BROOKLYLN, NY —
OSHA Inspection: RICE MOHAWK U.S. CONSTRUCTION CO. LTD
Unprogrammed Related inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Related safety inspection of RICE MOHAWK U.S. CONSTRUCTION CO. LTD in MEEKER AVENUE VIADUCT, BROOKLYLN, NY 11222 (NAICS 000000). OSHA activity number 106933195.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- RICE MOHAWK U.S. CONSTRUCTION CO. LTD
- Site address
- MEEKER AVENUE VIADUCT
- City
- BROOKLYLN
- State
- NY
- ZIP
- 11222
- Mailing
- 3940 PROVOST AVENUE, BRONX, NY 10466
What kind of inspection was it?
- Inspection type
- Unprogrammed Related (G)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Y
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 1791
- Employees
- 139
- Ownership type
- A
- Industry flags
- Construction safety.
Citations
2 citations on file for this inspection.
5(a)(1)
- Issued
- Sep 10, 1993
- Abate by
- Sep 15, 1993
- Penalty
- Initial $1,625 · Current $1,135 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likley to cause death or serious physical harm to employees in that employees were exposed to: (a) Jobsite - The hazard of being struck by or crushed by the collapse of unsupported steel during the dismantling operation; in that when cutters (burners) proceed the dismantling gangs, the stability of the structure shall be maintained until the members are removed, as required by ANSI A10.13 1989 15.16; on or about 5/10/93. ABATEMENT NOTE: Among other methods, one feasible and acceptable method to correct this hazard is when cutters (burners) proceed the dismantling gangs, the stability of the structure shall be maintained until the members are removed as required by ANSI A10.13 1989 15.16 and DOT Department of Steel construction manual. Acceptable methods of supporting the structure is by using temporary bolts or crane(s) as determined by engineering survey.
Recent events (2)
- — I (S) $1135.00
- — Z (S) $1625.00
1926.20 B02
- Issued
- Sep 10, 1993
- Abate by
- Sep 15, 1993
- Penalty
- Initial $1,625 · Current $1,135 Reduced
Recent events (2)
- — I (S) $1135.00
- — Z (S) $1625.00
More inspections at Rice Mohawk U.S. Construction CO. LTD
View Rice Mohawk U.S. Construction CO. LTD's full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in NY
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 106933195.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.