SYRACUSE, NY —
OSHA Inspection: CROUSE HINDS DIV OF COOPER INDUSTRIES
Accident-driven inspection · Safety discipline
At a glance
On , OSHA opened an accident-driven safety inspection of CROUSE HINDS DIV OF COOPER INDUSTRIES in WOLF STREET AND 7TH NORTH STREET, SYRACUSE, NY 13221 (NAICS 000000). OSHA activity number 106901085.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- CROUSE HINDS DIV OF COOPER INDUSTRIES
- Site address
- WOLF STREET AND 7TH NORTH STREET
- City
- SYRACUSE
- State
- NY
- ZIP
- 13221
- Mailing
- PO BOX 4999, SYRACUSE, NY 13221
What kind of inspection was it?
- Inspection type
- Accident-driven (A)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Y
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 3643
- Employees
- 1250
- Ownership type
- A
- Industry flags
- Manufacturing safety.
Citations
63 citations on file for this inspection.
5(a)(1)
- Issued
- Jul 23, 1999
- Abate by
- Jan 23, 2000
- Penalty
- Initial $5,500 · Current $5,500
General-duty citation text
53.Building# 2 Tool Room, SWO# 2059, CM electric chain hoist: There was no load rating on the supporting structure, and the control reel does not extend to the full length of the rail. Observed on or about 02- 26-99. 54.Building# 2, SWO# 2062, electric chain hoist: There was no load rating on the supporting structure. Observed on or about 02-26-99. 55.Building# 50 Tool & Die Repair, SWO# 2120, electric chain hoist: There was no load rating on the supporting structure, and the pendant control was missing the button for the down control. Observed on or Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The about 03-03-99. 56.Building# 50 Tube Mill Process, SWO# 2565, Cleveland Tramrail electric chain hoist: There was no load rating on the supporting structure. Observed on or about 03-03-99. 57.Building# 50, SWO# 2087, electric wire rope hoist: There was no load rating on the supporting structure, hook latch was missing, and wire clips on hoist cable were attached backwards. Observed on or about 03-03-99. 58.Sheet Metal Shop, SWO# 2107, electric wire rope hoist: Load cable is damaged (kinked), load cable is crossed/overlapped on the drum, employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to the hazard of being struck by the load should the overhead hoist, supporting structure, or below-the-hook lifting devices fail: a)In the workplace, at locations and equipment identified, on dates and the hook latch is damaged. Observed on or about 05-18-99. Abatement certification must be submitted for this item. Among other methods several feasible and acceptable methods of abatement to correct each of these hazards are to: 1.Determine load rating from structural design material. 2.Determine loading rating from structural engineering study. 3.Label the proper rating on each of the supporting structures. 4.Establish a log of each hoist for frequent and periodic inspection. 5.Label the controls for the direction of operation. listed, the 6.Repair/ replace controls. 7.Repair/ replace hook latches. following overhead hoists had missing and/or damaged hook latches, unrated supporting structures, unlabeled controls, damaged controls, or damaged wire rope, including, but not limited to: 1.Aluminum Foundry, SWO# 2477, Cleveland Tramrail electrolift electric wire rope hoist: The electric control lines entering/exiting the pendant control had insulation removed exposing bare wires. Observed on or about 02-23-99. 2.Iron Foundry, SWO# 2545, pneumatic chain hoist: The controls were 8.Follow requirements as listed in ASME/ANSI B30.16. 9. Follow requirements as listed in ANSI B30.11. 10.Replace wire ropes with defects such as severe kinking, etc. b)In the workplace, at locations and equipment identified, on dates as indicated, the following below-the-hook lifting devices had no rated load marking and no initial, frequent or periodic inspections performed, including, but not limited to: 1.Coremaking Area: A Morse lifting device, Serial# 172852, suspended by SWO# 2547 was not provided with frequent and periodic inspections. Observed on or about 02-22-99. 2.Shalco Area: Two lifting devices attached to Gardner Denver Hoists, were not provided with frequent and periodic inspections. Observed on or about 05-18-99. 