OSHA Inspection: WATERLOO TRANSMISSION, INC.

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of WATERLOO TRANSMISSION, INC. in 2063 SOUTH ARLINGTON RD., AKRON, OH 44306 (NAICS 000000). OSHA activity number 105931901.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Waterloo Transmission, INC. for free Get an email when a new federal OSHA severe-injury report for Waterloo Transmission, INC. is published. One employer, no account, unsubscribe in one click.
Site address
2063 SOUTH ARLINGTON RD.
City
AKRON
State
OH
ZIP
44306
Mailing
119 W. WATERLOO ROAD, AKRON, OH 44319
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Data loaded
NAICS code
000000
SIC code (legacy)
7537
Employees
4
Ownership type
A

20 citations on file for this inspection.

5(a)(1)

Serious Gravity 08 4 instances 2 exposed
Issued
Jun 26, 1990
Abate by
Nov 8, 1990
Penalty
Initial $640 · Current $352 Reduced
Section 5(a)(1): The issuance of this citition does not constitute a
finding that a violation of the act has occurred unless there is a
failure to contest as provided for in the act or, if contested, unless
the citition is affirmed by the Review Commission.
The violations described in this citation are alleged to have occurred
on or about the day the inspection was made unless otherwise indicated
within the description given below.
On and prior to june 13, 1990, employees on the above sits were subject
ed to the hazards of either being struck by raised lift/vehicle or being
caught between lift/vehicle and the floor resulting in fractures, crush
ing of body parts, multiple internal injuries and/or death due to inad-
vertent activities of the lift while working under a vehicle support by
the lift.
Inadvertent activity or movement of the lifts was more likely due to
lack of or deficiencies in safety equipemnt and procedures as specified
in National Standard Safety Requirements of Construction, Care, and use
of Automobile Lifts, ANSI B-153.1-1981. Among other methods, one feasi-
ble and acceptable method to correct the hazard is to comply with ANSI
B-153.1-1981 along with use of equipment designed in the industry to
meet these standards. Deficiencies noted were as follows:
a. The two in ground, axle engaging lifts on Arlington side were being
used without mechanical devices or safety latches on both fore and aft
posts to hold them in the fully raised position per 3.2.1 of ANSI
B-153.1-1981.
b. The two in ground, frame engaging Globe lifts on Krumroy side were
being operated with bolts of unknown strength substituted for designed
stops in ratches on both sides. Standard 3.2.1 of ANSI B-153.1-1981
specifies a safety factor not less than 3. stops designed for purpose
were substituted during inspection but require fastening to prevent loss
c. The two lifts of a) above were being operated with activating lever
(on floor) that did not return to neutral or off position when released
per 3.1.3 of ANSI B-153.11-1981.
d. For all four in-ground lifts in use there was no regular maintenance
per 6.1 and no periodic inspection per 6.3 of ANSI B-153.1-1981.
Recent events (2)
  • · R (S) $352.00
  • · Z (S) $640.00

1910.157 G02

Serious Gravity 02 1 instance 4 exposed
Issued
Jun 26, 1990
Abate by
Nov 8, 1990
Penalty
Initial $160 · Current $88 Reduced
Recent events (2)
  • · R (S) $88.00
  • · Z (S) $160.00

1910.215 A04

Serious Gravity 03 1 instance 2 exposed
Issued
Jun 26, 1990
Abate by
Jul 23, 1990
Penalty
Initial $240 · Current $132 Reduced
Recent events (2)
  • · R (S) $132.00
  • · Z (S) $240.00

1910.215 B09

Serious Gravity 03 1 instance 2 exposed
Issued
Jun 26, 1990
Abate by
Jul 23, 1990

1910.303 B01

Serious Gravity 06 1 instance 1 exposed
Issued
Jun 26, 1990
Abate by
Jun 29, 1990
Penalty
Initial $480 · Current $264 Reduced
Recent events (2)
  • · R (S) $264.00
  • · Z (S) $480.00

1910.303 B02

Serious Gravity 05 1 instance 3 exposed
Issued
Jun 26, 1990
Abate by
Jul 13, 1990
Penalty
Initial $400 · Current $220 Reduced
Recent events (2)
  • · R (S) $220.00
  • · Z (S) $400.00

1910.305 G01 III

Serious Gravity 00 1 instance 3 exposed
Issued
Jun 26, 1990
Abate by
Nov 8, 1990

1910.304 F05 IVA

Serious Gravity 00 1 instance 3 exposed
Issued
Jun 26, 1990
Abate by
Nov 8, 1990

1910.303 G02 I

Serious Gravity 07 3 instances 3 exposed
Issued
Jun 26, 1990
Abate by
Jul 13, 1990
Penalty
Initial $560 · Current $308 Reduced
Recent events (2)
  • · R (S) $308.00
  • · Z (S) $560.00

1910.305 B01

Serious Gravity 02 1 instance 3 exposed
Issued
Jun 26, 1990
Abate by
Nov 8, 1990
Penalty
Initial $160 · Current $88 Reduced
Recent events (2)
  • · R (S) $88.00
  • · Z (S) $160.00

1910.1200 H

Serious Gravity 03 1 instance 2 exposed
Issued
Jun 26, 1990
Abate by
Nov 8, 1990
Penalty
Initial $240 · Current $132 Reduced
Recent events (2)
  • · R (S) $132.00
  • · Z (S) $240.00

1903.2 A01

Other-than-serious Gravity 00 1 instance 4 exposed
Issued
Jun 26, 1990
Abate by
Jun 29, 1990

1910.22 A02

Other-than-serious Gravity 00 1 instance 2 exposed
Issued
Jun 26, 1990
Abate by
Nov 8, 1990

1910.37 G01

Other-than-serious Gravity 00 1 instance 4 exposed
Issued
Jun 26, 1990
Abate by
Aug 15, 1990

1910.101 B

Other-than-serious Gravity 00 1 instance 3 exposed
Issued
Jun 26, 1990
Abate by
Jul 5, 1990

1910.141 D02 II

Other-than-serious Gravity 00 1 instance 4 exposed
Issued
Jun 26, 1990
Abate by
Nov 8, 1990

1910.215 A02

Other-than-serious Gravity 00 1 instance 2 exposed
Issued
Jun 26, 1990
Abate by
Jul 23, 1990

1910.303 F

Other-than-serious Gravity 00 2 instances 3 exposed
Issued
Jun 26, 1990
Abate by
Nov 8, 1990

1910.1200 E01

Other-than-serious Gravity 00 1 instance 3 exposed
Issued
Jun 26, 1990
Abate by
Nov 8, 1990

1910.1200 G01

Serious Gravity 00 4 instances 2 exposed
Issued
Jun 26, 1990
Abate by
Nov 8, 1990

View Waterloo Transmission, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 105931901.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.