NEW BERLIN, PA —
OSHA Inspection: PLAYWORLD SYSTEMS INC
Planned inspection · Health discipline
At a glance
On , OSHA opened a planned health inspection of PLAYWORLD SYSTEMS INC in 315 CHERRY STREET, NEW BERLIN, PA 17855 (NAICS 000000). OSHA activity number 106464191.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- PLAYWORLD SYSTEMS INC
- Site address
- 315 CHERRY STREET
- City
- NEW BERLIN
- State
- PA
- ZIP
- 17855
- Mailing
- P.O. BOX 505, NEW BERLIN, PA 17855
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Health
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 3949
- Employees
- 104
- Ownership type
- A
- Industry flags
- Manufacturing health.
Citations
28 citations on file for this inspection.
1910.147 C04 I
- Issued
- Sep 8, 1994
- Abate by
- Oct 12, 1994
- Penalty
- Initial $825 · Current $445 Reduced
Recent events (2)
- — I (S) $445.00
- — Z (S) $825.00
1910.147 C07 IC
- Issued
- Sep 8, 1994
- Abate by
- Oct 12, 1994
1910.333 B02 I
- Issued
- Sep 8, 1994
- Abate by
- Oct 12, 1994
1910.219 E01 I
- Issued
- Sep 8, 1994
- Abate by
- Oct 12, 1994
- Penalty
- Initial $1,925 · Current $1,120 Reduced
Recent events (2)
- — I (S) $1120.00
- — Z (S) $1925.00
1910.219 D01
- Issued
- Sep 8, 1994
- Abate by
- Oct 12, 1994
1910.215 A04
- Issued
- Sep 8, 1994
- Abate by
- Oct 12, 1994
- Penalty
- Initial $1,100 · Current $630 Reduced
Recent events (2)
- — I (S) $630.00
- — Z (S) $1100.00
1910.215 B02
- Issued
- Sep 8, 1994
- Abate by
- Oct 12, 1994
1910.95 B01
- Issued
- Sep 8, 1994
- Abate by
- Jan 15, 1995
- Penalty
- Initial $1,100 · Current $630 Reduced
8110
Recent events (2)
- — I (S) $630.00
- — Z (S) $1100.00
1910.95 I02 I
- Issued
- Sep 8, 1994
- Abate by
- Sep 16, 1994
8110
1910.95 I02 IIA
- Issued
- Sep 8, 1994
- Abate by
- Oct 12, 1994
8110
1910.95 C01
- Issued
- Sep 8, 1994
- Abate by
- Oct 12, 1994
- Penalty
- Initial $825 · Current $445 Reduced
8110
Recent events (2)
- — I (S) $445.00
- — Z (S) $825.00
1910.95 G01
- Issued
- Sep 8, 1994
- Abate by
- Oct 12, 1994
8110
5(a)(1)
- Issued
- Sep 8, 1994
- Abate by
- Feb 28, 1995
- Penalty
- Initial $1,100 · Current $630 Reduced
8301
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees exposed were performing lifting tasks resulting in stresses the had caused, were causing, or were likely to cause musculoskeletal injuries: a) Wood shop - Angle cutter - An employee was required to lift 6in.x6in.x12ft. wooden beams weighing 100 lbs. each from the cutting table to the pallet storage area. The evaluation of this manual lifting task indicated that employees were exposed to a hazard which is causing or likely to cause musculoskeletal injuries. The employer did not implement an effective control strategy to reduce or eliminate such injuries. The injury and illness records for 1992, 1993 and 1994 documented musculoskeletal injuries. Among other methods, one feasible and acceptable abatement method to correct this hazard is the implementation of an ergonomics management program consisting of the following four elements. (1) Worksite analysis to recognize and identify existing manual lifting hazards in the workplace. This analysis should include development and use of an ergonomic checklist and employee questionnaire. Periodic surveys of the worksite shall be conducted at least annually to evaluate work practices and engineering controls. Employee participation in the ergonomic program should be encouraged through a mechanism such as a safety committee. (2) Medical management which includes accurate recordkeeping of manual lifting injuries. The program should address recognition, evaluation, treatment and referral of lifting cases. Systematic worksite review by the medical team should also be included in the program. (3) Training and education for exposed employees, including methods to evaluate the effectiveness of the training. Re-training should be done annually, or as operations change. Training should address hazards associated with the job, the risks of manual material handling, and how to prevent lifting injuries. A supervisor's training program should