Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: TRACE CONSTRUCTION

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of TRACE CONSTRUCTION in (MARSH STORE 48) 35 NORTH LYNHURST DRIVE, INDIANAPOLIS, IN 46224 (NAICS 000000). OSHA activity number 108592874.

Watch Trace Construction — free Get an email when a new federal OSHA severe-injury report for Trace Construction is published. One employer, no account, unsubscribe in one click.
Establishment
TRACE CONSTRUCTION
Site address
(MARSH STORE 48) 35 NORTH LYNHURST DRIVE
City
INDIANAPOLIS
State
IN
ZIP
46224
Mailing
ATTN: SONNY SHETTERLEY 9128 FALL CREEK DR, PENDLETON, IN 46064
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Data loaded
NAICS code
000000
SIC code (legacy)
1771
Employees
6
Ownership type
A
Industry flags
Construction safety.

6 citations on file for this inspection.

1910.110 D10

Serious Gravity 09 2 instances 4 exposed
Issued
Apr 3, 1991
Abate by
Apr 6, 1991
Penalty
Initial $360 · Current $270 Reduced
Recent events (3)
  • — J (S) $270.00
  • — Y (S) $270.00
  • — Z (S) $360.00

1926.59 E01

Serious Gravity 05 1 instance 4 exposed
Issued
Apr 3, 1991
Abate by
Apr 11, 1992
Penalty
Initial $200 · Current $100 Reduced
Recent events (3)
  • — J (S) $100.00
  • — Y (S) $100.00
  • — Z (S) $200.00

1926.59 G01

Serious Gravity 05 1 instance 4 exposed
Issued
Apr 3, 1991
Abate by
Apr 11, 1992
Penalty
Initial $200 · Current $100 Reduced
Recent events (3)
  • — J (S) $100.00
  • — Y (S) $100.00
  • — Z (S) $200.00

1926.59 H

Serious Gravity 05 1 instance 4 exposed
Issued
Apr 3, 1991
Abate by
Apr 11, 1992
Penalty
Initial $200 · Current $100 Reduced
Recent events (3)
  • — J (S) $100.00
  • — Y (S) $100.00
  • — Z (S) $200.00

1926.152 C04 I

Serious Gravity 07 2 instances 4 exposed
Issued
Apr 3, 1991
Abate by
Apr 6, 1991
Penalty
Initial $280 · Current $210 Reduced
Recent events (3)
  • — J (S) $210.00
  • — Y (S) $210.00
  • — Z (S) $280.00

1926.153 B

Serious Gravity 05 1 instance 4 exposed
Issued
Apr 3, 1991
Abate by
Apr 11, 1992
Penalty
Initial $200 · Current $150 Reduced
Recent events (3)
  • — J (S) $150.00
  • — Y (S) $150.00
  • — Z (S) $200.00

View Trace Construction's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 108592874.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.