3.Iron Foundry: Lifting device suspended by SWO# 2504 was not provided with frequent and periodic inspections and was not provided with any markings or load ratings. Observed on or about 02-22-99. 4.Iron Foundry: Lifting device suspended by SWO# 2486, was not provided with frequent and periodic inspections. Observed on or about 02-22-99. 5.Iron Foundry: Lifting Device suspended by SWO# 2489, was not provided with any markings or load ratings, and was not provided with any frequent or periodic inspections. Observed on or about 02- 22-99. 6.Aluminum Foundry: Lifting device suspended by Hoist# 12 was not provided with any markings or load ratings and was not provided with frequent and periodic inspections. Observed on or about 02-23-99. 7.Aluminum Foundry: Lifting device suspended by SWO# 2466 was not provided with any markings or load ratings, and was not provided with any frequent and periodic inspections. Observed on or about 02- 23-99. 8.Aluminum Foundry: Lifting device suspended by SWO# 2464 was not provided with any markings or load ratings, and was not provided with any frequent and periodic inspections. Observed on or about 02- 23-99. 9.Plastics Department: Two Barrel lifting devices that are suspended from SWO# 2083 were not provided with any markings or load ratings, and were not provided with any frequent or periodic inspections. Observed on or about 02-24-99. 10.Building# 4: Lifting device suspended by SWO# 2096 was not provided with any markings or load ratings, and was not provided with any frequent or periodic inspections. Observed on or about 02- 26-99. 11.Sheet Metal Department: Lifting device suspended by SWO# 2018 was not provided with any markings or load ratings, and was not provided with any frequent or periodic inspections. Observed on or about 05-18-99. 12.Tank Wash Area: Lifting device suspended by SWO# 2049 was not provided with any markings or load ratings, and was not provided with any frequent or periodic inspections. Observed on or about 02- 26-99. 13.Tank Wash Area: Lifting device suspended by SWO# 2047 was not provided with any markings or load ratings, and was not provided with any frequent or periodic inspections. Observed on or about 02- 26-99. 14.Tank Wash Area: Lifting device suspended by SWO# 2490 was not provided with any frequent or periodic inspections. Observed on or about 02-26-99. 15.Enamel Area: Lifting device suspended by SWO# 2089 was not provided with any markings or load ratings, and was not provided with any frequent or periodic inspections. Observed on or about 02- 26-99. 16.Aluminum Foundry: Lifting device suspended by SWO# 2469 was not provided with any markings or load ratings, and was not provided with any frequent or periodic inspections. Observed on or about 02- 23-99. 17.Aluminum Foundry: Lifting device suspended by SWO# 2468 was not provided with any markings or with any frequent or periodic inspections. Observed on or about 02-23-99. 18.Building# 50 Tube Mill Process: Lifting device suspended by SWO# 2565 was not provided with any markings or load ratings, and was not provided with any frequent or periodic inspections. Observed on or about 03-03-99. 19.Building# 50 Tool & Die Repair: Lifting device suspended by SWO# 2120 was not provided with any markings or load ratings, and was not provided with any frequent or periodic inspections. Observed on or about 03-03-99. 20.Electric Melt: Magnetic lifting device suspended by SWO# 1205 was not provided with any cautionary labeling, markings or load ratings, and was not provided with any frequent inspections. Observed on or about 03-04-99. 21.Electric Melt: Magnetic lifting device suspended by SWO# 1206 was not provided with any cautionary labeling, markings or load ratings, and was not provided with any frequent inspections. Observedon or about 03-04-99. 22.Bin Wash: Lifting device supported by SWO# 2078 was not provided with any markings or load ratings, and was not provided with any frequent or periodic inspections. Observed on or about 02-24-99. 