FT. MYERS, FL ·
OSHA Inspection: ADVANCED TOWER SERVICE & ERECTIONS, INC.
Accident-driven inspection · Safety discipline
At a glance
On , OSHA opened an accident-driven safety inspection of ADVANCED TOWER SERVICE & ERECTIONS, INC. in 2501 ORTIZ AVENUE, FT. MYERS, FL 33905 (NAICS 000000). OSHA activity number 109016030.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- ADVANCED TOWER SERVICE & ERECTIONS, INC.
- Site address
- 2501 ORTIZ AVENUE
- City
- FT. MYERS
- State
- FL
- ZIP
- 33905
- Mailing
- 122 DAIRY RD., AUBURNDALE, FL 33823
What kind of inspection was it?
- Inspection type
- Accident-driven (A)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (N)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 1791
- Employees
- 24
- Ownership type
- Private (A)
- Industry flags
- Construction safety.
Citations
2 citations on file for this inspection.
5(a)(1)
- Issued
- Jun 18, 1996
- Abate by
- Jul 21, 1996
- Penalty
- Initial $1,500 · Current $1,500
General-duty citation text
Section 5(a)(1) of the Occupational Safety and health Act of 1970: The %% employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to a failure of an unsecured structure: a) On site at 2501 Ortiz Avenue, Ft. Myers, FL - Employees dismantling a 300 foot high Rohn 55G communications tower were exposed to a 200 foot wall when the bolts holding the top 60 feet of tower removed with the employees on the unguyed sections above the 140 foot level, on or about 05/03/96. Among other methods, feasible and acceptable abatement includes, but may not be limited to: 1. The employer shall make certain that the foreman thoroughly understands his briefing on the sequence and procedure of dismantling operations in order to maintain the stability of the structure. 2. When employees precede the dismantling crew to prepare the structure so that it can be easily taken down, the employee shall make certain that enough bolts are left in a connection to support the structure, plus the expected load. 3. Dismantling operations shall be planned with a definite sequence, and employees instructed in the dismantling process. 4. The different phases of the work shall be closely coordinated, so that one does not create a hazard for another. 5. During dismantling operations continuing inspections shall be made as the work progresses to detect hazards.
Recent events (2)
- · I (S) $1500.00
- · Z (S) $1500.00
1926.850 A
- Issued
- Jun 18, 1996
- Abate by
- Jul 21, 1996
- Penalty
- Initial $1,500 · Current $1,500
Recent events (2)
- · I (S) $1500.00
- · Z (S) $1500.00
More inspections at Advanced Tower Service & Erections, INC.
View Advanced Tower Service & Erections, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in FL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 109016030.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.