992
- Abate by
- Mar 26, 1992
Recent events (2)
- — F (S)
- — Z (S)
1910.120 Q02 VII
- Issued
- Mar 23, 1992
- Abate by
- Mar 26, 1992
Recent events (2)
- — F (S)
- — Z (S)
1910.120 Q02 III
- Issued
- Mar 23, 1992
- Abate by
- Mar 26, 1992
- Penalty
- Initial $5,000 · Current $5,000
Recent events (2)
- — F (S) $5000.00
- — Z (S) $5000.00
1910.120 Q02 XI
- Issued
- Mar 23, 1992
- Abate by
- Mar 26, 1992
Recent events (2)
- — F (S)
- — Z (S)
5(a)(1)
- Issued
- Mar 23, 1992
- Abate by
- Mar 31, 1992
- Penalty
- Initial $35,000 · Current $35,000
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to: Employees were exposed to death or dismemberment from the 3200 p.s.i. water spray cutting and boring nozzles of the coke cutting stem. This was due to the bypassing of the upper limit switch which served to prevent the operation of the water when the head was withdrawn out of the top of the drum at coker 1. The lack of a shut off switch for the water at the west coker drum in coker 1 increased the hazard. Among other methods, one feasible and acceptable abatement method to correct this hazard include, but not necessarily limited to the following: 1) Repair use and maintain in continued operation the upper limit switch so as to prevent water pressure at the cutting head when the head is withdrawn out of the top of the coke drum. 2) Install water shut off at the control positionfor the west coker drum cutting head in coker 1.
Recent events (2)
- — F (U) $35000.00
- — Z (W) $35000.00
5(a)(1)
- Issued
- Mar 23, 1992
- Abate by
- Jun 26, 1992
- Penalty
- Initial $70,000 · Current $56,000 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to the hazard of burns, broken bones, crushing injuries, and/or death at BP Toledo Refinery as a result of system upset and/or equipment failure. BP did not establish an effective program of pressure vessel were not performed. Corrosion rates were not calculated to determine inspection intervals, i.e. PR #1949 Recirculation Dry Drum and other Reformer I vessels. a) Frequent inspections of pressure vessels were not performed. Corrosion rates were not calculated to determine inspection intervals, i.e. PR #1949 Recirculation Dry Drum and other Reformer I vessels. b) Inspection points for nondestructive test methods on pressure vessels were not extablished, i.e. as indicated by the inspection log for the Reformer I vessels. c) U1 reports were not maintained and each pressure vessel did not have a nameplate or the nameplate was not readable, i.e. Reformer I vessels such as PR #1126 Feed Surge drum, PR #1135 Debutinizer Reflux drum. d) Anamolous thickness data, such as increasing wall thickness measurements, was not resolved, i.e. as indicated by the inspection log for Reformer I vessels. A feasible and useful method of correcting these hazards include but is not limited to the following: Establish an effective program of pressure vessel inspections including but not limited to: 1) Ensure that determination of probable corrosion rate and specification of maximum period between inspections performed in accordance with ASME Boiler & Pressure Vessel Code and ANSI/National Board Inspection Code and API 510 Pressure Vessel Inspection Code. 2) Determine and use of inspection points for non-destructive testing. 3) Ensure that each pressure vessel is provided with an original U1 report and readable nameplate in accordance with ASME Boiler & Pressure Vessel Code. 4) The reconciliation of anomalous thickness data which reported increase in wall thickness.
Recent events (2)
- — F (U) $56000.00
- — Z (W) $70000.00
1910.147 C05 IID
- Issued
- Mar 23, 1992
- Abate by
- Mar 31, 1992
- Penalty
- Initial $24,500 · Current $24,000 Reduced
Recent events (2)
- — F (U) $24000.00
- — Z (W) $24500.00
1910.147 C06 I
- Issued
- Mar 23, 1992
- Abate by
- Apr 24, 1992
- Penalty
- Initial $35,000 · Current $35,000
Recent events (2)
- — F (U) $35000.00
- — Z (W) $35000.00
1910.147 C06 IC
- Issued
- Mar 23, 1992
- Abate by
- Mar 27, 1992
Recent events (2)
- — F (W)
- — Z (W)
1910.147 D03
- Issued
- Mar 23, 1992
- Abate by
- Mar 27, 1992
- Penalty
- Initial $70,000 · Current $70,000
Recent events (2)
- — F (W) $70000.00
- — Z (W) $70000.00
1910.147 D06
- Issued
- Mar 23, 1992
- Abate by
- Mar 27, 1992
- Penalty
- Initial $70,000 · Current $70,000
Recent events (2)
- — F (W) $70000.00
- — Z (W) $70000.00
1910.307 B
- Issued
- Mar 23, 1992
- Abate by
- Apr 24, 1992
- Penalty
- Initial $35,000 · Current $35,000
Recent events (2)
- — F (U) $35000.00
- — Z (W) $35000.00
1910.147 D03
- Issued
- Mar 23, 1992
- Abate by
- Mar 26, 1992
- Penalty
- Initial $70,000 · Current $70,000
Recent events (2)
- — F (U) $70000.00
- — Z (U) $70000.00
1910.307 B
- Issued
- Mar 23, 1992
- Abate by
- Mar 26, 1992
Recent events (2)
- — F (U)
- — Z (U)
5(a)(1)
- Issued
- Mar 20, 1992
- Abate by
- Apr 1, 1992
- Penalty
- Initial $50,000 · Current $50,000
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to; The operators, maintenance employees, and outside contractor employees were exposed to burns and possible death in that: The employer did not take adquate measures to prevent a hazardous rlease of flammable, toxic, or hot materials while employees were opening, repairing, removing, or replacing lines or equipment that were part of the process unit's lines that were under pressure or could become pressurized. Among othe methods, oen feasible and acceptable method to correct this hazard is to implement and enforce a written line breaking and system opening procedure. Essential elements of this procedure include, but are not nexessarily limited to the following: Establish and use a document work order permit (line opening permit) system which requires a supervisor's or operator's approval to reactivate any process line upon completion of work. The issuance of the work order permit shall be limited to the supervisor or operator of the area who is completely familiar with the system and who has verified the proper line to be opened and that all steps possible have been taken to drain and vent the line and any connected pumps, valves, and tanks. All pumps on the line shall be locked out and blanked. 2) The personal assigned to the work shall be properly equipped and clothed with protective equipment as if the line were going to vent or spray when opened. The adjacent area shall be enclosed with a barrier rope and signs to exclude personnel not involved in the operation. 3) The procedures for actually breaking the line shall be reviewed with the persons who will do work. Employees shall place a deflector or suitable material over the flange joint for initial breaking or lines carrying corrosive or toxic material. adjacent nuts and bolts to be loosened. 4) Emergency equipment and materials shall be checked and available in the immediate area. Safety showeres, hose lines, fire extinguishers, neutralizers, or other emergency materials shall be on hand and ready for use. 5) Prior to breaking the line determine the pressures and temperatures in the line to be broken and take precautions to reduce or eliminate any conditions which could increase the hazard. 6) The removed pipe sections, valves, or parts shall be handled carefully until they are inspected for trapped materials on residue. Lines that have caked residue that cannot be cleaned immediately shall be tagged with warnings identifying the contamination until they can be properly decontaminated.
Recent events (2)
- — F (W) $50000.00
- — Z (W) $50000.00
More inspections at B. P. Amoco PLC
View B. P. Amoco PLC's full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in OH
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 103062634.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.