Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,197,549Inspections Most recent open 2026-08-27 Last loaded 2026-08-31

OSHA Inspection: PALESTINE CONCRETE TILE CO

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of PALESTINE CONCRETE TILE CO in 2500 W REAGAN ST, PALESTINE, TX 75801 (NAICS 000000). OSHA activity number 107551459.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Palestine Concrete Tile CO for free Get an email when a new federal OSHA severe-injury report for Palestine Concrete Tile CO is published. One employer, no account, unsubscribe in one click.
Site address
2500 W REAGAN ST
City
PALESTINE
State
TX
ZIP
75801
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
Non-union (N)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
000000
SIC code (legacy)
3271
Employees
20
Ownership type
Private (A)
Industry flags
Manufacturing safety.

22 citations on file for this inspection.

1910.147 C01

Serious Gravity 03 1 instance 3 exposed
Issued
Oct 13, 1993
Abate by
Nov 1, 1993
Penalty
Initial $7,500 · Current $750 Reduced
Recent events (2)
  • · I (S) $750.00
  • · Z (S) $7500.00

1910.23 D01 II

Serious Gravity 04 1 instance 3 exposed
Issued
Oct 5, 1993
Abate by
Oct 18, 1993
Penalty
Initial $750 · Current $413 Reduced
Recent events (2)
  • · I (S) $412.50
  • · Z (S) $750.00

1910.27 D03

Serious Gravity 05 1 instance 2 exposed
Issued
Oct 5, 1993
Abate by
Oct 18, 1993
Penalty
Initial $1,050 · Current $578 Reduced
Recent events (2)
  • · I (S) $577.50
  • · Z (S) $1050.00

1910.147 C01

Deleted Serious Gravity 03 1 instance 3 exposed
Issued
Oct 5, 1993
Abate by
Nov 1, 1993
Penalty
Initial $7,500
Recent events (3)
  • · I (S)
  • · A (S) $750.00
  • · Z (S) $7500.00

1910.147 C05 I

Deleted Serious Gravity 03 2 instances 3 exposed
Issued
Oct 5, 1993
Abate by
Nov 1, 1993
Penalty
Initial $750
Recent events (2)
  • · I (S)
  • · Z (S) $750.00

1910.147 C06 I

Deleted Serious Gravity 03 1 instance 3 exposed
Issued
Oct 5, 1993
Abate by
Nov 1, 1993
Penalty
Initial $750
Recent events (2)
  • · I (S)
  • · Z (S) $750.00

1910.147 C07 I

Deleted Serious Gravity 03 1 instance 3 exposed
Issued
Oct 5, 1993
Abate by
Nov 1, 1993
Penalty
Initial $750
Recent events (2)
  • · I (S)
  • · Z (S) $750.00

1910.212 A01

Serious Gravity 05 1 instance 2 exposed
Issued
Oct 5, 1993
Abate by
Oct 18, 1993
Penalty
Initial $1,050 · Current $525 Reduced
Recent events (2)
  • · I (S) $525.00
  • · Z (S) $1050.00

1910.219 D01

Deleted Serious Gravity 05 1 instance 3 exposed
Issued
Oct 5, 1993
Abate by
Oct 18, 1993
Penalty
Initial $1,050
Recent events (2)
  • · I (S)
  • · Z (S) $1050.00

1910.219 E03 I

Deleted Serious Gravity 05 1 instance 3 exposed
Issued
Oct 5, 1993
Abate by
Oct 18, 1993
Penalty
Initial $1,050
Recent events (2)
  • · I (S)
  • · Z (S) $1050.00

1910.1200 F05 I

Other-than-serious Gravity 04 1 instance 2 exposed
Issued
Oct 5, 1993
Abate by
Oct 18, 1993
Penalty
Initial $750 · Current $100 Reduced
Recent events (2)
  • · I (O) $100.00
  • · Z (S) $750.00

1910.1200 F05 II

Other-than-serious Gravity 04 1 instance 2 exposed
Issued
Oct 5, 1993
Abate by
Oct 18, 1993
Penalty
Initial $750 · Current $100 Reduced
Recent events (2)
  • · I (O) $100.00
  • · Z (S) $750.00

1910.147 C05 I

Serious Gravity 03 1 instance 3 exposed
Issued
Oct 5, 1993
Abate by
Nov 1, 1993

1910.147 C06 I

Serious Gravity 03 1 instance 3 exposed
Issued
Oct 5, 1993
Abate by
Nov 1, 1993
Penalty
Current $750
Recent events (2)
  • · I (S) $750.00
  • · Z (S)

1910.147 C07 I

Serious Gravity 03 1 instance 3 exposed
Issued
Oct 5, 1993
Abate by
Nov 1, 1993
Recent events (2)
  • · I (S)
  • · Z (S)

1910.219 D01

Serious Gravity 05 1 instance 3 exposed
Issued
Oct 5, 1993
Abate by
Oct 18, 1993
Penalty
Current $1,050
Recent events (1)
  • · Q $1050.00

1910.219 E03 I

Serious Gravity 05 1 instance 3 exposed
Issued
Oct 5, 1993
Abate by
Oct 18, 1993

1910.37 Q01

Other-than-serious Gravity 01 1 instance 10 exposed
Issued
Oct 5, 1993
Abate by
Nov 1, 1993

1910.38 A01

Other-than-serious Gravity 01 1 instance 20 exposed
Issued
Oct 5, 1993
Abate by
Nov 1, 1993

1910.106 D06 IV

Other-than-serious Gravity 01 1 instance 2 exposed
Issued
Oct 5, 1993
Abate by
Oct 18, 1993

1910.157 G01

Other-than-serious Gravity 01 1 instance 20 exposed
Issued
Oct 5, 1993
Abate by
Nov 1, 1993

1910.180 D04

Other-than-serious Gravity 01 1 instance 2 exposed
Issued
Oct 5, 1993
Abate by
Nov 1, 1993

View Palestine Concrete Tile CO's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 107551459.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.