BRUNSWICK, GA ·
OSHA Inspection: HANLIN GROUP, INC. - LCP CHEMICALS, GEORGIA DIV.
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of HANLIN GROUP, INC. - LCP CHEMICALS, GEORGIA DIV. in ROSS ROAD, BRUNSWICK, GA 31521 (NAICS 000000). OSHA activity number 109005090.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- HANLIN GROUP, INC. - LCP CHEMICALS, GEORGIA DIV.
- Site address
- ROSS ROAD
- City
- BRUNSWICK
- State
- GA
- ZIP
- 31521
- Mailing
- P.O. BOX 1558, BRUNSWICK, GA 31521
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Union (Y)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 2812
- Employees
- 136
- Ownership type
- Private (A)
Citations
57 citations on file for this inspection.
5(a)(1)
- Issued
- Sep 3, 1992
- Abate by
- Oct 16, 1992
- Penalty
- Initial $4,500 · Current $2,250 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to the hazard of being struck by structural members and process equipment: (a) Saturation area - The reinforced concrete slab ceiling on the second floor above the break room and also above the C-405 brine pump, the L-504 spare acid brine pump and the C-419 spent brine pump were disintegrated in several areas and reinforcement bars were visible, on or about 3/29/92. (b) Salt Plant - The Number 1 brine clarifier tank used for filter waste from the Salt Plant was corroded and leaking around the circumference of the metal tank along a seam towards the bottom, rested on horizontal I-beams upon four (4) concrete piers, had several I-beams that were corroded to the point of having lost substantial parts and had some cracked concrete piling(s), on or about 3/29/92. (c) Salt Plant - Structural beams, columns and connections in proximity to failed salt bulk loader tank BL Number 1 were severe- ly damaged and the support for BL Number 2 was greatly reduced by corrosion, on or about 3/29/92. (d) Number 1 Cell Room - The upper section of block wall was separated from the lower section of block at the salaried break room at the west end of the room on the second floor, on or about 3/29/92. (e) Bleach Plant - At the injection area platform above the reaction tanks, the hanger for a 1-inch caustic injection line for B-100 caustic injector weak gas was disconnected and there were no hangers or supports for the 1-inch lines for the B-101 caustic injector weak and strong gas, on or about 3/12/92. (f) Salt Plant - A 1-inch air line west of the brine filter aid mix tank had a hanger disconnected and the 4-inch chlorinated brine air blow tower piping did not have hangers or supports, on or about 3/12/92. (g) Products Area - A 1-1/2 inch fiberglass muriatic acid (dump) line from the Number 4 HCL burner had two (2) hangers disconnected, a 1/2-inch hydrochloric acid line (for circulation on the scrubber) did not have hangers or support, a 1/2-inch hydrochloric acid line to Number 4 burner tails tower was not provided with support, and a 1/2-inch air line at the sulfuric acid storage tank dike did not have hangers, on or about 3/18/92. (h) Boiler House - A 1/2-inch water line for the emergency hydrogen shut-off water flood did not have hangers or supports, the mercury bleed-off trap piping by the separator at the feed line to the hydrogen boiler was not provided with supports, a 1/2-inch air line at the south side of the hygdrogen boiler had supports missing and the constant flow blow-down steam lines at the north side of the hydrogen boiler were missing hangers or supports from the damper to the west column, on or about 3/19/92. Among other methods, one feasible and acceptable method to correct this hazard is: (a) Upgrade the structures back to their original condition and maintain pipeline systems with enough support to maintain the piping.
