Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,198,547Inspections Most recent open 2026-09-01 Last loaded 2026-09-04

OSHA Inspection: NEWTON PLANING MILL

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of NEWTON PLANING MILL in CR 27 OFF SR 145, TASWELL, IN 47175 (NAICS 000000). OSHA activity number 103997862.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Newton Planing Mill for free Get an email when a new federal OSHA severe-injury report for Newton Planing Mill is published. One employer, no account, unsubscribe in one click.
Establishment
NEWTON PLANING MILL
Site address
CR 27 OFF SR 145
City
TASWELL
State
IN
ZIP
47175
Mailing
RR 2 BOX T75, TASWELL, IN 47175
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
Non-union (B)
Opened
Closing conference
Case closed
Data loaded
NAICS code
000000
SIC code (legacy)
2421
Employees
19
Ownership type
Private (A)
Industry flags
Manufacturing safety.

13 citations on file for this inspection.

1910.212 A01

Serious 2 instances 2 exposed
Issued
Mar 7, 1988
Abate by
Mar 15, 1988
Penalty
Initial $150 · Current $75 Reduced
Recent events (2)
  • · A (S) $75.00
  • · Z (S) $150.00

1910.213 G01

Serious 1 instance 2 exposed
Issued
Feb 25, 1988
Abate by
Mar 28, 1988
Penalty
Initial $200 · Current $100 Reduced
Recent events (2)
  • · A (S) $100.00
  • · Z (S) $200.00

1910.213 G03

Serious 1 instance 2 exposed
Issued
Feb 25, 1988
Abate by
Mar 28, 1988

1910.215 B09

Serious 1 instance 1 exposed
Issued
Feb 25, 1988
Abate by
Mar 2, 1988
Penalty
Initial $150 · Current $75 Reduced
Recent events (2)
  • · A (S) $75.00
  • · Z (S) $150.00

1910.219 D01

Serious 2 instances 1 exposed
Issued
Feb 25, 1988
Abate by
Mar 21, 1988
Penalty
Initial $200 · Current $100 Reduced
Recent events (2)
  • · A (S) $100.00
  • · Z (S) $200.00

1910.219 E03 I

Serious 2 instances 7 exposed
Issued
Feb 25, 1988
Abate by
Mar 21, 1988

4000402

Other-than-serious 1 instance 17 exposed
Issued
Feb 25, 1988
Abate by
Mar 15, 1988
Penalty
Initial $100 · Current $100

1910.37 Q01

Other-than-serious 1 instance 4 exposed
Issued
Feb 25, 1988
Abate by
Mar 7, 1988

1910.252 A02 IVC

Other-than-serious 1 instance 4 exposed
Issued
Feb 25, 1988
Abate by
Mar 4, 1988

1910.1200 E01

Other-than-serious 1 instance 17 exposed
Issued
Feb 25, 1988
Abate by
Mar 28, 1988

1910.1200 F04 I

Other-than-serious 1 instance 17 exposed
Issued
Feb 25, 1988
Abate by
Mar 28, 1988

1910.1200 G01

Other-than-serious 1 instance 17 exposed
Issued
Feb 25, 1988
Abate by
Mar 28, 1988

1910.1200 H

Other-than-serious 1 instance 17 exposed
Issued
Feb 25, 1988
Abate by
Mar 28, 1988

View Newton Planing Mill's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 103997862.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.