MILWAUKEE, WI —
OSHA Inspection: POBLOCKI & SONS, LLC
Referral inspection · Health discipline
At a glance
On , OSHA opened a referral health inspection of POBLOCKI & SONS, LLC in 620 S. 1ST STREET, MILWAUKEE, WI 53204 (NAICS 000000). OSHA activity number 103549531.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- POBLOCKI & SONS, LLC
- Site address
- 620 S. 1ST STREET
- City
- MILWAUKEE
- State
- WI
- ZIP
- 53204
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Complete (A)
- Discipline
- Health
- Advance notice
- No
- Union status
- Y
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 3993
- Employees
- 70
- Ownership type
- A
- Industry flags
- Manufacturing health.
Citations
3 citations on file for this inspection.
1910.134 A02
- Issued
- Nov 10, 1988
- Abate by
- Mar 17, 1989
- Penalty
- Initial $540 · Current $275 Reduced
Recent events (2)
- — I (S) $275.00
- — Z (S) $540.00
5(a)(1)
- Issued
- Nov 10, 1988
- Abate by
- Mar 17, 1989
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The %% employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to: a) Employees was exposed to material in excess of the ceiling valve recommended by the manufacturer: The painter at the paint spray booth was exposed to the hexamethylene diisocyanate at a 15 minute ceiling level of 0.184 mg/m3, approximately 1.3 times th limit of 0.14 mg/m3; this limit is established to prevent lung disease, respiratory irritation, respiratory tract and skin sensitization. The sample was collected on September 16, 1988 during a 15 minute sampling period; exposure calculations include a zero increment for the 0 minutes not sampled. General methods of control applicable in these circumstances include, but are not limited to the following: 1) Prohibiting the painter from applying paint while downstream of the part being sprayed. This can be done by using a turntable that allows the part to be turned. Alternatively, the part could be manually lifted and turned. 2) Chnaging to a paint that contains no hexamethylene diisocyanate. Abatement Schedule Step 1 - 11/29/88 Effective respiratory protection shall be provided and used by exposed employees as an interim protective measure until feasible engineering and/or administrative controls can be implemented or whenever such controls fail to redue employee exposure to within permissable exposure limits. Step 2 - 12/12/88 Submit to the Area Director a written detailed plan of abatement outlining a schedule for the implementation of engineering and/or administrative measures to control employee exposure to hazardous substances referenced in this citation. The plan shall include, at a minimum, target dates for the following actions which must be consistent with the abatement dates required by this citation: a) Evaluation of engineering/administrative control options; b) Selection of optimum control methods and completion of design; c) Procurement, installation and operation of selected control measures; d) Testing and acceptance of modification/redesign of controls All proposed control measures shall be approved for each particular use by a competent Industrial Hygienist or other technically qualified person. Ninety (90) day progress reports are required during the abatemetn period. The 90-day requirement for the submission of progress reports may be shortened or lengthened by the Area Director depending on the specific circumstances. Step 3 - 3/17/89 Abatement shall have been completed by the implementation of feasible feasible engineering and/or administrative controls upon verification of their effectiveness in achieving compliance.
1910.133 A01
- Issued
- Nov 10, 1988
- Abate by
- Nov 21, 1988
- Penalty
- Initial $360 · Current $225 Reduced
Recent events (2)
- — I (S) $225.00
- — Z (S) $360.00
More inspections at Poblocki & Sons, LLC
View Poblocki & Sons, LLC's full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in WI
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 103549531.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.