Recent events (2)
- · F (S) $2250.00
- · Z (S) $4500.00
5(a)(1)
- Issued
- Sep 3, 1992
- Abate by
- Oct 15, 1993
- Penalty
- Initial $3,150 · Current $1,575 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to the hazards of contacting hazardous chemicals: (a) Plant - Pipelines and valve outlets for piping systems were not all labelled, including but not limited to chlorine, hydrogen, mercury, brine (chlorinated, saturated), acids (hydrochloric, sulfuric), caustics (sodium hydroxide, sodium hypochlorite), propane, diesel fuel, water (raw, city, deionized), and steam, on or about 3/11/92. (b) Number 1 Cell Room - The 6-inch cell brine lines had 4 of 8 bolts missing from their flange couplings, there were 3 of 8 flange bolts missing for cell 13 strong gas chlorine valve at the one- half inch suction, 2 of 8 bolts were missing for cell 14 weak gas valve flange at 4-5 inch suction, 5 of 8 bolts were missing for cell 15 strong gas valve flange, 4 of 8 bolts were missing at the trap-end spent brine drop-tube flange coupling for the 6-inch gravity flow drain, and at the lower level, a flange coupling for a 10-inch gravity flow spent brine line had 12 of 24 bolts mis- sing, on or about 3/11/92. (c) Products Area - At the walkway to the chlorine receivers, the chlorine venting manifold T-flange couplings by Number 2 chlorine receiver were mismatched and jerrybuilt with a 4-bolt flange bolted to an 8-belt flange and two 8-bolt T-flanges of different bolt patterns bolted together with 4-bolts in a redesigned pattern (re-machined), 11 of 16 bolts were missing from the gate valve flange coupling for the Number 1 Tarrier chlorine unit vent chimney for the rupture disk as well as 12 of 16 bolts missing for Number 2 and 8 of 16 missing for Number 3, on or about 3/18/92. Among other methods, one feasible and acceptable abatement method to correct this hazard is: (a) Identify piping system contents in accordance with ANSI "Scheme for the Identification of Piping Systems",ANSI A13.1, and use the number of bolts for flange couplings in accordance with the bolt pattern.
Recent events (2)
- · F (S) $1575.00
- · Z (S) $3150.00
5(a)(1)
- Issued
- Sep 3, 1992
- Abate by
- Jun 30, 1993
- Penalty
- Initial $3,150 · Current $1,575 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety awnd Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to the hazard of being struck by equipment: (a) Salt Plant - The CATERPILLAR front-end loader (Number 1) was operated with an inoperable backup alarm, a cracked rear window and a frozen emergency brake to move salt and to load a hopper for a bucket conveyor system, on or about 3/11/92. (b) Salt Plant - No back-up alarm or signalman for WHITE-GMC dump trucks Numbers 4041/601712 and Number 4051/601711 used to deliver salt and both vehicles had hydraulic leaks for the dump mechanisms, on or about 3/12/92. Among other methods, one feasible and acceptable abatement method to correct this hazard is: Always inspect the equipment prior to use and correct any deficiencies prior to operation.
Recent events (2)
- · F (S) $1575.00
- · Z (S) $3150.00
5(a)(1)
- Issued
- Sep 3, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $3,150 · Current $1,575 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The %% employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to the hazard of being thrown from mobile equipment: (a) Road east of the Bleach Plant - The operator of the Model 440-B Melroe Company BOBCAT skidsteer front-end loader was operating the equipment without using the seatbelt, on or about 3/18/92. (b) Salt Plant - The CATERPILLAR front-end loader (Number 1) was used to move salt and load a hopper for a bucket conveyor system and the operator did not use the seatbelt, on or about 3/11/92. Among other methods, one feasible and acceptable abatement method to correct this hazard is: (a) Require the use of seatbelts.
Recent events (2)
- · F (S) $1575.00
- · Z (S) $3150.00
5(a)(1)
- Issued
- Sep 3, 1992
- Abate by
- Oct 15, 1993
- Penalty
- Initial $2,250 · Current $1,125 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish exployment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to thermal burns: (a) Number 1 Cell Room - Identical AIR KING quick disconnect union connections were used for steam pipeline system station outlets as well as for plant air and deionized water, on or about 3/11/92. Among other methods, one feasible and acceptable abatement method to correct this hazard it: (a) To provide pipeline system station outlets with different union connections such that a hose for air or water will not connect to a steam pipeline system station outlet.
