Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: R & D THIEL

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of R & D THIEL in 2883 BELLE LANE, SCHAUMBURG, IL 60193 (NAICS 000000). OSHA activity number 103591624.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch R & D Thiel — free Get an email when a new federal OSHA severe-injury report for R & D Thiel is published. One employer, no account, unsubscribe in one click.
Establishment
R & D THIEL
Site address
2883 BELLE LANE
City
SCHAUMBURG
State
IL
ZIP
60193
Mailing
1700 RAND ROAD, PALATINE, IL 60074
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
Y
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
000000
SIC code (legacy)
1751
Employees
18
Ownership type
A

3 citations on file for this inspection.

5(a)(1)

Deleted Serious Gravity 10 1 instance 2 exposed
Issued
Oct 17, 1994
Abate by
Oct 21, 1994
Penalty
Initial $4,500 · Current $4,500
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:    The
employer did not furnish employment and a place of employment which
were free from recognized hazards that were causing or likely to cause
death or serious physical harm to employees in that employees were
exposed to:
(a)  Towne Place West - Employees were exposed to fall
hazards in the process of sheathing the roof of building
#109, Unit #23.  The roof had a ground to eave height of
approximately 19 feet with varying slopes ranging from 6
inches in 12 inches to 10.5 inches in 12 inches.
Among other methods, feasible and useful methods to correct this hazard
include, but are not necessarily limited to:
(1)Preliminary site evaluation to determine the most
practical method of applying sheathing onto roof
trusses and the fall protection methods to be
employed (pre-planning).
(2)The use of scaffolds, catch platforms, static lines
and/or safety belts/body harnesses to eliminate
exposure to falls at unprotected heights.
(3)Periodic inspection to insure that fall protection
means and methods are being properly utilized by
employees who work at unprotected heights.
(4)Establishment of an enforcement procedure which
addresses safety issues and documents a series of
progressive discipline for employee non-compliance.t
Recent events (2)
  • — F (S) $4500.00
  • — Z (S) $4500.00

1926.403 B02

Serious Gravity 10 1 instance 4 exposed
Issued
Oct 17, 1994
Abate by
Oct 20, 1994
Penalty
Initial $4,500 · Current $1,800 Reduced
Recent events (2)
  • — F (S) $1800.00
  • — Z (S) $4500.00

1926.405 A02 IIJ

Serious Gravity 02 1 instance 4 exposed
Issued
Oct 17, 1994
Abate by
Oct 20, 1994
Penalty
Initial $1,800 · Current $1,800
Recent events (2)
  • — F (S) $1800.00
  • — Z (S) $1800.00

View R & D Thiel's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 103591624.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.