SHELBY, OH —
OSHA Inspection: CEDAR BAY CONSTRUCTION INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of CEDAR BAY CONSTRUCTION INC. in LONDON WEST RD. 8 N. BROADWAY, SHELBY, OH 44875 (NAICS 000000). OSHA activity number 106120488.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- CEDAR BAY CONSTRUCTION INC.
- Site address
- LONDON WEST RD. 8 N. BROADWAY
- City
- SHELBY
- State
- OH
- ZIP
- 44875
- Mailing
- 3514 CLEVELAND RD., WEST HURON, OH 44839
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 1622
- Employees
- 4
- Ownership type
- A
- Industry flags
- Construction safety.
Citations
13 citations on file for this inspection.
1926.20 B02
- Issued
- Nov 8, 1993
- Abate by
- Dec 2, 1993
- Penalty
- Initial $1,575 · Current $1,575
Recent events (2)
- — F (S) $1575.00
- — Z (S) $1575.00
1926.403 A
- Issued
- Nov 8, 1993
- Abate by
- Nov 12, 1993
- Penalty
- Initial $675 · Current $675
Recent events (2)
- — F (S) $675.00
- — Z (S) $675.00
1926.403 H
- Issued
- Nov 8, 1993
- Abate by
- Nov 15, 1993
- Penalty
- Initial $675
Recent events (2)
- — F (O)
- — Z (S) $675.00
1926.404 F06
- Issued
- Nov 8, 1993
- Abate by
- Nov 12, 1993
- Penalty
- Initial $1,125 · Current $1,125
Recent events (2)
- — F (S) $1125.00
- — Z (S) $1125.00
1926.405 B01
- Issued
- Nov 8, 1993
- Abate by
- Nov 12, 1993
- Penalty
- Initial $1,575 · Current $1,825
Recent events (2)
- — F (S) $1825.00
- — Z (S) $1575.00
1926.405 G02 III
- Issued
- Nov 8, 1993
- Abate by
- Nov 12, 1993
Recent events (2)
- — F (S)
- — Z (S)
1926.405 G02 IV
- Issued
- Nov 8, 1993
- Abate by
- Nov 12, 1993
Recent events (2)
- — F (S)
- — Z (S)
1926.405 G02 V
- Issued
- Nov 8, 1993
- Abate by
- Nov 12, 1993
Recent events (2)
- — F (S)
- — Z (S)
1926.20 B02
- Issued
- Nov 8, 1993
- Abate by
- Nov 12, 1993
1926.403 A
- Issued
- Nov 8, 1993
- Abate by
- Nov 12, 1993
1926.404 F06
- Issued
- Nov 8, 1993
- Abate by
- Nov 12, 1993
1926.103 C01
- Issued
- Nov 8, 1993
- Abate by
- Nov 15, 1993
- Penalty
- Initial $450
Recent events (2)
- — F (O)
- — Z (O) $450.00
1926.103 C01
- Issued
- Nov 8, 1993
- Abate by
- Nov 15, 1993
- Penalty
- Initial $450
Recent events (2)
- — F (O)
- — Z (O) $450.00
More inspections at Cedar BAY Construction INC.
View Cedar BAY Construction INC.'s full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in OH
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 106120488.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.