Recent events (2)
- · F (S) $1125.00
- · Z (S) $2250.00
1910.22 A02
- Issued
- Sep 3, 1992
- Abate by
- Oct 1, 1993
- Penalty
- Initial $1,800 · Current $900 Reduced
Recent events (2)
- · F (S) $900.00
- · Z (S) $1800.00
1910.22 A03
- Issued
- Sep 3, 1992
- Abate by
- Oct 16, 1992
Recent events (2)
- · F (S)
- · Z (S)
1910.22 C
- Issued
- Sep 3, 1992
- Abate by
- Sep 24, 1992
- Penalty
- Initial $1,350 · Current $675 Reduced
Recent events (2)
- · F (S) $675.00
- · Z (S) $1350.00
1910.23 C01
- Issued
- Sep 3, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,250 · Current $1,125 Reduced
Recent events (2)
- · F (S) $1125.00
- · Z (S) $2250.00
1910.23 E03 IV
- Issued
- Sep 3, 1992
- Abate by
- Sep 8, 1992
Recent events (2)
- · F (S)
- · Z (S)
1910.27 F
- Issued
- Sep 3, 1992
- Abate by
- Oct 16, 1992
- Penalty
- Initial $2,250 · Current $1,125 Reduced
Recent events (2)
- · F (S) $1125.00
- · Z (S) $2250.00
1910.36 B04
- Issued
- Sep 3, 1992
- Abate by
- Sep 17, 1992
- Penalty
- Initial $3,150 · Current $1,575 Reduced
Recent events (2)
- · F (S) $1575.00
- · Z (S) $3150.00
1910.37 A
- Issued
- Sep 3, 1992
- Abate by
- Oct 16, 1992
Recent events (2)
- · F (S)
- · Z (S)
1910.37 G02
- Issued
- Sep 3, 1992
- Abate by
- Oct 16, 1992
Recent events (2)
- · F (S)
- · Z (S)
1910.37 K01
- Issued
- Sep 3, 1992
- Abate by
- Jun 1, 1993
Recent events (2)
- · F (S)
- · Z (S)
1910.37 K02
- Issued
- Sep 3, 1992
- Abate by
- Oct 16, 1992
Recent events (2)
- · F (S)
- · Z (S)
1910.37 Q01
- Issued
- Sep 3, 1992
- Abate by
- Sep 24, 1992
Recent events (2)
- · F (S)
- · Z (S)
1910.37 Q02
- Issued
- Sep 3, 1992
- Abate by
- Sep 24, 1992
Recent events (2)
- · F (S)
- · Z (S)
1910.147 C02 II
- Issued
- Sep 3, 1992
- Abate by
- Sep 24, 1992
- Penalty
- Initial $1,800 · Current $900 Reduced
Recent events (2)
- · F (S) $900.00
- · Z (S) $1800.00
1910.147 C04 I
- Issued
- Sep 3, 1992
- Abate by
- Sep 24, 1992
Recent events (2)
- · F (S)
- · Z (S)
1910.147 C05 IIA
- Issued
- Sep 3, 1992
- Abate by
- Sep 24, 1992
Recent events (2)
- · F (S)
- · Z (S)
1910.147 C05 IIA
- Issued
- Sep 3, 1992
- Abate by
- Sep 24, 1992
Recent events (2)
- · F (S)
- · Z (S)
1910.147 C05 IIA
- Issued
- Sep 3, 1992
- Abate by
- Sep 24, 1992
Recent events (2)
- · F (S)
- · Z (S)
1910.147 C05 IIC
- Issued
- Sep 3, 1992
- Abate by
- Sep 24, 1992
Recent events (2)
- · F (S)
- · Z (S)
1910.156 B01
- Issued
- Sep 3, 1992
- Abate by
- Sep 24, 1992
- Penalty
- Initial $4,500 · Current $2,250 Reduced
Recent events (2)
- · F (S) $2250.00
- · Z (S) $4500.00
1910.156 C01
- Issued
- Sep 3, 1992
- Abate by
- Sep 24, 1992
Recent events (2)
- · F (S)
- · Z (S)
1910.156 C04
- Issued
- Sep 3, 1992
- Abate by
- Sep 24, 1992
Recent events (2)
- · F (S)
- · Z (S)
1910.156 D
- Issued
- Sep 3, 1992
- Abate by
- Oct 16, 1992
Recent events (2)
- · F (S)
- · Z (S)
1910.156 E01 I
- Issued
- Sep 3, 1992
- Abate by
- Sep 24, 1992
Recent events (2)
- · F (S)
- · Z (S)
1910.157 F14
- Issued
- Sep 3, 1992
- Abate by
- Sep 24, 1992
Recent events (2)
- · F (S)
- · Z (S)
1910.178 A02
- Issued
- Sep 3, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $1,800 · Current $900 Reduced
Recent events (2)
- · F (S) $900.00
- · Z (S) $1800.00
1910.178 A06
- Issued
- Sep 3, 1992
- Abate by
- Sep 8, 1992
Recent events (2)
- · F (S)
- · Z (S)
1910.179 J03
- Issued
- Sep 3, 1992
- Abate by
- Sep 24, 1992
