SKOKIE, IL ·
OSHA Inspection: NEW PROCESS TANK SYSTEMS
Follow-up inspection · Health discipline
At a glance
On , OSHA opened a follow-up health inspection of NEW PROCESS TANK SYSTEMS in 7800 NORTH LINCOLN AVENUE, SKOKIE, IL 60077 (NAICS 000000). OSHA activity number 103074761.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- NEW PROCESS TANK SYSTEMS
- Site address
- 7800 NORTH LINCOLN AVENUE
- City
- SKOKIE
- State
- IL
- ZIP
- 60077
- Mailing
- 742 NORTH YALE, VILLA PARK, IL 60181
What kind of inspection was it?
- Inspection type
- Follow-up (F)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- Non-union (N)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 1799
- Employees
- 1
- Ownership type
- Private (A)
Citations
32 citations on file for this inspection.
1910.94 A05 I
- Issued
- Nov 26, 1991
- Abate by
- Dec 9, 1991
- Penalty
- Initial $2,000 · Current $50 Reduced
Recent events (2)
- · F (S) $50.00
- · Z (S) $2000.00
1926.59 E01
- Issued
- Nov 26, 1991
- Abate by
- Dec 9, 1991
- Penalty
- Initial $2,000 · Current $50 Reduced
Recent events (2)
- · F (S) $50.00
- · Z (S) $2000.00
1926.59 E01 II
- Issued
- Nov 26, 1991
- Abate by
- Dec 9, 1991
Recent events (2)
- · F (S)
- · Z (S)
1926.59 E02 I
- Issued
- Nov 26, 1991
- Abate by
- Dec 9, 1991
Recent events (2)
- · F (S)
- · Z (S)
1926.59 E02 II
- Issued
- Nov 26, 1991
- Abate by
- Dec 9, 1991
Recent events (2)
- · F (S)
- · Z (S)
1926.59 E02 III
- Issued
- Nov 26, 1991
- Abate by
- Dec 9, 1991
Recent events (2)
- · F (S)
- · Z (S)
1926.59 E01
- Issued
- Nov 26, 1991
- Abate by
- Dec 9, 1991
- Penalty
- Initial $2,000 · Current $50 Reduced
Recent events (2)
- · F (S) $50.00
- · Z (S) $2000.00
1926.59 F05 I
- Issued
- Nov 26, 1991
- Abate by
- Dec 9, 1991
Recent events (2)
- · F (S)
- · Z (S)
1926.59 F05 II
- Issued
- Nov 26, 1991
- Abate by
- Dec 9, 1991
Recent events (2)
- · F (S)
- · Z (S)
1926.150 C01 VIII
- Issued
- Nov 26, 1991
- Abate by
- Dec 9, 1991
- Penalty
- Initial $2,000 · Current $50 Reduced
Recent events (2)
- · F (S) $50.00
- · Z (S) $2000.00
1926.152 E02
- Issued
- Nov 26, 1991
- Abate by
- Dec 9, 1991
- Penalty
- Initial $2,000 · Current $50 Reduced
Recent events (2)
- · F (S) $50.00
- · Z (S) $2000.00
1926.152 F02
- Issued
- Nov 26, 1991
- Abate by
- Dec 16, 1991
- Penalty
- Initial $2,000 · Current $50 Reduced
Recent events (2)
- · F (S) $50.00
- · Z (S) $2000.00
5(a)(1)
- Issued
- Nov 26, 1991
- Abate by
- Dec 3, 1991
- Penalty
- Initial $14,000 · Current $600 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The %% employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to: (a) Lincoln and Milford Service Station, 7800 N. Lincoln, Skokie - On August 16, 1991, employee(s) entered a confined space, 10,000 gallon underground fuel storage tank, to perform relining of the interior surfaces with a styrene/methyl ethyl ketone peroxide/acetone based polyester resin (flash point = 73 F). During the spraying operation used in the relining of the tank, explosive and/or toxic atmosphere(s) immediately dangerous to life and health were created within the tank. A confined space entry procedure has been developed for worker use but was not implemented or enforced at the site. A confined space entry procedure shall be implemented and enforeced which is specific for the worker exposures to confined space hazards specific for the cleaning, sludging and relining operations performed. Procedures shall follow ANSI Z117.1-1989 and shall include at least the following: (1) Written procedures covering a permit system, ventilation, atmosphereic testing, rescue procedures, employee training, designation of a qualified person for standby and emergency procedures. (2) The completion and posting of a confined space entry permit which requires authorization and approval in writing that specifies the loction and type of work to be done and certifies that all exiting hazards have been evaluated by a qualified person and the necessary protective measures have been taken to ensure the safety of each worker. (3) Mechanical ventilation of the confined space prior to entry and continued ventilation of the space operations to provide a safe atmosphere. (4) Testing the atmosphere of the confined space prior to entry and on a regular basis for presence of sufficient oxygen (19.5%) and absence of hazardous levels of toxic or combustible gases or vapors. (5) Emergency procedures with requirements that trained per- sonnel are available and are stationed outside the confined space with proper equipment to provide for the rescue of persons entering the space. Such equipment must include safety harness or lifelines with provisions for hoisting employees from the confined space. If entry is required for rescue, the rescuing employee must be equipped with approved air supplied/self- contained breathing apparatus or other appropriate respiratory protection and other appropriate personal protective equipment. (6) Training shall be provided to all employees required to enter the confined space or assist in rescue/emergency ac- tivities. The training shall include the procedures required prior to entry and the hazards associated with work in the confined space, use of protective testing and rescue equipment.