23.Building# 50, Tool & Die Repair: Lifting device used under various SWO#'s was not provided with any markings or load ratings, and was not provided with any frequent or periodic inspections. Observed on or about 03-03-99. Abatement certification must be submitted for this item. Among other methods, several feasible and acceptable abatement methods to correct each of these hazards are to: 1.Prior to initial use, all new, modified or repaired lifting devices shall be inspected by a designated person and an operational test performed to verify compliance. 2.Mark the rated load capacity of the lifting device on the main structure or equivalent. 3.Conduct frequent and periodic inspections of the lifting devices for wear, deterioration or malfunction in accordance with ASME B30.20. not labeled and there was no load rating on the hoist or the supporting structure. Observed on or about 02-22-99. 3.Coremaking Area, SWO# 2547, Centurion pneumatic chain hoist: There was no load rating on the supporting structure. Observed on or about 02-22-99. 4.Coremaking Area, SWO# 2460, pneumatic chain hoist: There was no load rating on the supporting structure. Observed on or about 02-22- 99. 5.Shalco Area, SWO# 2491, hoist: There was no load rating on the supporting structure. Observed on or about 02-22-99. 6.Shalco Area: Two Gardner-Denver Hoists were supported by one supporting structure that did not have any load rating. Observed on or about 02-22-99. 7.Iron Foundry, SWO# 2532, electric wire rope hoist: There was no load rating on the hoist or the supporting structure. Observed on or about 02-22-99. 8.Iron Foundry, SWO# 1404, electric wire rope hoist: There was no load rating on the supporting structure. Observed on or about 02-22- 99. 9.Iron Foundry: SWO#'s 2487, 2528, and 2504 were all attached to the same supporting structure that did not have any load rating. Observed on or about 02-22-99. 10. Iron Foundry, floor molding area: An electric chain hoist had no load rating on the structure, no directional labels on the controls, and no hook latch. Observed on or about 02-22-99. 11.Iron Foundry, SWO# 2486, pneumatic chain hoist: There was no load rating on the supporting structure. Observed on or about 02-22-99. 12.Iron Foundry, SWO# 2489, pneumatic chain hoist: There was no load rating on the supporting structure. Observed on or about 02-22-99. 13.Foundry Maintenance, welding area, SWO# 2093, Yale electric wire rope hoist: There was no load rating on the supporting structure and the wire rope was overlapped onto itself on the drum. Observed on or about 02-22-99. 14.Foundry maintenance, pneumatic chain hoist: There was no load rating on the support structure. Observed on or about 02-22-99. 15. Iron Foundry, SWO# 2531, electric wire rope hoist: There were no load rating on the supporting structure or the hoist. Observed on or about 02-22-99. 16.Iron Foundry: SWO#'s 2531, 2537, 2539, 2538, electric wire rope hoists, were on the same supporting structure (SWO# 2404), which did not have any load rating. Observed on or about 02-22-99. 17.Aluminum Foundry, Hoist #12, pneumatic chain hoist: There was no load rating on the supporting structure and the hook latch was broken. Observed on or about 02-23-99. 18.Aluminum Foundry, SWO# 2465, electric wire rope hoist: The controls were not labeled and there was no load rating on the supporting structure. Observed on or about 02-23-99. 19.Aluminum Foundry, SWO# 2466, Cleveland tramrail, electric chain hoist: The controls were not labeled. Observed on or about 02-23-99. 20.Aluminum Foundry, SWO# 2464, hoist: The controls were not labeled. Observed on or about 02-23-99. 21.Aluminum Foundry: SWO#'s 2466, 2465, 2464, 2467, were all on the same supporting structure which was not labeled with a load rating. Observed on or about 02-23-99. 22.Aluminum Foundry, SWO# 2469, electric wire rope hoist: Controls were not labeled, no load rating for the supporting structure. Observed on or about 02-23-99. 23.Aluminum Foundry, SWO# 2468, electric wire rope hoist: Controls were not labeled, no load rating for the supporting structure. Observed on or about 02-23-99. 24.Building 33: The CM Lodestar electric chain hoist in front of the powder paint area was attached to a support structure that was not provided with a load rating. Observed on or about 02-24-99. 25.Plastics Department, SWO# 2083, Yale pneumatic chain hoist: The controls were not labeled, and the supporting structure was not labeled with the load ratings. Observed on or about 02-24-99. 