Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: MATSUSHITA ELECTRIC OF P R INC

Referral inspection · Health discipline

On , OSHA opened a referral health inspection of MATSUSHITA ELECTRIC OF P R INC in PARQUE INDUSTRIAL VELAZQUEZ, CAGUAS, PR 00725 (NAICS 000000). OSHA activity number 108080995.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Matsushita Electric of P R INC — free Get an email when a new federal OSHA severe-injury report for Matsushita Electric of P R INC is published. One employer, no account, unsubscribe in one click.
Site address
PARQUE INDUSTRIAL VELAZQUEZ
City
CAGUAS
State
PR
ZIP
00725
Mailing
PO BOX 184, CAGUAS, PR 00725
Inspection type
Referral (C)
Scope
Complete (A)
Discipline
Health
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
000000
SIC code (legacy)
2517
Employees
400
Ownership type
A
Industry flags
Manufacturing health.

30 citations on file for this inspection.

6A0001

Serious 1 instance 1 exposed
Issued
Sep 1, 1989
Abate by
Sep 5, 1989
Penalty
Initial $600 · Current $600
Recent events (2)
  • — L (S) $600.00
  • — Z (S) $600.00

1910.95 B01

Serious 1 instance 40 exposed
Issued
Sep 1, 1989
Abate by
Sep 5, 1989
Penalty
Initial $900 · Current $750 Reduced
Recent events (2)
  • — L (S) $750.00
  • — Z (S) $900.00

1910.95 G01

Serious 1 instance 110 exposed
Issued
Sep 1, 1989
Abate by
Sep 5, 1989
Penalty
Initial $1,000 · Current $750 Reduced
Recent events (2)
  • — L (S) $750.00
  • — Z (S) $1000.00

1910.95 I02 IIA

Serious 4 instances 1 exposed
Issued
Sep 1, 1989
Abate by
Sep 5, 1989
Penalty
Initial $800 · Current $750 Reduced
Recent events (2)
  • — L (S) $750.00
  • — Z (S) $800.00

1910.133 A01

Serious 4 instances 10 exposed
Issued
Sep 1, 1989
Abate by
Sep 5, 1989
Penalty
Initial $900 · Current $900
Recent events (2)
  • — L (S) $900.00
  • — Z (S) $900.00

1910.178 G02

Serious 1 instance 100 exposed
Issued
Sep 1, 1989
Abate by
Sep 5, 1989
Penalty
Initial $400 · Current $750
Recent events (2)
  • — L (S) $750.00
  • — Z (S) $400.00

1910.22 A01

Serious 5 instances 50 exposed
Issued
Sep 1, 1989
Abate by
Sep 5, 1989
Penalty
Initial $1,000 · Current $700 Reduced
Recent events (2)
  • — L (S) $700.00
  • — Z (S) $1000.00

1910.22 A01

Serious 9 instances 90 exposed
Issued
Sep 1, 1989
Abate by
Sep 5, 1989
Recent events (2)
  • — L (S)
  • — Z (S)

1910.219 F03

Serious 1 instance 1 exposed
Issued
Sep 1, 1989
Abate by
Sep 2, 1989
Penalty
Initial $500 · Current $700
Recent events (2)
  • — L (S) $700.00
  • — Z (S) $500.00

1910.1000 C

Serious 1 instance 20 exposed
Issued
Sep 1, 1989
Abate by
Sep 23, 1989
Penalty
Initial $1,000 · Current $1,000
Recent events (2)
  • — L (S) $1000.00
  • — Z (S) $1000.00

1910.1200 D06

Serious 4 instances 400 exposed
Issued
Sep 1, 1989
Abate by
Sep 5, 1989
Penalty
Initial $500 · Current $500
Recent events (2)
  • — L (S) $500.00
  • — Z (S) $500.00

1910.1200 F04 II

Serious 4 instances 10 exposed
Issued
Sep 1, 1989
Abate by
Sep 5, 1989
Penalty
Initial $1,000 · Current $1,000
Recent events (2)
  • — L (S) $1000.00
  • — Z (S) $1000.00

