Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,191,473Inspections Most recent open 2026-07-28 Last loaded 2026-07-31

OSHA Inspection: H.J. RUSSELL/C.D. MOODY JOINT VENTURE

Accident-driven inspection · Safety discipline

On , OSHA opened an accident-driven safety inspection of H.J. RUSSELL/C.D. MOODY JOINT VENTURE in 350 SPELMAN LANE, ATLANTA, GA 30316 (NAICS 000000). OSHA activity number 108963885.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch H.J. Russell/C.D. Moody Joint Venture — free Get an email when a new federal OSHA severe-injury report for H.J. Russell/C.D. Moody Joint Venture is published. One employer, no account, unsubscribe in one click.
Site address
350 SPELMAN LANE
City
ATLANTA
State
GA
ZIP
30316
Mailing
504 FAIR STREET, ATLANTA, GA 30313
Inspection type
Accident-driven (A)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Data loaded
NAICS code
000000
SIC code (legacy)
1542
Employees
10
Ownership type
A
Industry flags
Construction safety.

5 citations on file for this inspection.

5(a)(1)

Serious Gravity 05 1 instance 5 exposed
Issued
Nov 17, 1994
Abate by
Nov 30, 1994
Penalty
Initial $2,450 · Current $2,000 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not
furnish employment and a place of employment which were free from
recognized hazards that
were causing or likely to cause death or serious physical harm to
employees in that employees
were exposed to being struck by falling materials:
(a)Westside - Ground level - Employees used reinforcing steel as lifting
device to
hoist 55 gallon metal drums that were partially filled with steel inbeds
to the roof
of four story building.
Among other methods one feasible and acceptable abatement method to correct
this hazard is to use only approved rigging equipment and procedures.
Recent events (2)
  • — I (S) $2000.00
  • — Z (S) $2450.00

1926.20 B02

Serious Gravity 10 1 instance 3 exposed
Issued
Nov 17, 1994
Abate by
Nov 30, 1994
Penalty
Initial $3,500 · Current $2,000 Reduced
Recent events (2)
  • — I (S) $2000.00
  • — Z (S) $3500.00

1926.21 B02

Serious Gravity 10 1 instance 1 exposed
Issued
Nov 17, 1994
Abate by
Nov 30, 1994
Penalty
Initial $3,500 · Current $2,000 Reduced
Recent events (2)
  • — I (S) $2000.00
  • — Z (S) $3500.00

1926.251 A01

Serious Gravity 03 1 instance 5 exposed
Issued
Nov 17, 1994
Abate by
Nov 30, 1994
Penalty
Initial $1,750 · Current $1,000 Reduced
Recent events (2)
  • — I (S) $1000.00
  • — Z (S) $1750.00

1926.703 A01

Serious Gravity 10 1 instance 2 exposed
Issued
Nov 17, 1994
Abate by
Nov 30, 1994
Penalty
Initial $3,500 · Current $3,000 Reduced
Recent events (2)
  • — I (S) $3000.00
  • — Z (S) $3500.00

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 108963885.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.