Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: MARIJON DYEING AND FINISHING CO., INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of MARIJON DYEING AND FINISHING CO., INC. in 219 MURRAY HILL PARKWAY, EAST RUTHERFORD, NJ 07073 (NAICS 000000). OSHA activity number 106182744.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Marijon Dyeing and Finishing CO., INC. — free Get an email when a new federal OSHA severe-injury report for Marijon Dyeing and Finishing CO., INC. is published. One employer, no account, unsubscribe in one click.
Site address
219 MURRAY HILL PARKWAY
City
EAST RUTHERFORD
State
NJ
ZIP
07073
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
Y
Opened
Closing conference
Case closed
Data loaded
NAICS code
000000
SIC code (legacy)
2262
Employees
189
Ownership type
A
Industry flags
Manufacturing safety.

10 citations on file for this inspection.

1910.151 C

Serious Gravity 04 1 instance 1 exposed
Issued
Aug 15, 1989
Abate by
Sep 21, 1989
Penalty
Initial $360 · Current $180 Reduced
Recent events (2)
  • — I (S) $180.00
  • — Z (S) $360.00

1910.178 G02

Serious Gravity 03 1 instance 1 exposed
Issued
Aug 15, 1989
Abate by
Nov 21, 1989
Penalty
Initial $270 · Current $135 Reduced
Recent events (2)
  • — I (S) $135.00
  • — Z (S) $270.00

1910.178 G10

Serious Gravity 03 1 instance 1 exposed
Issued
Aug 15, 1989
Abate by
Sep 6, 1989
Penalty
Initial $270 · Current $135 Reduced
Recent events (2)
  • — I (S) $135.00
  • — Z (S) $270.00

1910.179 J02 III

Serious Gravity 04 2 instances 2 exposed
Issued
Aug 15, 1989
Abate by
Sep 21, 1989
Penalty
Initial $360 · Current $180 Reduced
Recent events (2)
  • — I (S) $180.00
  • — Z (S) $360.00

1910.179 J02 IV

Serious Gravity 04 2 instances 2 exposed
Issued
Aug 15, 1989
Abate by
Sep 21, 1989
Penalty
Initial $360 · Current $180 Reduced
Recent events (2)
  • — I (S) $180.00
  • — Z (S) $360.00

1910.215 B09

Serious Gravity 03 1 instance 1 exposed
Issued
Aug 15, 1989
Abate by
Sep 21, 1989
Penalty
Initial $270 · Current $135 Reduced
Recent events (2)
  • — I (S) $135.00
  • — Z (S) $270.00

1910.219 D01

Serious Gravity 04 1 instance 1 exposed
Issued
Aug 15, 1989
Abate by
Nov 21, 1989
Penalty
Initial $360 · Current $180 Reduced
Recent events (2)
  • — I (S) $180.00
  • — Z (S) $360.00

1910.219 E01 I

Serious Gravity 04 1 instance 1 exposed
Issued
Aug 15, 1989
Abate by
Nov 21, 1989
Recent events (2)
  • — I (S)
  • — Z (S)

1910.1200 E01

Serious Gravity 05 1 instance 10 exposed
Issued
Aug 15, 1989
Abate by
Sep 21, 1989
Penalty
Initial $450 · Current $225 Reduced
Recent events (2)
  • — I (S) $225.00
  • — Z (S) $450.00

1910.1200 H

Serious Gravity 05 1 instance 10 exposed
Issued
Aug 15, 1989
Abate by
Dec 15, 1989
Penalty
Initial $450 · Current $225 Reduced
Recent events (3)
  • — P (S) $225.00
  • — I (S) $225.00
  • — Z (S) $450.00

View Marijon Dyeing and Finishing CO., INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 106182744.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.