EAST STROUDSBURG, PA ·
OSHA Inspection: MACK PRINTING GROUP
Planned inspection · Health discipline
At a glance
On , OSHA opened a planned health inspection of MACK PRINTING GROUP in 34 N CRYSTAL ST, EAST STROUDSBURG, PA 18301 (NAICS 000000). OSHA activity number 106474604.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- MACK PRINTING GROUP
- Site address
- 34 N CRYSTAL ST
- City
- EAST STROUDSBURG
- State
- PA
- ZIP
- 18301
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Health
- Advance notice
- No
- Union status
- Union (Y)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 2732
- Employees
- 254
- Ownership type
- Private (A)
- Industry flags
- Manufacturing health.
Citations
12 citations on file for this inspection.
5(a)(1)
- Issued
- Jan 6, 1997
- Abate by
- Nov 1, 1998
- Penalty
- Initial $4,500 · Current $3,250 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were required to perform tasks involving repetitive motions resulting in stresses that had caused, were causing, or were likely to cause cumulative trauma disorders: a) Inserter lines - Employees were suffering upper extremity and back repetitive motion injuries while performing tasks including bending to floor level to retrieve inserts form baskets, twisting, jogging and fanning inserts. The employer did not implement an effective control strategy to reduce or eliminate such disorders. The injury and illness records for 1995 and 1996 documented a pattern of repetitive motion injuries. b) Perfect Binder - Employees were suffering upper extremity and back repetitive motion injuries while performing tasks including bending to floor level to retrieve inserts form baskets, twisting, jogging and fanning inserts. The employer did not implement an effective control strategy to reduce or eliminate such disorders. The injury and illness records for 1995 and 1996 documented a pattern of repetitive motion injuries. c) Stagers and Skid Stackers - Employees were suffering upper extremity and back repetitive motion injuries while performing tasks including bending to floor level to place magazines into baskets, twisting, and scooping magazines into piles which are held in a pinch grip. The employer did not implement an effective control strategy to reduce or eliminate such disorders. The injury and illness records for 1995 and 1996 documented a pattern of repetitive motion injuries. Among other methods, one feasible and acceptable abatement method to correct this hazard is the implementation of an ergonomics management program consisting of the following four elements. (1) Worksite analysis to recognize and identify existing cumulative trauma disorders in the workplace. This analysis should include development and use of an ergonomic checklist and employee questionnaire. Periodic surveys of the worksite shall be conducted at least annually to evaluate work practices and engineering controls. Employee participation in the ergonomic program should be encouraged. (2) Medical management which includes accurate recordkeeping of CTDs. The program should address early recognition, evaluation, and referral of CTD cases, and should include conservative treatment and conservative return to work. Systematic worksite review by the medical team should also be included in the program. (3) Training and education for exposed employees, including methods to evaluate the effectiveness of the training. Re-training should be done annually, or as operations change. Training should address hazards associated with the job, the risks of developing CTDs, symptoms of exposure, and how to prevent the occurrence ofCTD. A supervisor's training program should also be implemented to allow recognition of the signs of CTDs and to reinforce the employer's ergonomic program. (4) Hazard prevention and control which includes engineering, work practices and administrative controls, and personal protective equipment where relevant. (a) Administrative controls are implemented which reduce the duration, frequency, and severity of exposure to ergonomic stress. These controls may include job rotation, reduction of repetitions, and preventative