MARSEILLES, IL ·
OSHA Inspection: GENERAL RAILROAD EQUIPMENT & SERVICES, INCOR.
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of GENERAL RAILROAD EQUIPMENT & SERVICES, INCOR. in PDM ROAD & CANAL ROAD, MARSEILLES, IL 61341 (NAICS 000000). OSHA activity number 103365144.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- GENERAL RAILROAD EQUIPMENT & SERVICES, INCOR.
- Site address
- PDM ROAD & CANAL ROAD
- City
- MARSEILLES
- State
- IL
- ZIP
- 61341
- Mailing
- P. O. BOX 210, MARSEILLES, IL 61341
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Union (A)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 3443
- Employees
- 170
- Ownership type
- Private (A)
- Industry flags
- Manufacturing safety.
Citations
40 citations on file for this inspection.
1910.304 F04
- Issued
- Sep 7, 1989
- Abate by
- Sep 29, 1989
- Penalty
- Initial $600 · Current $500 Reduced
Recent events (2)
- · I (S) $500.00
- · Z (S) $600.00
1910.179 N03 VI
- Issued
- Aug 19, 1989
- Abate by
- Sep 18, 1989
- Penalty
- Initial $700 · Current $500 Reduced
Recent events (2)
- · I (S) $500.00
- · Z (S) $700.00
1910.179 N02 II
- Issued
- Aug 19, 1989
- Abate by
- Oct 4, 1989
- Penalty
- Initial $800 · Current $800
Recent events (2)
- · I (S) $800.00
- · Z (S) $800.00
1910.184 E04
- Issued
- Aug 19, 1989
- Abate by
- Sep 4, 1989
Recent events (2)
- · I (S)
- · Z (S)
1910.212 A03 II
- Issued
- Aug 19, 1989
- Abate by
- Oct 23, 1989
- Penalty
- Initial $800 · Current $800
Recent events (2)
- · I (S) $800.00
- · Z (S) $800.00
1910.212 A05
- Issued
- Aug 19, 1989
- Abate by
- Sep 7, 1989
- Penalty
- Initial $300 · Current $300
5(a)(1)
- Issued
- Aug 18, 1989
- Abate by
- Sep 7, 1989
- Penalty
- Initial $1,000 · Current $1,000
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to severe burns, asphyxiation, concussions, multiple traumatic injuries and/or death from the increased likelihood of fire, explosion, and/or uncontrolled release of natural gas due to improperly manufactured, supported, constructed and/or maintained natural gas heaters and supply lines. Specific deficiencies noted at the time of the inspection included: a) In the Fabrication Department, near the Do-All metal cutting band saw, an unapproved shop-made natural gas heater with an unregulated gas torch and crude sheet metal enclosure. b) In the Fabrication Department, near the "Koick" burning table, an unapproved shop-made natural gas heater with an unregulated gas torch and a crude sheet metal enclosure. c) The following natural gas-fired radiant heaters were hanging from unsecured and unstable pipe or angle iron stands by means of bits of wire or chain at heights of 1 to 4 feet above the plant floor. 1) 900 Fixture Station, East Aisle. 2) Sub-Assembly Area, Southwest Corner. 3) Corner post, 603-604-605 Area. 4) Beam-Cutting Area. 5) Fit-Up Pontoon Area, Northeast Aisle. 6) 545 Weld-Out Station. d) The following natural gas infrared heaters were subject to being struck by pedestrians, cranes lifting and moving sub-assemblies, and forklift trucks due to their location immediately adjacent to aisleways: 1) Ray-Tec Infrared Space Heater, 900 Fixture Station. 2) Ray-Tec Infrared Space Heater, Sub-Assembly Area. 3) Ray-Tec Infrared Space Heater, Corner of Station 603-604-605. 