26.Bin Wash, SWO# 2078, Yale pneumatic chain hoist: The controls were not labeled, there was no load rating for the supporting structure, and the hook latch was missing. Observed on or about 02- 24-99. 27.Power Plant, SWO# 2482, electric chain hoist: There was no load rating for the supporting structure, and there were no labels on the controls. Observed on or about 02-24-99. 28.Truck Maintenance, SWO# 2074, electric chain hoist: There was no load rating on the supporting structure. Observed on or about 02-24- 99. 29.CNC, SWO# 1984, pneumatic chain hoist: The controls were not labeled and there was no load rating for the supporting structure. Observedon or about 02-25-99. 30.Plating Department, pneumatic chain hoist: There was no load rating on the supporting structure. Observed on or about 2-26-99. 31.Chip Room, SWO# 2499, electric chain hoist: There was no load rating on the supporting structure. Observed on ore about 02-25-99. 32.Building# 2, SWO# 2054, pneumatic chain hoist: There was no load rating for the supporting structure. Observed on or about 02-25-99. 33.Building# 2, SWO# 2011, pneumatic chain hoist: There was no labeling of the controls, and there was no load rating on the supporting structure. Observed on or about 02-25-99. 34.Building# 2, SWO# 2008, pneumatic chain hoist: There was no load rating for the supporting structure. Observedon or about 02-25-99. 35.Building# 2, SWO# 2507, pneumatic chain hoist: There was no load rating for the supporting structure. Observed on or about 02-25-99. 36.Building# 2, SWO# 2567, pneumatic chain hoist: There was no load rating for the supporting structure. Observed on or about 02-25-99. 37.Building# 2, SWO# 2029, electric chain hoist: There was no load rating for the supporting structure. Observed on or about 02-25-99. 38.Building# 4 cold form, Coffin electric chain hoist: There was no load rating or the supporting structure. Observed on or about 02-26-99. 39.Press Room, SWO# 2573, electric chain hoist: There was no load rating for the supporting structure. Observed on or about 02-26-99. 40.Press Room, SWO# 2035, electric wire rope hoist: There was no load rating for the supporting structure. Observed on or about 02-26-99. 41.Building# 4 press annex, SWO# 2572, pneumatic chain hoist: There was no load rating on the supporting structure. Observed on or about 02-26-99. 42.Building# 4, SWO# 2096, pneumatic chain hoist: The controls were not labeled and there was no load rating on the supporting structure. Observed on or about 02-26-99. 43.Sheet Metal, SWO# 2018, electric chain hoist: Controls were not labeled, no load rating on the supporting structure, and support rods were tilted. Observed on or about 05-18-99. 44.Cover Cell Area, SWO# 2571, Budget electric chain hoist: There was no load rating on the supporting structure. Observed on or about 02- 26-99. 45.Cover Cell Area, SWO# 2023, electric chain hoist: There was no load rating on the supporting structure. Observed on or about 02-26-99. 46.CA1 Assembly, SWO# 2032, pneumatic chain hoist: There was no load rating on the supporting structure. Observed on or about 02-26- 99. 47.CNC Maintenance, SWO# 2558, pneumatic chain hoist: There was no load rating on the supporting structure. Observed on or about 02-26- 99. 48.Tank Wash Area, SWO# 2049, pneumatic chain hoist: The support structure was not labeled, and the support structure was in disrepair (connecting pins drifted). Observed on or about 02-26-99. 49.Tank Wash Area, SWO# 2047, pneumatic chain hoist: Support beams were not labeled, and supporting structure was in disrepair (connecting pins drifted). Observed on or about 02-26-99. 50.Tank Wash Area, SWO# 2490, pneumatic wire rope hoist: Controls were not labeled, and there was no load rating on the supporting structure. Observed on or about 02-26-99. 51.Enamel, SWO# 2089, pneumatic chain hoist: There was no load rating on the supporting structure, and controls were not legible (painted over). Observed on or abbout 02-26-99. 52. Building# 2 conveyor from CNC, SWO# 2040, Yale pneumatic chain hoist: There was no load rating on the supporting structure. Observed on or about 02-26-99.