1910.1200 G08

Serious 4 instances 400 exposed
Issued
Sep 1, 1989
Abate by
Sep 5, 1989
Penalty
Initial $1,000 · Current $1,000
Recent events (2)
  • — L (S) $1000.00
  • — Z (S) $1000.00

1910.1200 H

Serious 1 instance 10 exposed
Issued
Sep 1, 1989
Abate by
Sep 5, 1989
Recent events (2)
  • — L (S)
  • — Z (S)

1910.1200 H01

Serious 4 instances 10 exposed
Issued
Sep 1, 1989
Abate by
Sep 5, 1989
Recent events (2)
  • — L (S)
  • — Z (S)

1910.22 B01

Willful 4 instances 50 exposed
Issued
Sep 1, 1989
Abate by
Sep 5, 1989
Penalty
Initial $10,000 · Current $700 Reduced
Recent events (2)
  • — L (W) $700.00
  • — Z (W) $10000.00

1910.95 C01

Willful 1 instance 60 exposed
Issued
Sep 1, 1989
Abate by
Jan 10, 1990
Penalty
Initial $10,000 · Current $700 Reduced
Recent events (2)
  • — L (W) $700.00
  • — Z (W) $10000.00

1910.95 D01

Willful 1 instance 60 exposed
Issued
Sep 1, 1989
Abate by
Sep 30, 1989
Recent events (2)
  • — L (W)
  • — Z (W)

1910.95 D01

Willful 1 instance 100 exposed
Issued
Sep 1, 1989
Abate by
Sep 5, 1989
Recent events (2)
  • — L (W)
  • — Z (W)

1910.95 G05 I

Willful 1 instance 100 exposed
Issued
Sep 1, 1989
Abate by
Oct 30, 1989
Recent events (2)
  • — L (W)
  • — Z (W)

1910.95 I01

Willful 1 instance 60 exposed
Issued
Sep 1, 1989
Abate by
Sep 5, 1989
Recent events (2)
  • — L (W)
  • — Z (W)

1910.95 K01

Willful 1 instance 60 exposed
Issued
Sep 1, 1989
Abate by
Oct 20, 1989
Recent events (2)
  • — L (W)
  • — Z (W)

1910.178 M01

Willful 4 instances 12 exposed
Issued
Sep 1, 1989
Abate by
Sep 5, 1989
Penalty
Initial $10,000 · Current $700 Reduced
Recent events (2)
  • — L (W) $700.00
  • — Z (W) $10000.00

1910.213 C03

Willful 1 instance 1 exposed
Issued
Sep 1, 1989
Abate by
Sep 5, 1989
Penalty
Initial $6,000 · Current $700 Reduced
Recent events (2)
  • — L (W) $700.00
  • — Z (W) $6000.00

1910.242 B

Willful 1 instance 20 exposed
Issued
Sep 1, 1989
Abate by
Sep 5, 1989
Penalty
Initial $10,000 · Current $700 Reduced
Recent events (2)
  • — L (W) $700.00
  • — Z (W) $10000.00

1910.242 B

Willful 4 instances 120 exposed
Issued
Sep 1, 1989
Abate by
Sep 5, 1989
Recent events (2)
  • — L (W)
  • — Z (W)

1910.1200 G01

Willful 4 instances 120 exposed
Issued
Sep 1, 1989
Abate by
Sep 5, 1989
Penalty
Initial $10,000 · Current $700 Reduced
Recent events (2)
  • — L (W) $700.00
  • — Z (W) $10000.00

1910.1048 M01 I

Willful 1 instance 60 exposed
Issued
Sep 1, 1989
Abate by
Sep 5, 1989
Penalty
Initial $10,000 · Current $700 Reduced
Recent events (2)
  • — L (W) $700.00
  • — Z (W) $10000.00

1910.1048 M04 I

Willful 1 instance 80 exposed
Issued
Sep 1, 1989
Abate by
Sep 5, 1989
Recent events (2)
  • — L (W)
  • — Z (W)

1910.132 A

Repeat 1 instance 1 exposed
Issued
Sep 1, 1989
Abate by
Sep 5, 1989
Recent events (2)
  • — L (R)
  • — Z (R)

View Matsushita Electric of P R INC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 108080995.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.