- Penalty
- Initial $1,800 · Current $900 Reduced
Recent events (2)
- · F (S) $900.00
- · Z (S) $1800.00
1910.179 L03 I
- Issued
- Sep 3, 1992
- Abate by
- Oct 15, 1993
Recent events (2)
- · F (S)
- · Z (S)
1910.212 A01
- Issued
- Sep 3, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,250 · Current $1,125 Reduced
Recent events (2)
- · F (S) $1125.00
- · Z (S) $2250.00
1910.212 A02
- Issued
- Sep 3, 1992
- Abate by
- Sep 8, 1992
Recent events (2)
- · F (S)
- · Z (S)
1910.215 B09
- Issued
- Sep 3, 1992
- Abate by
- Sep 17, 1992
- Penalty
- Initial $1,800 · Current $900 Reduced
Recent events (2)
- · F (S) $900.00
- · Z (S) $1800.00
1910.219 E03 I
- Issued
- Sep 3, 1992
- Abate by
- Oct 16, 1992
- Penalty
- Initial $1,800 · Current $900 Reduced
Recent events (2)
- · F (S) $900.00
- · Z (S) $1800.00
1910.219 I02
- Issued
- Sep 3, 1992
- Abate by
- Oct 16, 1992
- Penalty
- Initial $1,350 · Current $675 Reduced
Recent events (2)
- · F (S) $675.00
- · Z (S) $1350.00
1910.253 B05 IIG
- Issued
- Sep 3, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $1,350 · Current $675 Reduced
Recent events (2)
- · F (S) $675.00
- · Z (S) $1350.00
1910.303 B01
- Issued
- Sep 3, 1992
- Abate by
- Oct 16, 1992
- Penalty
- Initial $1,800 · Current $900 Reduced
Recent events (2)
- · F (S) $900.00
- · Z (S) $1800.00
1910.305 A01 I
- Issued
- Sep 3, 1992
- Abate by
- Sep 24, 1992
Recent events (2)
- · F (S)
- · Z (S)
1910.305 G02 II
- Issued
- Sep 3, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $1,350 · Current $675 Reduced
Recent events (2)
- · F (S) $675.00
- · Z (S) $1350.00
1910.22 A02
- Issued
- Sep 3, 1992
- Abate by
- Oct 16, 1992
- Penalty
- Initial $31,500 · Current $15,750 Reduced
Recent events (2)
- · F (W) $15750.00
- · Z (W) $31500.00
1910.23 D01 III
- Issued
- Sep 3, 1992
- Abate by
- Oct 16, 1992
Recent events (2)
- · F (O)
- · Z (O)
1910.23 D01 IV
- Issued
- Sep 3, 1992
- Abate by
- Oct 16, 1992
Recent events (2)
- · F (O)
- · Z (O)
1910.24 F
- Issued
- Sep 3, 1992
- Abate by
- Oct 16, 1992
Recent events (2)
- · F (O)
- · Z (O)
1910.25 D01 X
- Issued
- Sep 3, 1992
- Abate by
- Sep 17, 1992
Recent events (2)
- · F (O)
- · Z (O)
1910.27 D01 IV
- Issued
- Sep 3, 1992
- Abate by
- Oct 16, 1992
Recent events (2)
- · F (O)
- · Z (O)
1910.141 A05
- Issued
- Sep 3, 1992
- Abate by
- Oct 15, 1993
Recent events (2)
- · F (O)
- · Z (O)
1910.157 C04
- Issued
- Sep 3, 1992
- Abate by
- Sep 17, 1992
Recent events (2)
- · F (O)
- · Z (O)
1910.213 H04
- Issued
- Sep 3, 1992
- Abate by
- Sep 24, 1992
Recent events (2)
- · F (O)
- · Z (O)
1910.219 P01
- Issued
- Sep 3, 1992
- Abate by
- Sep 17, 1992
Recent events (2)
- · F (O)
- · Z (O)
1910.305 A02
- Issued
- Sep 3, 1992
- Abate by
- Sep 24, 1992
Recent events (2)
- · F (O)
- · Z (O)
1910.305 B02
- Issued
- Sep 3, 1992
- Abate by
- Aug 31, 1993
Recent events (2)
- · F (O)
- · Z (O)
1910.334 A02 I
- Issued
- Sep 3, 1992
- Abate by
- Sep 8, 1992
Recent events (2)
- · F (O)
- · Z (O)
1910.178 P01
- Issued
- Aug 31, 1992
- Abate by
- Sep 3, 1992
Recent events (2)
- · F (S)
- · Z (S)
More inspections at Hanlin Group, INC. - LCP Chemicals, Georgia DIV.
View Hanlin Group, INC. - LCP Chemicals, Georgia DIV.'s full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in GA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 109005090.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.