5(a)(1)
- Issued
- Jul 23, 1999
- Abate by
- Jul 28, 1999
- Penalty
- Initial $5,500 · Current $5,500
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to the hazard of being pulled into and crushed by the rotating parts of a pipe threading machine. In the workplace, at locations and equipment identified, on or about 02-22-99, pipe threading machines were activated by a manually operated on/off switch that would not automatically shut the machine off should the operator be inadvertently caught in the machine. a)Iron Foundry, Machine shop, adjacent to welding area, secured area, rigid pipe threading machine. b)Bldg #50, Compressor Room, Oster pipe threading machine. Among other methods, one feasible method to reduce the hazard is to install a momentary contact device (deadman foot switch) to control power input to the machine. The device would automatically stop the machine and the rotating parts if the operators foot was removed from the switch for any reason. The foot switch must be provided with a protective cover as described in 29 CFR 1910.217(b)(4).
1904.2 A
- Issued
- Jul 23, 1999
- Abate by
- Jul 28, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.22 A02
- Issued
- Jul 23, 1999
- Abate by
- Aug 23, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.22 D01
- Issued
- Jul 23, 1999
- Abate by
- Jul 28, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.23 C01
- Issued
- Jul 23, 1999
- Abate by
- Aug 23, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.23 C03
- Issued
- Jul 23, 1999
- Abate by
- Sep 23, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.36 B06
- Issued
- Jul 23, 1999
- Abate by
- Jul 28, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.37 Q01
- Issued
- Jul 23, 1999
- Abate by
- Jul 28, 1999
- Penalty
- Initial $4,000 · Current $4,000
1910.106 E09 III
- Issued
- Jul 23, 1999
- Abate by
- Jul 28, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.138 A
- Issued
- Jul 23, 1999
- Abate by
- Jul 28, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.146 C02
- Issued
- Jul 23, 1999
- Abate by
- Sep 1, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.146 C03
- Issued
- Jul 23, 1999
- Abate by
- Aug 23, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.146 C07 III
- Issued
- Jul 23, 1999
- Abate by
- Aug 23, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.146 G01
- Issued
- Jul 23, 1999
- Abate by
- Aug 23, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.147 C04 I
- Issued
- Jul 23, 1999
- Abate by
- Aug 23, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.147 C04 II
- Issued
- Jul 23, 1999
- Abate by
- Aug 23, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.147 C05 IID
- Issued
- Jul 23, 1999
- Abate by
- Jul 28, 1999
- Penalty
- Initial $4,000 · Current $4,000
1910.147 C06 I
- Issued
- Jul 23, 1999
- Abate by
- Jul 23, 2000
- Penalty
- Initial $5,500 · Current $5,500
1910.147 C07 I
- Issued
- Jul 23, 1999
- Abate by
- Jul 28, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.147 E03
- Issued
- Jul 23, 1999
- Abate by
- Jul 28, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.147 F03 I
- Issued
- Jul 23, 1999
- Abate by
- Aug 23, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.147 F03 II
- Issued
- Jul 23, 1999
- Abate by
- Aug 23, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.157 C01
- Issued
- Jul 23, 1999
- Abate by
- Jul 28, 1999
- Penalty
- Initial $4,000 · Current $4,000
1910.178 M03
- Issued
- Jul 23, 1999
- Abate by
- Jul 28, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.179 C02
- Issued
- Jul 23, 1999
- Abate by
- Oct 23, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.179 D03
- Issued
- Jul 23, 1999
- Abate by
- Oct 23, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.179 G01
- Issued
- Jul 23, 1999
- Abate by
- Aug 23, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.179 J02
- Issued
- Jul 23, 1999
- Abate by
- Oct 25, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.179 J03
- Issued
- Jul 23, 1999
- Abate by
- Oct 25, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.179 M01
- Issued
- Jul 23, 1999
- Abate by
- Aug 23, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.184 C01
- Issued
- Jul 23, 1999
- Abate by
- Jul 28, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.184 D
- Issued
- Jul 23, 1999
- Abate by