also be implemented to allow recognition of manual lifting hazards, and to reinforce the employer's ergonomic program. (4) Hazard prevention and control which includes engineering, work practices and administrativecontrols: (a) Administrative controls are implemented which reduce the duration, frequency, and severity of exposure to manual lifting hazards. These controls may include job rotation, reduction of repetitions, multiple person lifts, and preventative maintenance of related equipment. (b) Work practice controls are implemented which include proper work techniques, new employee conditioning, proper placement of loads, and reduction of weight lifted. Examples of work practice controls applicable to this workplace include: (c) Engineering controls are designed by a qualified ergonomist and may include work station redesign, tool and handle redesign, and use of mechanical lifting aids. The goal of this program should be to make the job fit the person. Examples of engineering controls applicable in this workplace include: (i) Utilize a hydraulic lift table at the end of the line to eliminate the lifting task. ABATEMENT SCHEDULE Step 1 - Implementation of an ergonomics program for worksite analysis, medical management, and training and education, as detailed in items 1-3, above. Step 2 - Submit to the Area Director a written, detailed plan of abatement outlining a schedule for the implementation of the administrative, work practice and engineering controls as detailed in items 4(a) - 4(c). ALL PROPOSED CONTROL MEASURES SHALL BE APPROVED FOR EACH PARTICULAR USE BY A PERSON TRAINED IN THE EVALUATION OF WORKPLACE CONDITIONS WHICH CAUSE MUSCULOSKELETAL DISORDERS. SIXTY (60) DAY PROGRESS REPORTS ARE REQUIRED DURING THE ABATEMENT PERIOD. Step 3 - Implementation of administrative, work practice and engineering controls as described in items 4(a) - 4(c), above.
Recent events (3)
- — P (S) $630.00
- — I (S) $630.00
- — Z (S) $1100.00
5(a)(1)
- Issued
- Sep 8, 1994
- Abate by
- Oct 12, 1994
- Penalty
- Initial $1,100 · Current $630 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were expose to a crushing/amputation hazard from unintended activation: a) Wood shop - The no-name drill press was not equipped with a pedal cover thereby creating a pinching hazard to the hand, August 2, 1994. Among other methods, one feasible and acceptable abatement method to correct this hazard is to guard the foot pedal.
Recent events (2)
- — I (S) $630.00
- — Z (S) $1100.00
1910.23 C01
- Issued
- Sep 8, 1994
- Abate by
- Oct 12, 1994
- Penalty
- Initial $1,100 · Current $630 Reduced
Recent events (2)
- — I (S) $630.00
- — Z (S) $1100.00
1910.213 H04
- Issued
- Sep 8, 1994
- Abate by
- Sep 28, 1994
- Penalty
- Initial $1,100 · Current $630 Reduced
Recent events (2)
- — I (S) $630.00
- — Z (S) $1100.00
1910.213 L02
- Issued
- Sep 8, 1994
- Abate by
- Oct 12, 1994
- Penalty
- Initial $1,100 · Current $630 Reduced
Recent events (2)
- — I (S) $630.00
- — Z (S) $1100.00
1910.1030 F01 I
- Issued
- Sep 8, 1994
- Abate by
- Oct 12, 1994
- Penalty
- Initial $1,375 · Current $790 Reduced
Recent events (2)
- — I (S) $790.00
- — Z (S) $1375.00
1910.1030 G02 I
- Issued
- Sep 8, 1994
- Abate by
- Oct 12, 1994
- Penalty
- Initial $1,375 · Current $790 Reduced
Recent events (2)
- — I (S) $790.00
- — Z (S) $1375.00
1910.95 D01
- Issued
- Sep 8, 1994
- Abate by
- Oct 12, 1994
8110
1910.95 E
- Issued
- Sep 8, 1994
- Abate by
- Oct 12, 1994
8110
1910.95 L01
- Issued
- Sep 8, 1994
- Abate by
- Sep 28, 1994
8110
1910.107 B07
- Issued
- Sep 8, 1994
- Abate by
- Oct 12, 1994
1910.107 B08
- Issued
- Sep 8, 1994
- Abate by
- Sep 28, 1994
1910.157 G01
- Issued
- Sep 8, 1994
- Abate by
- Oct 12, 1994
1910.176 A
- Issued
- Sep 8, 1994
- Abate by
- Oct 12, 1994
1910.253 B02 II
- Issued
- Sep 8, 1994
- Abate by
- Sep 16, 1994
1910.20 G01
- Issued
- Sep 8, 1994
- Abate by
- Sep 28, 1994
More inspections at Playworld Systems INC
View Playworld Systems INC's full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 106464191.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.