maintenance of related equipment. Personal protective equipment shall be evaluated to determine any contribution to ergonomic stress. (b) Work practice controls are implemented which include proper work techniques, new employee conditioning, and monitoring and modifications as necessary to minimize ergonomic stressors. Examples of work practice controls applicable to this workplace include: (i) Train employees to perform jogging and fanning when needed instead of performing them several times for one pile. (ii) Train employees to grasp piles of comfortable size. (c) Engineering controls are designed by a qualified ergonomist and may include work station redesign, tool and handle redesign, and change or work methods. The goal of this program should be to make the job fit the person. Examples of engineering controls applicable in this workplace include: (i) Utilize automatic pocket feeders (ii) Use equipment which mechanically jogs and fans the piles (iii) Utilize a load leveler with a rotating top to create and even transfer from the pallet to the staging area. (iv) Alter conveyors to be height available (v) Utilize scissor lifts to reduce low level bending (vi) Position a stacker (light activated) mechanism at the staging areas to accumulate desired stacks of magazines which then can be bound without employee manipulation. (vii) Implement the recommendations outlined in the Liberty Mutualergonomics report. ABATEMENT SCHEDULE Step 1 - Implementation of an ergonomics program for worksite analysis, medical management, and training and education, as detailed in items 1-3, above. Step 2 - Submit to the Area Director a written, detailed plan of abatement outlining a schedule for the implementation of the administrative, work practice and engineering controls as detailed in items 4(a) - 4(c). ALL PROPOSED CONTROL MEASURES SHALL BE APPROVED FOR EACH PARTICULAR USE BY A PERSON TRAINED IN THE EVALUATION OF WORKPLACE CONDITIONS WHICH CAUSE CUMULATIVE TRAUMA DISORDERS. SIXTY (60) DAY PROGRESS REPORTS ARE REQUIRED DURING THE ABATEMENT PERIOD. Step 3 - Implementation of administrative, work practice and engineering controls as described in items 4(a) - 4(c), above. Date by Which Violation Must be Abated: STEP - 1 01/24/97 Date by Which Violation Must be Abated: STEP - 2 02/08/97 Date by Which Violation Must be Abated: STEP - 3 03/10/97
Recent events (3)
- · F (S) $3250.00
- · A (S) $4500.00
- · Z (S) $4500.00
1910.147 C04 I
- Issued
- Jan 6, 1997
- Abate by
- Jan 24, 1997
- Penalty
- Initial $4,500
Recent events (3)
- · F (S)
- · A (S) $4500.00
- · Z (S) $4500.00
1910.147 C06 II
- Issued
- Jan 6, 1997
- Abate by
- Jan 24, 1997
- Penalty
- Initial $1,125
Recent events (3)
- · F (O)
- · A (S) $1125.00
- · Z (S) $1125.00
1910.178 O01
- Issued
- Jan 6, 1997
- Abate by
- Jan 24, 1997
- Penalty
- Initial $1,875 · Current $1,440 Reduced
Recent events (3)
- · F (S) $1440.00
- · A (S) $1875.00
- · Z (S) $1875.00
1910.212 A01
- Issued
- Jan 6, 1997
- Abate by
- Jan 24, 1997
- Penalty
- Initial $2,625 · Current $1,815 Reduced
Recent events (3)
- · F (S) $1815.00
- · A (S) $2625.00
- · Z (S) $2625.00
1910.303 G02 I
- Issued
- Jan 6, 1997
- Abate by
- Jan 24, 1997
- Penalty
- Initial $1,125 · Current $565 Reduced
Recent events (3)
- · F (S) $565.00
- · A (S) $1125.00
- · Z (S) $1125.00
1910.95 L01
- Issued
- Jan 6, 1997
- Abate by
- Jan 24, 1997
Recent events (3)
- · F (O)
- · A (O)
- · Z (O)
1910.157 G02
- Issued
- Jan 6, 1997
- Abate by
- Jan 24, 1997
Recent events (3)
- · F (O)
- · A (O)
- · Z (O)
1910.178 P01
- Issued
- Jan 6, 1997
- Abate by
- Jan 24, 1997
Recent events (3)
- · F (O)
- · A (O)
- · Z (O)
1910.305 B01
- Issued
- Jan 6, 1997
- Abate by
- Jan 24, 1997
Recent events (3)
- · F (O)
- · A (O)
- · Z (O)
1910.305 I03 IIE
- Issued
- Jan 6, 1997
- Abate by
- Jan 24, 1997
Recent events (3)
- · F (O)
- · A (O)
- · Z (O)
1910.1020 G01
- Issued
- Jan 6, 1997
- Abate by
- Jan 24, 1997
Recent events (3)
- · F (O)
- · A (O)
- · Z (O)
More inspections in this industry (NAICS 000000)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 106474604.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.