- Jul 28, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.212 A01
- Issued
- Jul 23, 1999
- Abate by
- Oct 25, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.212 A03 II
- Issued
- Jul 23, 1999
- Abate by
- Feb 1, 2000
- Penalty
- Initial $5,500 · Current $5,500
Recent events (2)
- — P (U) $5500.00
- — Z (U) $5500.00
1910.212 A04
- Issued
- Jul 23, 1999
- Abate by
- Oct 25, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.212 A05
- Issued
- Jul 23, 1999
- Abate by
- Jul 28, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.212 B
- Issued
- Jul 23, 1999
- Abate by
- Sep 23, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.213 C02
- Issued
- Jul 23, 1999
- Abate by
- Jul 28, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.213 H01
- Issued
- Jul 23, 1999
- Abate by
- Jul 28, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.215 A04
- Issued
- Jul 23, 1999
- Abate by
- Jul 28, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.215 B09
- Issued
- Jul 23, 1999
- Abate by
- Jul 28, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.215 C01
- Issued
- Jul 23, 1999
- Abate by
- Jul 28, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.215 D01
- Issued
- Jul 23, 1999
- Abate by
- Jul 28, 1999
- Penalty
- Initial $5,500 · Current $5,500
5(a)(1)
- Issued
- Jul 23, 1999
- Abate by
- Jul 28, 1999
- Penalty
- Initial $5,500 · Current $5,500
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970. The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that: Keys left in the controls. At locations and equipment identified, on or about 2/25/99: Mechanical power press using part revolution clutches and were capable of continuous stroke functions as the keys to initiate continuous run were left in the machine for the operator discretion, exposing the operator to point of operation hazards. a)Press room, SWO# 4786, Part Revolution Power Press, Control keys left in the press. b)Press room, SWO# 4797, Part Revolution Power Press, control keys left in the press. c)Press room, SWO# 4782, Part Revolution Power Press, control keys left in the press.
1910.217 C03 VIII
- Issued
- Jul 23, 1999
- Abate by
- Jul 28, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.219 C04 I
- Issued
- Jul 23, 1999
- Abate by
- Sep 23, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.219 D01
- Issued
- Jul 23, 1999
- Abate by
- Jul 28, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.219 E01 I
- Issued
- Jul 23, 1999
- Abate by
- Jul 28, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.242 B
- Issued
- Jul 23, 1999
- Abate by
- Jul 28, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.252 A02 II
- Issued
- Jul 23, 1999
- Abate by
- Jul 28, 1999
- Penalty
- Initial $4,000 · Current $4,000
1910.253 B05 III
- Issued
- Jul 23, 1999
- Abate by
- Jul 28, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.255 E
- Issued
- Jul 23, 1999
- Abate by
- Jul 28, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.303 F
- Issued
- Jul 23, 1999
- Abate by
- Jul 28, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.303 G02 I
- Issued
- Jul 23, 1999
- Abate by
- Jul 28, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.304 A02
- Issued
- Jul 23, 1999
- Abate by
- Jul 28, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.304 E01 IV
- Issued
- Jul 23, 1999
- Abate by
- Jul 28, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.304 F05 V
- Issued
- Jul 23, 1999
- Abate by
- Jul 28, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.305 B01
- Issued
- Jul 23, 1999
- Abate by
- Jul 28, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.305 B02
- Issued
- Jul 23, 1999
- Abate by
- Jul 28, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.305 G01 III
- Issued
- Jul 23, 1999
- Abate by
- Jul 28, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.305 G02 III
- Issued
- Jul 23, 1999
- Abate by
- Jul 28, 1999
- Penalty
- Initial $5,500 · Current $5,500
1910.1200 F05 I
- Issued
- Jul 23, 1999
- Abate by
- Jul 28, 1999
- Penalty
- Initial $4,000 · Current $4,000
More inspections at Crouse Hinds DIV of Cooper Industries
View Crouse Hinds DIV of Cooper Industries's full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in NY
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 106901085.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.