MABLETON, GA —
OSHA Inspection: RDR FOWLER, INCORPORATED
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of RDR FOWLER, INCORPORATED in 899R BANKHEAD HIGHWAY, SW, MABLETON, GA 30059 (NAICS 000000). OSHA activity number 109076364.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- RDR FOWLER, INCORPORATED
- Site address
- 899R BANKHEAD HIGHWAY, SW
- City
- MABLETON
- State
- GA
- ZIP
- 30059
- Mailing
- P.O. BOX 760, MABLETON, GA 30059
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 2434
- Employees
- 17
- Ownership type
- A
- Industry flags
- Manufacturing safety.
Citations
21 citations on file for this inspection.
5(a)(1)
- Issued
- Aug 13, 1993
- Abate by
- Sep 30, 1993
- Penalty
- Initial $1,500 · Current $800 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The %% employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to: (a) 899 R Bankhead Hwy., Mableton, GA - Employees exposed to danger from PVC pipe carrying compressed air. Among other methods, one feasible and acceptable abatement method to correct this hazard is to replace PVC pipe with ABS pipe designed to transport compressed air and or other approved piping.
Recent events (2)
- — I (S) $800.00
- — Z (S) $1500.00
1910.106 E02 IIB2
- Issued
- Aug 13, 1993
- Abate by
- Sep 9, 1993
- Penalty
- Initial $750 · Current $200 Reduced
Recent events (2)
- — I (S) $200.00
- — Z (S) $750.00
1910.106 E06 II
- Issued
- Aug 13, 1993
- Abate by
- Sep 9, 1993
- Penalty
- Initial $750 · Current $400 Reduced
Recent events (2)
- — I (S) $400.00
- — Z (S) $750.00
1910.106 E07 IA
- Issued
- Aug 13, 1993
- Abate by
- Sep 30, 1993
- Penalty
- Initial $750 · Current $200 Reduced
Recent events (2)
- — I (S) $200.00
- — Z (S) $750.00
1910.107 C02
- Issued
- Aug 13, 1993
- Abate by
- Sep 30, 1993
- Penalty
- Initial $750 · Current $200 Reduced
Recent events (2)
- — I (S) $200.00
- — Z (S) $750.00
1910.107 E02
- Issued
- Aug 13, 1993
- Abate by
- Sep 9, 1993
- Penalty
- Initial $750 · Current $200 Reduced
Recent events (2)
- — I (S) $200.00
- — Z (S) $750.00
1910.107 G02
- Issued
- Aug 13, 1993
- Abate by
- Sep 9, 1993
- Penalty
- Initial $450 · Current $250 Reduced
Recent events (2)
- — I (S) $250.00
- — Z (S) $450.00
1910.147 C01
- Issued
- Aug 13, 1993
- Abate by
- Sep 30, 1993
- Penalty
- Initial $750 · Current $750
Recent events (2)
- — I (S) $750.00
- — Z (S) $750.00
1910.178 P01
- Issued
- Aug 13, 1993
- Abate by
- Sep 9, 1993
- Penalty
- Initial $450 · Current $250 Reduced
Recent events (2)
- — I (S) $250.00
- — Z (S) $450.00
1910.213 D01
- Issued
- Aug 13, 1993
- Abate by
- Sep 9, 1993
- Penalty
- Initial $750 · Current $750
1910.213 H01
- Issued
- Aug 13, 1993
- Abate by
- Sep 9, 1993
- Penalty
- Initial $750 · Current $300 Reduced
Recent events (2)
- — I (S) $300.00
- — Z (S) $750.00
1910.213 H03
- Issued
- Aug 13, 1993
- Abate by
- Aug 31, 1993
- Penalty
- Initial $750 · Current $300 Reduced
Recent events (2)
- — I (S) $300.00
- — Z (S) $750.00
1910.213 H04
- Issued
- Aug 13, 1993
- Abate by
- Sep 9, 1993
- Penalty
- Initial $450 · Current $200 Reduced
Recent events (2)
- — I (S) $200.00
- — Z (S) $450.00
1910.303 B01
- Issued
- Aug 13, 1993
- Abate by
- Sep 9, 1993
- Penalty
- Initial $450 · Current $250 Reduced
Recent events (2)
- — I (S) $250.00
- — Z (S) $450.00
1910.303 B02
- Issued
- Aug 13, 1993
- Abate by
- Sep 9, 1993
- Penalty
- Initial $450 · Current $250 Reduced
Recent events (2)
- — I (S) $250.00
- — Z (S) $450.00
1910.303 F
- Issued
- Aug 13, 1993
- Abate by
- Sep 9, 1993
- Penalty
- Initial $450 · Current $200 Reduced
Recent events (2)
- — I (S) $200.00
- — Z (S) $450.00
1910.305 B01
- Issued
- Aug 13, 1993
- Abate by
- Sep 9, 1993
- Penalty
- Initial $750 · Current $200 Reduced
Recent events (2)
- — I (S) $200.00
- — Z (S) $750.00
1910.305 A01 I
- Issued
- Aug 13, 1993
- Abate by
- Sep 9, 1993
- Penalty
- Initial $450 · Current $250 Reduced
Recent events (2)
- — I (S) $250.00
- — Z (S) $450.00
1910.305 G01 III
- Issued
- Aug 13, 1993
- Abate by
- Sep 9, 1993
- Penalty
- Initial $450 · Current $450
1903.2 A01
- Issued
- Aug 13, 1993
- Abate by
- Sep 9, 1993
- Penalty
- Initial $300 · Current $300
1904.2 A
- Issued
- Aug 13, 1993
- Abate by
- Sep 9, 1993
- Penalty
- Initial $300 · Current $300
More inspections at RDR Fowler, Incorporated
View RDR Fowler, Incorporated's full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in GA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 109076364.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.