Recent events (2)
- · F (W) $600.00
- · Z (W) $14000.00
1910.134 E03 I
- Issued
- Nov 26, 1991
- Abate by
- Dec 9, 1991
Recent events (2)
- · F (W)
- · Z (W)
1910.134 B11
- Issued
- Nov 26, 1991
- Abate by
- Dec 9, 1991
Recent events (2)
- · F (W)
- · Z (W)
1910.134 E03 III
- Issued
- Nov 26, 1991
- Abate by
- Dec 9, 1991
Recent events (2)
- · F (W)
- · Z (W)
1926.103 C01
- Issued
- Nov 26, 1991
- Abate by
- Dec 9, 1991
Recent events (2)
- · F (W)
- · Z (W)
1910.134 A02
- Issued
- Nov 26, 1991
- Abate by
- Dec 9, 1991
- Penalty
- Initial $14,000 · Current $400 Reduced
Recent events (2)
- · F (W) $400.00
- · Z (W) $14000.00
1910.134 E03
- Issued
- Nov 26, 1991
- Abate by
- Dec 9, 1991
Recent events (2)
- · F (W)
- · Z (W)
1926.28 A
- Issued
- Nov 26, 1991
- Abate by
- Dec 9, 1991
- Penalty
- Initial $14,000 · Current $400 Reduced
Recent events (2)
- · F (W) $400.00
- · Z (W) $14000.00
1926.103 A01
- Issued
- Nov 26, 1991
- Abate by
- Dec 9, 1991
- Penalty
- Initial $14,000 · Current $400 Reduced
Recent events (2)
- · F (W) $400.00
- · Z (W) $14000.00
1926.55 A
- Issued
- Nov 26, 1991
- Abate by
- Jan 2, 1992
2280
Recent events (2)
- · F (W)
- · Z (W)
1926.55 B
- Issued
- Nov 26, 1991
- Abate by
- Jan 2, 1992
2280
Recent events (2)
- · F (W)
- · Z (W)
1910.134 F02
- Issued
- Nov 26, 1991
- Abate by
- Dec 9, 1991
- Penalty
- Initial $4,000 · Current $100 Reduced
Recent events (2)
- · F (R) $100.00
- · Z (R) $4000.00
1910.134 F02 I
- Issued
- Nov 26, 1991
- Abate by
- Dec 9, 1991
Recent events (2)
- · F (R)
- · Z (R)
1926.102 A01
- Issued
- Nov 26, 1991
- Abate by
- Dec 2, 1991
- Penalty
- Initial $2,800 · Current $100 Reduced
Recent events (2)
- · F (R) $100.00
- · Z (R) $2800.00
1926.407 B
- Issued
- Nov 26, 1991
- Abate by
- Dec 16, 1991
- Penalty
- Initial $4,000 · Current $100 Reduced
Recent events (2)
- · F (R) $100.00
- · Z (R) $4000.00
1926.1052 C01
- Issued
- Nov 26, 1991
- Abate by
- Dec 16, 1991
- Penalty
- Initial $1,600 · Current $100 Reduced
Recent events (2)
- · F (R) $100.00
- · Z (R) $1600.00
1926.1052 B03
- Issued
- Nov 26, 1991
- Abate by
- Dec 16, 1991
Recent events (2)
- · F (R)
- · Z (R)
1903.2 A01
- Issued
- Nov 26, 1991
- Abate by
- Nov 30, 1991
- Penalty
- Initial $400
Recent events (2)
- · F (O)
- · Z (O) $400.00
1926.403 G
- Issued
- Nov 26, 1991
- Abate by
- Dec 9, 1991
Recent events (2)
- · F (O)
- · Z (O)
1926.403 H
- Issued
- Nov 26, 1991
- Abate by
- Dec 9, 1991
Recent events (2)
- · F (O)
- · Z (O)
More inspections at NEW Process Tank Systems
View NEW Process Tank Systems's full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in IL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 103074761.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.