BIRMINGHAM, AL ·
OSHA Inspection: BRUNO'S DISTRIBUTION CENTER & DELIVERY
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of BRUNO'S DISTRIBUTION CENTER & DELIVERY in 300 RESEARCH PARKWAY, BIRMINGHAM, AL 35216 (NAICS 000000). OSHA activity number 110122827.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- BRUNO'S DISTRIBUTION CENTER & DELIVERY
- Site address
- 300 RESEARCH PARKWAY
- City
- BIRMINGHAM
- State
- AL
- ZIP
- 35216
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Y
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 4225
- Employees
- 1000
- Ownership type
- A
Citations
4 citations on file for this inspection.
5(a)(1)
- Issued
- Jan 21, 1992
- Abate by
- Mar 5, 1992
- Penalty
- Initial $4,250 · Current $1,200 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to: (a) Stacker Department and med-selector Department - employees were exposed to an unacceptable risk of musculoskeletal injuries, such as back injuries and muscle strains while performing various material handling tasks. An effective Musculoskeletal Injury Prevention Program had not been implemented. While ultimate responsibility for correcting the hazard rests with the employer, feasible and acceptable abatement methods to correct this hazard include: but are not limited to the following: (1) Identification of all current employees who experience symptoms of musculoskeletal injuries, (2) a survey of all work areas to identify any actions or stressors which may contribute to back and muscle injuries. (3) An ongoing comprehensive training an dawareness program which will ensure that all employees and manager possess a working knowledge of body mechanics, manual lifting and proper work techniques, (4) a work rotation program to give employees breaks from jobs that require constant manual lifting throughout the shift, rotate employees from jobs that require constant manual lifting to jobs that require less or no manual lifting, (5) a work conditioning program to help new employees adapt to the various material handling tasks, (6) an exercise program which provides warm up exercise and cool down exercise before and after each shift.
Recent events (2)
- · F (S) $1200.00
- · Z (S) $4250.00
1910.23 A09
- Issued
- Jan 21, 1992
- Abate by
- Mar 5, 1992
- Penalty
- Initial $1,700 · Current $700 Reduced
Recent events (2)
- · F (S) $700.00
- · Z (S) $1700.00
1910.178 M09
- Issued
- Jan 21, 1992
- Abate by
- Mar 5, 1992
- Penalty
- Initial $1,700 · Current $700 Reduced
Recent events (2)
- · F (S) $700.00
- · Z (S) $1700.00
1910.22 B02
- Issued
- Jan 21, 1992
- Abate by
- Mar 5, 1992
Recent events (2)
- · F (O)
- · Z (O)
More inspections in this industry (NAICS 000000)
More inspections in AL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 110122827.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.