OSHA Inspection: LEBLANC LTD.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of LEBLANC LTD. in 1906 HIGHLAND AVENUE, CINCINNATI, OH 45219 (NAICS 000000). OSHA activity number 103230207.

Watch Leblanc LTD. — free Get an email when a new federal OSHA severe-injury report for Leblanc LTD. is published. One employer, no account, unsubscribe in one click.
Establishment
LEBLANC LTD.
Site address
1906 HIGHLAND AVENUE
City
CINCINNATI
State
OH
ZIP
45219
Mailing
461 CORNWALL ROAD P.O BOX 880, OAKVILLE, ON CANADA L6J5C5, FN 99999
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Data loaded
NAICS code
000000
SIC code (legacy)
1791
Employees
150
Ownership type
A
Industry flags
Construction safety.

3 citations on file for this inspection.

5(a)(1)

Serious Gravity 10 8 instances 4 exposed
Issued
Abate by
Penalty
Initial $3500.00 · Current $2800.00 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not
furnish employment and a place of employment which were free from
recognized hazards that
were causing or likely to cause death or serious physical harm to
employees in that employees
were exposed to the hazard of falls while accessing and performing work on
a
telecommunication tower in that:
a)On or about March 22, 2000, and prior to that date, employees were
transported
to elevated work locations by use of a personnel basket and a trial lift
with the
unoccupied personnel platform loaded at least to the anticipated lift
weight, from
ground level, or any other location where employees will enter the
platform to
each location at which the personnel platform is to be hoisted and
positioned. This
trial lift was not performed immediately prior to placing personnel on the
platform in that the hoist operator did not determine that all systems,
controls and
safety devices are activated and functioning properly; that no
interferences exist;
and that all configurations necessary to reach those work locations will
would
allow the operator to remain under the 50 percent limit of the hoist's
rated
capacity.
b)On or about March 22, 2000, and prior to that date, employees were
transported
to elevated work locations by use of a personnel basket operated from a
base
mounted drum hoist without a pre-lift meeting conducted/attended by the
hoist
operator, signal person(s), employee(s) to be lifted, and the person
responsible
for the task to be performed to review the appropriate requirements for
lifting
personnel and the procedures to be followed; prior to the trial lift.
One means of abatement among others, is to:
a)Assure safe work practices identified in CPL 2-1.29, Interim Inspection
Procedures During Communication Tower Construction Activities, 01/15/1999,
are complied with at all times;
(1)Conduct a pre-lift meeting attended by the hoist operator, signal
person(s), and employees to be lifted;
(2)Conduct a trial lift prior to lifting personnel to determine all
systems controls and safety devices are functioning properly.ng
Recent events (2)
  • — I (S) $2800.00
  • — Z (S) $3500.00

1926.20 B02

Other-than-serious Gravity 10 4 instances 5 exposed
Issued
Abate by
Penalty
Initial $3500.00 · Current $700.00 Reduced
Recent events (2)
  • — I (O) $700.00
  • — Z (S) $3500.00

1926.553 A04

Serious Gravity 10 3 instances 5 exposed
Issued
Abate by
Penalty
Initial $3500.00 · Current $2000.00 Reduced
Recent events (2)
  • — I (S) $2000.00
  • — Z (S) $3500.00

KGC, INC.

KENWORTH

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 103230207.