4) Ray-Tec-Infrared Space Heater, Beam-Cutting Area. 5) Ray-Tec Infrared Space Heater, Fit-Up Pontoon Area. 6) Ray-Tec Infrered Space Heater, 545 Weld-Out Station. e) The following flexible hose connectors, supplying natural gas from column-mounted manifold piping outlets to floor-mounted radiant gas heaters, were subject to physical damage as they were lying in and on the aisle floors; lying on walking and working surface of work stations; coiled around and tangled with 125-volt electric extensions control and equipment supply cords; arc welding lead and ground cables; 480 volt, 3 phase electric supply cables for numerous welding machines; high-pressure hydraulic hoses; sharp-edged steel plates; scrap, tools, and misc. debris: 1) 900 Fixture Station, East Aisle. 2) Sub-Assembly Area, Southwest Corner. 3) Corner Post, 603-604-605 Area. 4) Beam-Cutting Area. 5) Fit-Up Pontoon Area, Northeast Aisle. 6) 545 Weld-Out Station. Among other methods, one feasible and acceptable method to correct this hazard is to assure all natural gas-fired heaters and supply lines are designed, manufactured, constructed, and maintained in accordance with the requirements contained in ANSI/NFPA Z233.1-1988, The Natural fuel Gas Code. Essential elements include, but are not necessarily limited to, the following: 1) Assure that all gas appliances, gas utilization equipment, and accessories are approved by a nationally-recognized testing laboratory, as stipulated in Part 5, Paragraph 5.11 of the National Fuel Gas Code. 1) 900 Fixture Station, East Aisle. 2) Sub-Assembly Area, Southwest Corner. 3) Corner Post, 603-604-605 Area. 4) Beam-Cutting Area. 5) Fit-Up Pontoon Area, Northeast Aisle. 6) 545 Weld-Out Station. Among other methods, one feasible and acceptable method to correct this hazard is to assure all natural gas-fired heaters and supply lines are designed, manufactured, constructed, and maintained in accordance with the requirements contained in ANSI/NFPA Z233.1-1988, The Natural fuel Gas Code. Essential elements include, but are not necessarily limited to, the following: 1) Assure that all gas appliances, gas utilization equipment, and accessories are approved by a nationally-recognized testing laboratory, as stipulated in Part 5, Paragraph 5.11 of the National Fuel Gas Code. 2) Suspended-type infrared heaters shall be safely and adequately fixed in position independent of gas and electric supply lines, as stipulated in part 6.18.1 of the National Fuel Gas Code. 3) Suitable guards of bumber plates shall be installed to protect the equipment from damage when it is necessary to locate gas utilization equipment close to passagewys traveled by trucks or cranes, as stipulated in Part 5, Paragraph 5.1.13 of the National Fire Gas Code. 4) Protect flexible gas connectors against thermal or physical damage, as stipulated in Part 5, Paragraph 5.5.3.d of the National Fire Gas Code.
1910.22 A01
- Issued
- Aug 18, 1989
- Abate by
- Sep 22, 1989
- Penalty
- Initial $600 · Current $600
Recent events (2)
- · I (S) $600.00
- · Z (S) $600.00
1910.22 B01
- Issued
- Aug 18, 1989
- Abate by
- Sep 25, 1989
- Penalty
- Initial $700 · Current $500 Reduced
Recent events (2)
- · I (S) $500.00
- · Z (S) $700.00
1910.132 A
- Issued
- Aug 18, 1989
- Abate by
- Oct 9, 1989
- Penalty
- Initial $500 · Current $250 Reduced
Recent events (2)
- · I (S) $250.00
- · Z (S) $500.00
1910.252 E03 I
- Issued
- Aug 18, 1989
- Abate by
- Oct 23, 1989
Recent events (2)
- · I (S)
- · Z (S)
1910.178 M12
- Issued
- Aug 18, 1989
- Abate by
- Aug 23, 1989
- Penalty
- Initial $800 · Current $400 Reduced
Recent events (2)
- · I (S) $400.00
- · Z (S) $800.00
