SARANAC LAKE, NY ·
OSHA Inspection: M.A. BONIOVANNI,INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of M.A. BONIOVANNI,INC. in ROUTE 3 BLOOMINGDALE ROAD, SARANAC LAKE, NY 12983 (NAICS 000000). OSHA activity number 109870741.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- M.A. BONIOVANNI,INC.
- Site address
- ROUTE 3 BLOOMINGDALE ROAD
- City
- SARANAC LAKE
- State
- NY
- ZIP
- 12983
- Mailing
- 1400 JAMESVILLE AVE. P.O. BOX 147 COLVIN STA., SYRACUSE, NY 13205
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (N)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 1629
- Employees
- 23
- Ownership type
- Private (A)
- Industry flags
- Construction safety.
Citations
8 citations on file for this inspection.
1926.59 F05
- Issued
- Apr 2, 1993
- Abate by
- Apr 7, 1993
- Penalty
- Initial $1,600
Recent events (2)
- · I (O)
- · Z (S) $1600.00
1926.550 A09
- Issued
- Apr 2, 1993
- Abate by
- Apr 7, 1993
- Penalty
- Initial $2,000 · Current $1,300 Reduced
Recent events (2)
- · I (S) $1300.00
- · Z (S) $2000.00
1926.652 A01
- Issued
- Apr 2, 1993
- Abate by
- Apr 7, 1993
- Penalty
- Initial $2,000 · Current $1,300 Reduced
Recent events (2)
- · I (S) $1300.00
- · Z (S) $2000.00
1926.152 G09
- Issued
- Apr 2, 1993
- Abate by
- Apr 7, 1993
- Penalty
- Initial $3,200 · Current $196 Reduced
Recent events (2)
- · I (O) $196.00
- · Z (R) $3200.00
1926.152 G11
- Issued
- Apr 2, 1993
- Abate by
- Apr 7, 1993
- Penalty
- Initial $3,200 · Current $3,200
Recent events (2)
- · I (R) $3200.00
- · Z (R) $3200.00
1926.404 F06
- Issued
- Apr 2, 1993
- Abate by
- Apr 7, 1993
- Penalty
- Initial $160 · Current $104 Reduced
Recent events (2)
- · I (R) $104.00
- · Z (R) $160.00
1926.404 F07 IVC
- Issued
- Apr 2, 1993
- Abate by
- Apr 7, 1993
Recent events (2)
- · I (O)
- · Z (O)
1926.1052 C01
- Issued
- Apr 2, 1993
- Abate by
- Apr 7, 1993
- Penalty
- Initial $800
Recent events (2)
- · I (O)
- · Z (O) $800.00
More inspections in this industry (NAICS 000000)
More inspections in NY
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 109870741.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.