1910.178 P01
- Issued
- Aug 18, 1989
- Abate by
- Aug 23, 1989
- Penalty
- Initial $500 · Current $250 Reduced
Recent events (2)
- · I (S) $250.00
- · Z (S) $500.00
1910.179 B04
- Issued
- Aug 18, 1989
- Abate by
- Sep 18, 1989
- Penalty
- Initial $600 · Current $600
Recent events (2)
- · I (S) $600.00
- · Z (S) $600.00
1910.179 B04
- Issued
- Aug 18, 1989
- Abate by
- Jan 8, 1990
- Penalty
- Current $300
Recent events (3)
- · P (S) $300.00
- · I (S) $300.00
- · Z (S)
1910.179 J03
- Issued
- Aug 18, 1989
- Abate by
- Oct 23, 1989
- Penalty
- Initial $800 · Current $800
Recent events (2)
- · I (S) $800.00
- · Z (S) $800.00
1910.179 J02 III
- Issued
- Aug 18, 1989
- Abate by
- Nov 27, 1989
Recent events (3)
- · P (S)
- · I (S)
- · Z (S)
1910.179 L02 I
- Issued
- Aug 18, 1989
- Abate by
- Aug 21, 1989
1910.179 M01
- Issued
- Aug 18, 1989
- Abate by
- Oct 30, 1989
Recent events (2)
- · I (S)
- · Z (S)
1910.252 A05 IIIA
- Issued
- Aug 18, 1989
- Abate by
- Aug 25, 1989
- Penalty
- Initial $500 · Current $500
1910.252 B04 VII
- Issued
- Aug 18, 1989
- Abate by
- Oct 16, 1989
- Penalty
- Initial $400 · Current $300 Reduced
Recent events (2)
- · I (S) $300.00
- · Z (S) $400.00
1910.252 E01 I
- Issued
- Aug 18, 1989
- Abate by
- Sep 29, 1989
- Penalty
- Initial $800 · Current $800
Recent events (2)
- · I (S) $800.00
- · Z (S) $800.00
1910.252 E02 IA
- Issued
- Aug 18, 1989
- Abate by
- Sep 7, 1989
1910.303 F
- Issued
- Aug 18, 1989
- Abate by
- Sep 4, 1989
- Penalty
- Initial $800 · Current $600 Reduced
Recent events (2)
- · I (S) $600.00
- · Z (S) $800.00
1910.305 G01 I
- Issued
- Aug 18, 1989
- Abate by
- Nov 27, 1989
Recent events (3)
- · P (S)
- · I (S)
- · Z (S)
1910.305 G01 II
- Issued
- Aug 18, 1989
- Abate by
- Nov 27, 1989
Recent events (3)
- · P (S)
- · I (S)
- · Z (S)
1910.305 G01 II
- Issued
- Aug 18, 1989
- Abate by
- Nov 27, 1989
Recent events (3)
- · P (S)
- · I (S)
- · Z (S)
1910.305 G01 III
- Issued
- Aug 18, 1989
- Abate by
- Nov 27, 1989
Recent events (3)
- · P (S)
- · I (S)
- · Z (S)
1910.305 B01
- Issued
- Aug 18, 1989
- Abate by
- Aug 25, 1989
- Penalty
- Initial $600 · Current $400 Reduced
Recent events (2)
- · I (S) $400.00
- · Z (S) $600.00
1918.37 B
- Issued
- Aug 18, 1989
- Abate by
- Aug 25, 1989
- Penalty
- Initial $800 · Current $500 Reduced
Recent events (2)
- · I (S) $500.00
- · Z (S) $800.00
1918.96 E
- Issued
- Aug 18, 1989
- Abate by
- Aug 25, 1989
1918.106 C
- Issued
- Aug 18, 1989
- Abate by
- Aug 25, 1989
1910.28 A01
- Issued
- Aug 18, 1989
- Abate by
- Oct 23, 1989
- Penalty
- Initial $1,600 · Current $1,600
Recent events (2)
- · I (R) $1600.00
- · Z (R) $1600.00
1910.28 A12
- Issued
- Aug 18, 1989
- Abate by
- Nov 27, 1989
Recent events (2)
- · P (R)
- · Z (R)
1910.104 B03 III
- Issued
- Aug 18, 1989
- Abate by
- Dec 17, 1989
1910.178 A06
- Issued
- Aug 18, 1989
- Abate by
- Sep 2, 1989
1910.178 A06
- Issued
- Aug 18, 1989
- Abate by
- Sep 7, 1989
1910.212 A01
- Issued
- Aug 18, 1989
- Abate by
- Oct 27, 1989
Recent events (2)
- · I (O)
- · Z (O)
1910.215 B09
- Issued
- Aug 18, 1989
- Abate by
- Sep 7, 1989
1910.252 A02 IVC
- Issued
- Aug 18, 1989
- Abate by
- Aug 21, 1989
More inspections at General Railroad Equipment & Services, Incor.
View General Railroad Equipment & Services, Incor.'s full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in IL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 103365144.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.